Introduction
This installation guide has been produced for the IR2503CP infra red basin tap.
These instructions cover the installation, operation and maintenance. Please read the enclosed
instructions before commencing the installation of this product, please note;
We recommend that the installation of any Inta product is carried out by an
approved installer.
It is recommended, especially in hard water areas, that a water softener such as the ActivFlo or
ActivFlo lite be fitted to reduce the risk of calcium deposits forming.
Products
Infrared basin tap, copper tail and battery operated IR2503CP
Check Components
Before commencing remove all components from packaging and check each component with
the contents list.
Ensure all parts are present, before discarding any packaging. If any parts are missing, do not
attempt to install your Inta electronic tap until the missing parts have been obtained.
Some components are supplied pre-assembled to make installation easier.
Some components are supplied in a bag as a kit to prevent lose.
Pre-installation Information
Warning
Do not install the tap facing a mirror or any other electronic system operated by an infra red
sensor.
This tap is also vulnerable to stray sensor readings from users wearing high visibility or other
reflective clothing.
To prevent reflection problems, it is recommended to keep a minimum distance of 1.5m
between the tap and other objects.
Preparation for installation
Flush the water supply pipes thoroughly prior to installation. Do not allow debris, PTFE tape or
any metal particles to enter the tap.
Do not expose to temperatures below 5˚C, for example during winter. If the tap will be exposed
to freezing conditions the tap and system should be drained.
Important: All plumbing is to be installed in accordance with applicable codes and
regulations.
In case of temporary closing of the plant, purge the up-streaming water supply, before
re-opening the plant.
When supplying with pre-mixed water, we suggest the use of a thermostatic mixing valve and
installing a check valve in the supply.
When connecting the copper tail do not over tighten.