GeoVision GV-APOE0400 Manual de usuario

September 10, 2021
1
GV-APOE0400 6-Port 10/100 Mbps Unmanaged PoE Switch
with 4-Port PoE
1. Packing List
1. GV-APOE0400
2. AC Power Cord
3. Rubber Feet x 4
Note: If any of these items is found missing or damaged, please contact your local
supplier for replacement.

September 10, 2021
2
2. Front Panel
The front panel consists of 6 10/100 Mbps ports, 4 PoE and 2 uplink, LED indicators and the
DIP switch.
2.1 LED Indicator
LED Color/Status Description
Off No power supply
Power Orange System powered on
Off No devices connected to the corresponding port
Green Network through the corresponding port has been
successfully established
DATA
Blinking Green Data currently being sent through the
corresponding port
Off No PoE powered devices (PD) connected
Orange At least one device successfully powered through
PoE
PoE
Blinking Orange Abnormal power supply
2.2 DIP Switch
The DIP switch can switch on/off the CCTV mode of the system.
[Default Mode] The CCTV mode is switched off by default, in which power is supplied
through the 4 PoE ports over cables of up to 100 m (328 ft) with a network bandwidth of 100
Mbps per port.
[CCTV Mode] Allow power supply over cables of up to 250 m (820 ft) in length, but at the
expense of reducing the network bandwidth of the 4 PoE ports to 10 Mbps per port.
Note: After changing the CCTV mode, it is required to restart the system for the change to
take effect.

September 10, 2021
3
3. Rear Panel
The AC power socket for powering the system is located at the rear panel and accepts power
input from 100 to 240 V at 50/60 Hz.
4. Installation
Prior to installing the PoE switch, please note the following:
Only clean the switch when it is unplugged and with a dry cloth without involving any
liquids.
Do not place the switch near water or any damp area and prevent moisture from
entering the switch chassis.
Do not place the switch on an unstable surface where it may be severely damaged due
to a fall.
Ensure there is proper ventilation at the installation site and keep the ventilation of the
switch free of obstruction.
Make sure the operating voltage is consistent with as labeled on the switch.
Do not open the chassis during operation or when there are electrical hazards in
avoiding electric shocks.
4.1 Leveled Installation
Attach the four supplied rubber feet at the bottom of the switch and place it on a leveled
surface.
Note: Make sure to leave at least 10 cm of space around the switch for adequate
ventilation.

September 10, 2021
4
4.2 Wall Mount Installation
For wall mount, make sure to prepare 2 screws of 4 mm in length and 5.5 ~ 7 mm in
diameter and prepare 2 screw anchors of matching size.
1. Drill two evenly-leveled holes on the desired wall that are 122 mm apart.
2. Hammer the two self-prepared screw anchors into the holes on the wall.
3. Insert the two-self prepared screws into the screw anchors and tighten to the point where
there are about 1.5 mm left hanging out.
4. Hang the switch onto the screws with all of its ports pointing downward.
4.3 Powering On the Switch
To power on the switch, connect it to a power source using the supplied AC power cord. The
switch will respond as following upon turning on:
The Power LED is lit.
The DATA LED flashes momentarily, signaling system initiation.
Note: Make sure to leave at least 10 cm of space around the switch for adequate
ventilation.