
Thank you for being a valuable and loyal client of
STM. Our goal is to bring our customers the very
best in product quality and customer service. We
value your feedback and use it to evaluate what to
improve and/or update in our existing product line.
Please be advised that the Mini-RocketBox™ PLUS+
has a direct funneling system into your selected
pre-rolls when used properly. This means that
contaminate-free material being funneled from the
Top Trays into your pre-rolls will remain
contaminate-free through the direct filling process.
The Top Tray funnels are directly inserted into the
opening of your pre-roll cones and do not allow
anything other than what is being fed onto the Top
Tray.
Even with the direct funneling system, there is a
break-in period of 400 hours before any material
passes through the "crutch" or bottom of the pre-
roll onto the bottom of the "shaker box". This
material could be reused, but should still be visually
inspected for debris. Although we inspect each and
every part before it is sent; due to the intense
vibration, the break-in period is required.
After you have set up your Mini-RocketBox™ PLUS+, proceed to
run multiple cycles without material (at least 5 per set of trays
using different intensity setting on the motor) with each of your
tray systems and watch for debris in-between the trays and in the
shaker box bottom.
After the un-boxing and the initial break-in, you may proceed with
use of the Mini-RocketBox™ PLUS+ for the first 400 hours of
operation. Until the 400 hour point has been reached, discard all
materials which have dropped inside the bottom of Mini-
RocketBox™ PLUS+.
PLEASE ADHERE TO THE RECOMMENDED GUIDELINES
TO BREAK-IN YOUR MINI-ROCKETBOX™ PLUS+
After the 400 hours required for proper break-in you may reuse
the material that has been collected in the bottom of the shaker
box only after visual inspection for debris has been made.
Visual inspection should always remain part of the operation of
your Mini-RocketBox™ PLUS+. Although we use food-grade
materials for direct contact surfaces, due to intense vibration and
moving parts, they may still have debris and must always be
inspected.
2
BREAK-IN PROCEDURE