POP UP MI TOWER STAIRS Manual de usuario

ASSEMBLY GUIDE
FOR MI TOWER STAIRS
+44 (0)1244 833 933 info@popupproducts.co.uk popupproducts.co.uk
MI TOWER
STAIRS
MI TOWER STAIRS ASSEMBLY GUIDE EN 1004-2-en (REV.C 01-05-2022)

CONTENTS
CONTENTS
INTRODUCTION
KNOW YOUR MI TOWER STAIRS
KNOW YOUR MI TOWER STAIRS’S COMPONENTS
KNOW YOUR KIT LIST AND SPECIFICATIONS
KNOW YOUR STORAGE AND TRANSPORT PACK
REGISTRATIONS
1
2
3
4-5
6
7
8
BEFORE YOU START
GETTING STARTED
9
10
11
12
13-14
15-17
18
ASSEMBLY GUIDE
FOR MI TOWER STAIRS

Visit PASMA and HSE for further reference.
www.popupproducts.co.uk/videos/mitower
Page 2
INTRODUCTION
MI TOWER STAIRS is a versatile and high quality mobile access tower providing a work platform for one
person. It is designed in accordance with the latest testing and quality standards. MI TOWER STAIRS
complies with
BS EN 1004-1:2020 and WAHR with vertical ladder access and designed for Class 3 loadings. Platform
heights between 2m & 4m internal / external. Tower designation is EN1004-3-2/4-D-H2
Our priority is to help ensure the safe operation of our products, so please pay particular attention to the
safety tips on pages 8 and 9.
We want you to enjoy the safe and responsible use of MI TOWER STAIRS with the minimum of fuss and
this guide is designed to get you up and running as quickly and as safely as possible.
We recommend that you read this guide prior to assembling and using your MI TOWER STAIRS.
This instruction manual shall be available on the location of use of your MI TOWER STAIRS . Your MI
TOWER STAIRS shall only be used in accordance with this assembly guide without modification and
national regulations.
User training courses cannot be a substitute for this assembly guide and should only compliment it. This
product should only be used in accordance to this assembly guide.
Only original Pop Up Products MI TOWER STAIRS components, in undamaged condition as specified in
this assembly guide, shall be used to assemble this access tower.
MI TOWER STAIRS, which has been designed in accordance with EN 1004-1 are not anchor points for fall
arrest equipment and working is only permitted on a platform with complete side protection, including
guardrails and toeboards.
Scan this QR code to view the video of MI TOWER in operation

KNOW YOUR Mi T OWER STAIRS
Page 3
1
2
3
4
4 RUNG FRAME
TOE BOARD SET
2 RUNG FRAME
EASY-LOCK STABILISER
PARTS LISTING
5
6
7
8
GUARDRAIL BRACE PANEL

KNOW YOUR MI TOWER STAIIRS COMPONENTS
1 GUARDRAIL BRACE PANEL
jaw which is released by simply moving the jaw’s trigger. The claw must only be
attached to the frame with the opening facing outward. Attachment with the
jaw’s opening facing inward will not fully protect the user if lent upon and may
cause serious injury or death. Always ensure that each claw is positively locked in
position before using your tower.
2 FRAME CLIPS
The frame clip’s pin locates into a retaining hole in the frames to lock tower
sections together when placed one on top of the other. The pin is locked in place
by a red tab to ensure that it remains in place. From the disengaged position,
pivot the pin / tab to bring the pin horizontal. Insert the pin fully through the
3 STABILISER COUPLER CLAMP
tube and set the buckle on to the hook, then close the clamp arm to lock the
The coupler clamps are used to secure the stabilisers to the tower’s vertical
4 WIND-LOCK CATCH
Disengaged Engaged
Component
Hanger
Retract
Extend
The wind lock catches comprise of a set of auto-engaging hooks at one end
of the platform and a single gravity type catch at the other. The purpose of
these devices is to prevent up-lift of the platforms in windy conditions. To
engage the auto wind lock (AWL) simply tilt the platform at the angle shown
before placing the hooks onto the rung of the end frame. Lower the
opposite end of the platform onto the opposite end frame rung and the
gravity type lock will automatically engage. Simply lift and hold the gravity
lock before tilting the platform to dis-engage the opposite AWL hooks when
removing the platform on tower disassembly.
5 PLATFORM WITH BUILT IN COMPONENT HANGERS
Friction
Clip
To enable one man to erect MI TOWER products, each hatch is fitted with
four component hangers which are stowed (two either side) within the
platform’s frame. The hangers can be extended when needed and retracted
when not.
To extend a hanger simply pull up the friction clip and pull the component
hanger until it stops. To retract the hanger, simply reverse the procedure.
Page4

KNOW YOUR MI TOWER STAIRS COMPONENTS
Page 5
INSPECTION, CARE & MAINTENANCE
Keep all components clean and free from contaminants. If any part becomes contaminated with paint, acid, oils or similar
products the tower must not be used until the effected components have been cleaned and re-inspected.
All components should be stored in a dry location where they will be protected from adverse weather conditions. When
storing or transporting, keep frames upright and platforms flat. do not stack excessively to avoid stress damage.
Please contact Pop Up Products for further details on maintenance and repair of your MI TOWER STAIRS components.
The walk-through gate frame includes a gate/ladder which is
used to access the upper levels of the Mi TOWER STAIRS and
once unlocked and opened, allows access into and through the
base of the MI TOWER STAIRS. To open the gate/ladder remove
the clip and lift the gate/ladder upwards. It can now be swung
inwards or outwards to allow access.
The vertical tubes also feature positioning rings that will be
used when building the Mi TOWER STAIRS and allow the
guardrail brace panel hooks to be correctly positioned.
A set of conjoined frames can be created by disengaging the
frame clips on one four rung frame and fitting it to a second
four rung frame. Engage and apply the Easy-Clip frame clips to
lock the two frames together.
7 ADJUSTABLE LEG
8 WALK-THROUGH GATE FRAME
9 CONJOINED FRAMES
The adjustable leg allows for accurate positioning of your
MI TOWER STAIRS in relation to your workplace. The leg can be
extended or retracted to allow for leveling and the brake must
be applied to prevent movement.
Upper
Positioning Ring
Lower
Positioning Ring
Gate / Ladder
Section
Gate
Locking Pin
Retract
Extend
Engagement Spring
Adjustment
Collar
Rubber Foot

KNOW YOUR KIT LIST AND SPECIFICATIONS
Page 6
4 RUNG FRAME
EASY-LOCK STABILISER
HATCH PLATFORM
GUARDRAIL BRACE PANEL
220MM ADJUSTABLE LEG C/W RUBBER FOOT
WALK-THROUGH GATE FRAME
2 RUNG FRAME
TOE BOARD SET
MI STAIRS WEIGHT (KG)
PLATFORM SAFE WORKING LOAD (KG)
COMPONENT DESCRIPTION
3.55
3.65
9.35
3.25
0.91
9.29
2.01
5.15
Weight (Unit)
kg
3
4
1
4
4
1
1
1
67.69
150kg
2.2m
qty
2
4
1
4
4
2
1
1
73.43
150kg
2.7m
qty
7
4
2
7
4
1
1
1
100.99
150kg
4.2m
qty
COMPONENT MATRIX AND WEIGHTS
6
4
2
7
4
2
1
1
106.73
150kg
4.7m
qty
See page 11 (Tying in) for Mi TOWER STAIRS heights outside the scope of this instruction guide or
instances where the standard stabilisers cannot be deployed as instructed.
MAXIMUM LEG LOAD 108kg111 kg 125kg128kg
ARTICLE
CODE
MTEF4R
MTTOR
MTPT
MTHU
324523
301205
301211
MTTS

KNOW YOUR STORAGE AND TRANSPOR T PACK
Page 7
TRANSPORT AND S TORAGE
For ease of storage and of transportation, Mi
TOWER STAIRS has been designed so that all
components can be safely stored within the Mi
TOWER STAIRS trolley assembly. See illustration.
Product shown is Mi TOWER STAIRS 2.7m
TROLLE Y COMPONENT S
1
2
3
4
5
GUARDRAIL BRACE PANEL X2
4 RUNG FRAME X2
TOE BOARD SET
ADJUSTABLE LEG AND CASTOR X4

REGISTRATIONS
Page 8

SAFETY DOS AND DON’TS - ALWAYS
Page 8
ALWAYS Read and understand this guide before you begin assembly.
Ensure that all safety requirements are met and that MI TOWER STAIRS is the correct access
solution for the task you wish to perform.
Ensure that MI TOWER STAIRS is assembled and dismantled by a qualified, competent person.
Cordon off the work area creating a zone with a radius that is 1m greater than the total height of
MI TOWER+.
Wear the correct Personal Protective Equipment for the task being performed. Gloves, steel
toecap boots, a hard hat and suitable clothing must be worn by all persons.
Tie back long hair and remove items of loose jewellery.
Perform a full risk assessment prior to assembling or using MI TOWER STAIRS and abide by your
findings.
Prevent access to unauthorised persons if you have no ohter option but to leave MI TOWER
STAIRS unattended and if this is not possible then MI TOWER STAIRS must be dismantled.
Make tools and materials required for the assembly of your MI TOWER STAIRS are made
available on site.
Ensure you properly assess the risk/method if tools or materials are hoisted to the platform via a
rope.
Access platforms from within MI TOWER STAIRS and via the 4 rung frames positioned at the
platform’s trap door end. Keep your feet in the middle of the rungs and grip the upper rungs
with your hands.
Erect MI TOWER STAIRS on smooth level ground that is capable of supporting its own weight, the
user and any tools or materials without subsidence and free of obstructions.
Use your MI TOWER STAIRS in accordance with the instructions contained within this assembly
guide.
Use your MI TOWER STAIRS in accordance with National Regulations.
Remove persons and loose materials from your MI TOWER STAIRS before attempting to move it.
ALWAYS
ALWAYS
ALWAYS
ALWAYS
ALWAYS
ALWAYS
ALWAYS
ALWAYS
ALWAYS
ALWAYS
ALWAYS
ALWAYS
ALWAYS
ALWAYS
Otros manuales para MI TOWER STAIRS
1
Tabla de contenidos
Otros manuales de Escalera de POP UP




















