Oxgard K-17 Manual de usuario

VOZROZHDENIE LLC
OKPD 27.90.40.190
ТУ 27.90.40-001-33120038-2018
APPROVED BY
ВЗР.2499-00.00.000LU
GATE
MODELK-17
ВЗР.2499-00.00.000IM
INSTALLATION MANUAL
27 sheets
2020

ВЗР.2499-00.00.000IM
Gate K-17
Installation Manual
2
CONTENTS
1General Provisions ......................................................................................................................... 4
2Safety precautions.......................................................................................................................... 5
3Preparing the product for installation ........................................................................................... 6
3.1 Procedure for transporting the product to the installation site ................................................. 6
3.2 Rules for unpacking the product............................................................................................. 6
3.3 Rules for visual inspection of the product ............................................................................... 6
3.4 Product installation site requirements..................................................................................... 7
4Product installation and dismantling............................................................................................. 8
4.1 Equipment required................................................................................................................ 8
4.2 Product installation................................................................................................................. 8
4.3 Product dismantling.............................................................................................................. 10
5Gate connection and setting........................................................................................................ 11
5.1 Gate connection diagram ..................................................................................................... 11
5.2 Setting of gate operations modes......................................................................................... 12
5.3 Power connection................................................................................................................. 15
5.4 Control panel connection...................................................................................................... 16
5.5 Access control and management system connection (optional)............................................ 16
5.6 Control panel connection to the ACS controller .................................................................... 19
6Comprehensive inspection .......................................................................................................... 22
6.1 Visual inspection and verification of the product readiness for use....................................... 22
7Acceptance of the installed product............................................................................................ 23

ВЗР.2499-00.00.000IM
Gate K-17
Installation Manual
3
This Installation Manual (IM) applies to Oxgard gate K-17 and its
modifications (hereinafter referred to as the product).
IM defines rules and a procedure for installation and commissioning of the
product.
Before installing the product, please read the Operation Manual ВЗР.2499-
00.00.000 (OM) as well.
Due to constant work on improving the product, changes to its design may
be made, which are not represented in this IM revision.
The following abbreviations are used in this document:
OM —Operation Manual;
IM —Installation Manual;
PSU - power supply unit;

ВЗР.2499-00.00.000IM
Gate K-17
Installation Manual
4
1 GENERAL PROVISIONS
For general safety when assembling and installing the product, take into
account all the recommendations and instructions contained herein.
Before starting installation work, completely de-energize the product.
DO NOT:
INSTALL THE POWER SUPPLY MODULE INSIDE THE PRODUCT BODY
AS IT MAY RESULT IN ELECTRIC SHOCK TO PERSONS.
INSTALL PRODUCT NOT IN DRY AND HEATED ROOMS, EXCEPT FOR
MODIFICATIONS WITH INDEX A.
APPLY PASTES AND LIQUIDS CHEMICALLY AGGRESSIVE TO
MATERIALS OF THE HOUSING WHEN CLEANING THE PRODUCT.

ВЗР.2499-00.00.000IM
Gate K-17
Installation Manual
5
2 SAFETY PRECAUTIONS
Installation should be carried out with observance of "Regulations for
Operation of Consumer Electrical Installations" and "Safety regulations for
Operation of Consumer Electrical Installations".
The product shall only be installed by qualified personnel trained in
handling of electrical devices and instructed on safety precautions when handling
the electrical installations with voltages of up to 1000V.
ATTENTION: FAILURE TO COMPLY WITH THE SAFETY
REQUIREMENTS SPECIFIED IN THIS SECTION CAN RESULT IN DEATH AND
DAMAGE TO HEALTH, COMPLETE OR PARTIAL LOSS OF PERFORMANCE
OF THE PRODUCT AND/OR AUXILIARY EQUIPMENT.
ATTENTION: MANUFACTURER WAIVES ANY RESPONSIBILITY
FOR DEATH AND DAMAGE TO HEALTH, COMPLETE OR PARTIAL LOSS OF
PERFORMANCE OF THE PRODUCT AND/OR AUXILIARY EQUIPMENT IF
USER FAILS TO COMPLY WITH THE SAFETY REQUIREMENTS SPECIFIED
IN THIS SECTION, AND ALSO VOIDS THE PRODUCT WARRANTY.

ВЗР.2499-00.00.000IM
Gate K-17
Installation Manual
6
3 PREPARING THE PRODUCT FOR INSTALLATION
3.1 Procedure for transporting the product to the installation site
The product in the original package can be transported without range
limitation by air, closed road and rail transport provided it is protected against
direct exposure to precipitation and dust.
In order to avoid condensation of moisture after transportation at subzero
temperatures, the product shall be held in a room with normal climatic conditions
for 12 hours.
Loading and unloading operations should be carried out in compliance with
safety regulations.
3.2 Rules for unpacking the product
3.2.1 Perform visual inspection of the packaging. There shall not be
visible damage on the package.
3.2.2 Open the transportation box, unpack and check completeness of
the product:
3.3 Rules for visual inspection of the product
3.3.1 Check completeness of the product.
Completeness shall be checked according to the Logbook ВЗР.2499-
00.00.000 (LB).
3.3.2 Visually inspect the product. There shall not be visible damage
on the product.

ВЗР.2499-00.00.000IM
Gate K-17
Installation Manual
7
3.3.3 If any damage is found, prepare a Claim Report.
3.3.4 Figure 1 –overall product dimensions
Figure 1 –overall product dimensions
3.4 Product installation site requirements
ATTENTION: TO AVOID SWING AND/OR OVERTURN DURING
OPERATION, INSTALL THE PRODUCT SECURELY. IN CASE OF PRODUCT
INSTALLATION ON LOW STRENGTH FLOOR, TAKE MEASURES FOR
INSTALLATION SITE FLOOR STRENGTHENING.

ВЗР.2499-00.00.000IM
Gate K-17
Installation Manual
8
4 PRODUCT INSTALLATION AND DISMANTLING
4.1 Equipment required
Equipment required for the product installation:
1) electric perforating machine
2) 16 mm carbide drill bit for drilling anchor holes in the floor (we recommend SORMAT
PFGES10 М10-60 anchor);
3) S6 hollow head screw hex wrench;
4) cross-point screwdriver;
5) plumb or level;
6) steel shims for product leveling;
4.2 Product installation
ATTENTION: THOROUGHLY READ THIS SECTION OF THE MANUAL
BEFORE INSTALLING THE PRODUCT
ATTENTION: IT IS RECOMMENDED TO MARK OUT LOCATING
HOLES AGAINST HOLES IN GATE POST BASE FLANGE WITH MOUNTED
FLAP.
4.2.1 Prepare a level ground at the product installation site.
4.2.2 Prepare cable trench or duct from site to the BP and control
buttons installation site.
4.2.3 Attach gate flap to post using set screws. Make sure that gate flap is
securely attached to post.
4.2.4 Figure 2 –mark out and drill 3 holes of 16mm in diameter in the floor
for the gate post anchors.

ВЗР.2499-00.00.000IM
Gate K-17
Installation Manual
9
Figure 2 –Installation site mounting dimensions
The depth of holes for embedded parts shall exceed the anchor length by 5mm.
Insert anchors into the holes.
4.2.5 Lay PSU and control buttons cables into the cable duct or trench.
4.2.6 Install the gate post to the prepared site.
4.2.7 Align the gate post holes with the floor anchors.
4.2.8 Check that installed gate is vertical in 2 planes, use steel shims of
required thickness for the correct gate installation, where necessary.
4.2.9 Fasten gate base flange with three screws M10 by screwing these into
the proper anchors using the S6 wrench.

ВЗР.2499-00.00.000IM
Gate K-17
Installation Manual
10
4.2.10 Lead cables from PSU, ACS and control panel into the product
housing. Secure the cables with cable ties.
4.3 Product dismantling
4.3.1 When sending the product for calibration or repair, dismantle
product as follows:
1) turn product power off;
2) disconnect the product from the power supply source;
3) disconnect the product cable part from auxiliary cables;
4) remove the product from the installation site.
4.3.2 Before packing, clean the product from dust and dirt.
4.3.3 Put the product in a packing box.
Este manual sirve para los siguientes modelos
1
Tabla de contenidos
Otros manuales de Cercas y portones de Oxgard





















