
Organise poles and connectors into their colours and groups.
Unzip and lay out tent.
Locate floor section and lay flat with edge sections vertical.
Assemble floor poles and 3-way corners and 4-way Joins as shown.
Ensure Velcro flap is in front right corner.
Step 1
Step 2
Step 3
Step 4
Insert lower wall poles (chamfered end) into 3-way corners and 4-way Join.
Insert upper wall poles (shrunk end) into lower poles.
Fit 3-way corners and 4-way joins on top.
Velcro Flap
4-Way Join
3-Way Corner
4-Way Join
3-Way Corner
Fit support poles.
Fit roof ensuring Velcro
flap is in front right corner.
Velcro Flap
Support Pole
Rubber Ends
ring
Straight Pole
Connectors
Centre
Securing Ring
Insert ceiling poles into 3-way corners and 4-Way joins.
Fit centre securing ring over pole before fitting to 4-way join.
Fit centre ceiling poles into straight pole connectors.