Maktek 20 MK Manual

20-25-35 MK
Installation
Operation and Maintenance Instruction
-ECONOMIC
-FULL AUTOMATIC
-ELECTROCNIC IGNITION
-FULL SAFE
-WIDES READ SERVICE NETWORK

MAKTEK Boiler has a high efficiency construction and provides economy by burning fuel fully.
The burner used in MAKTEK Boiler, is a high-quality burner ith superior technology. It provides
high efficiency combustion, hich provides the fuel air mixture at optimum concentration.
GENERAL WARNINGS AND RECOMMENDATIONS
The points to be follo ed by the user during oprating and maintenance are explained in this
manual.
The follo ing suggestions and arnings must be cared in terms of safety and efficiency of the
system.
OINTS TO BE CONSIDER BY USERS
1- Receive your boiler in operative condition together ith your installer system
2- Put your boiler in places here the plumber is suggests.
3- The boiler capacity is in 20.000 Kcal heating po er, and heating more or less is linked to the
amount of radiator to be selected. In this regard, consider the suggestions of your plumber.
4- Prepare the chimney, chimney connection, ater, fuel and electricity connection hen the
central heating system is installed. Take care that the chimney connection is at the shortest
distance.
5- In the summer months hen the boiler is not used, run the boiler at least once a month for 1-2
minutes. This ill remove the chance of the circulation pump becoming trapped in the inter.
A. O ERATION OF THE BOILER
1-Check hydrometer to see if the expansion is filled ith ater. Do this check at any time during
the orking period.
2- Check the fuel tank if it is full ith diesel fuel. Do not use the fuel in the tank until if finishes for
fuel line not to make air.
3- Set your thermostat at the desired temperature (for ex. 50°- 60°-80°)
4- Check that the valve on the fuel line or at the fuel tank outlet if it is open.
5- Run your device by pressing the main control button (on the fron conrol panel )to ON position.
2

USE OF ROGRAM CLOCK
If the device has a program clock for programming,
a) Set the clock by turning it manually in the direction of the arro on the atch dial.
b) There are small program bars around the dial that correspond to 15 minutes periaods each.
When you ant boiler to run, the boiler ill automatically starts after pulling the bars that are
across the preffered time period.
After adjusting the temperature to the desired temperature, press the main control button to
make the device run.
INSTRUCTIONS FOR USE AND O ERATION OF BOILER WITH HOT WATER
1-In summer use, the boiler must only be operated for hot ater. Selector s itch position
on the electric panel must be placed at mode.
2- MAKTEK Cenrtal Heating Boiler ith Hot Water automatically starts to produce hot ater.
Shortly after the boiler starts running , hot ater is given by opening any hot ater tap.
3- In the summer months, the boiler orks only for hot ater. Thermostat should be set to sho
the boiler thermometer 80°.
MAINTENANCE OF THE DEVICE
The burner in the MAKTEK Central Heating Boiler has a feature that can be easily removed and
installed and the maintenance can be practically done.
1- The burner can be easily removed by loosening the t o imbus scre s on the aluminum flange.
The electrical connection of the burner can be removed by removing the socket on the burner and
removing it from the device.
3

2- It is enough to remove the burner barrel to reach the part of the burner taht containes the
turbulator, the injector and the electrodes.
3- Dismantling of burner electrodes, injectors and turbulators:
First, the cable headers ith socket are removed from the double electrode.Then the scre
holding the turbulator is loosened and turbulator demounted from its place. The electrode holder
scre is demounted and electrode is removed from its place. The injector can be removed by
means of a key. The replacement of these elements is carried out by reversing the same order.
4

1- Ignition Transformer
2- Photocell
3- Condenser
4- Burner Engine
5- Fuel Pump
6- Solenoid
7- Brain
* The device is secured by pressure prosestat. Device ill not enter the circuit unless sufficiant
close- circuit pressure is provided.
B. GENERAL USAGE RULES
1- S itch off your device hen you are filling the depot ith diesel and ait for 1 hour ithout
orking.
2- Before restarting the unit, drain the sediment and ater that accumulate on the bottom of the
boiler by opening draining valve.
3- Clean the diesel filters at the outlet of the tank every 30 days. After the filter is cleaned, drain
the air of the circuit.
4- Clean the electrodes and the turbulator of the burner every 6 days ith a dry cloth.
5- Clean it ith a photocell every 60 days.
6- At the beginning of each inter season, clean the soot has accumulated in the boiler.
7- Clean the burner nozzle every 4 months.
Note: It is recommended that the maintenance procedures specified in items 4, 5, 6 and 7 are
carried out by your authorized service.
5

BURNER DIESEL FILTER CLEANING
1-Stop running of device.
2- Close the outlet valve in the diesel reservoir.
3- Remove the strainer ire in the filter and ash thoroughly ith clean diesel and replace.
4- Scre the filter cover in its place.
5- Open the tank outlet valve.
6- Loosen the bleed plug of the pump and allo burner to run. When the diesel comes out of the
tap, tighten again.
7- Dry the filter ith a cloth and check for leaks.
HOTOCELL CLEANING
1- Stop running of device.
2- Remove photocell by pulling it to the back side.
3- Clean the glass part of the photo-cell ith a clean, dry cloth and replace it.
SOOT CLEANING
1- Stop running of device and unplug it.
2- Unscre the four scre s of cleaning cap and remove the cap. (Be careful not to spoil the
amyant icks. If they are spoiled change them.)
3- Remove the directors inside the smoke pipes so that the soot can pour into lo er chamber.
4- Remove the burner from its place.
5- Clean all the soot in boiler ith a vacuum cleaner.
6- Put the burner in its place and run the boiler.
6

CLEANING OF ELECTRODE AND TURBULATOR
1- Stop your device and remove it from the plug socket. Wait for 10 minutes to cool do n.
2- Remove the burner from the boiler by loosening the burner scre and pulling the burner
to ard you.
3- Remove the cover scre s to remove the cover hich has barrel on it.
4- Clean the electrode porcelains and electrode tips ith a dry cloth.
5- Wipe and clean the turbulator. Make sure that the turbulator blades are clean.
6- Make sure that the electrode adjustment is not disrupted. If the setting is corrupted at the time
of cleaning, make the adjust as sho n in picture 'D'.
7- Insert the cover that has barrel and place the burner in it.
BURNER INJECTOR CLEANING
In addition to electrode cleanup operations:
1- Loosen the turbulator fixing scre and remove the turbulator and electrodes.
2- Remove burner injector and and the filter on injector and ash ith clean diesel.
(Do not insert hard objects into the injector nozzle.) Replace the filter and the injector.
3- Replace the turbulator and check the settings and install the retaining scre .
4- Replace the combustion tube and place the burner in the boiler.
7

CIRCULATOR S EED ADJUSTMENT
This operation ill be carried out by the assembly technician at the first run.
C. REQUIREMENTS MUST BE DONE IN FAILURES
Fault: The red lamp on the Start button is not shine.
Reason: 1- Electric po er is off.
2- The fuse might have been thro n out. Check it out.
3- The bulb in the button is lit, replace ne one.
Fault: The lamp on the Start button is shining but the device is not running.
Reason: 1- The adjustment thermostat is set lo .
2- Electrical iring cables have incompatibility, call for service.
Fault: The fault lamp of the device is on and not working.
Press the reset button three times for five minutes. If the device does not ork again, proceed as
follo s.
Reason: 1- Diesel's over. Check it out.
2- The voltage is lo .(At least 200 V) Check it out. If necessary, place a regulator.
3- Photocell lamp is dirty. Clean.
4- The nozzle is blocked. Clean.
Fault: The device is intermittently on and breaks down.
Reason: 1- The burner pump filter is dirty. Clean.
2- The tank outlet filter is dirty. Clean up and get the air.
3- The diesel is about to finish. Check it out.
Fault: High-pitched, metallic and intermittent chirping noise comer from the burner pump.
Reason: 1- The burner pump filter is blocked. Clean up and get the air.
2- Tank filter is blocked. Clean up and get the air.
8

Fault: The boiler is operating normally, but the radiators are not warming up.
Reason: 1- The circulation pump may not ork. Check that the pump tightness by rotating the
scre driver head on the pump shaft.
2- Air as collected in the radiators. Take the air from the radiators.
If your device does not work when the above procedures are performed, we recommend you to
contact with an authorized service.
D. WARRANTY CONDITIONS
In order for the boiler to ork ell and efficiently for many years:
* YOU MUST MAKE ERIODIC MAINTENANCE EVERY YEAR FOR VALIDATION OF 3 YEARS
WARRANTY.
In order for your arranty terms to continue for the first three years, you are required to make
periodic maintenance every year. You should keep your annual periodic maintenance coupons
hich are signed, stamped by autorized srevices after care.
DO NOT AY THE FEES WITHOUT SEEINGTHE CURRENT RICE LIST IN YOUR SERVICE.
E. FUEL TY E
Use diesel as fuel. Be careful that the diesel is free from foreign substances such as ater, oil,
sediment.
MAKTEK CAN NOT BE HELD RESPONSIBLE FOR ANY DAMAGES CAUSED FROM USING DIESEL WITH
ADDITIVES.
OINTS TO BE CONSIDERED BY INSTALLATOR FIRM
TECHNICAL INFORMATION AND INSTALLATION INSTRUCTIONS
1- Technic Information
-Draught need: Chimney draught need must be minimum -2mm ss.
-Combustion chamber pressure: Must be -3mm ss
-Chimney gas outlet temperature: Must be maximum 200°
-Mass of chimney gas: 20m³/h (-10)(+10) according to chimney draught
- Chimney outletconnection diameter : 130 mmØ
-Water side resistance:10 m bar
-Maximum heat po er: 20.000Kcal/h
-Relativistic boiler loss: Maximum 12%
-Boiler gaz volume: 20 liters.
-Temperature control space: Δt:6°C
-Combustion room dimensions and volume:23x34=15lt
9

BURNER DATA
-Brain: Type G22 220V 18VA
-Transformer: Primer 220V 55VA, secondary 2x10 KVA 30m A
-Engine: 220V 75W 0.6A 2800 D/D
-Injector: 20MK için:0.50 G/h 60°- 80°
-Circulation pump: 20MK 15/5 (10-19-32 W)
2- DATA ABOUT CHIMNEY
Before installing the MAKTEK central heating boiler you need to check hether the boiler is
suitable and sufficient.
a) Chimneys should be made plastered in the sections mentioned in the project of the radiator
installation so as not to receive air from the outside.
b) There should be a fresh air inlet at the ground level and at least 50% of the chimney section in
order to enter the clean air required for combustion in the boiler room. Also, in order to dispose of
the dirty air that can be collected in this area, it is necessary to find open air gap at the ceiling that
ould have the 25% of the cross section of the smoke pipe.
c) A heating system other than its o n heat generator, stove, oven, drying cabinet, ater heater
and other foreign facilities of a can not be connected to the central heating chimney.
d) A leakproof cleaning cap at a suitable size to chimney section must be provided at the lo est
point of the chimneys.
e) Horizontal smoke pipes shall be connected to the chimney ith a slope rising at least 5% and
shall not exceed 1/4 of the height of the chimney height at any time.
f) There must be a hat on the boiler to protect it from rain or sno .
Chimney Section Calculation
F= Free section of chimney cm²
0,03= coefficient
Qk= Boiler Capacity, kcal/h
h= Vertical height of the chimney, m.
10
Este manual sirve para los siguientes modelos
2
Tabla de contenidos
Otros manuales de Caldera de Maktek

Maktek
Maktek 25 MKB-S Guía de inicio rápido

Maktek
Maktek Epsilon LCD Manual de usuario

Maktek
Maktek OMEGA Manual

Maktek
Maktek Omega 6 Manual de usuario

Maktek
Maktek Epsilon ECO 24 Manual de usuario

Maktek
Maktek 25 MKP Guía

Maktek
Maktek MKK Series Guía de inicio rápido

Maktek
Maktek Condense Manual de usuario

Maktek
Maktek 25 MKK-S Guía de inicio rápido

















