Required material
● Powerline voltage (100 to 250VAC) to 12-24V DC +/-10%, 2A Max. Power supply
● Cable between the power supply and the Hub: 2 wires (red, black), 22 AWG,
minimum section: 0.35 mm²
● Flat screwdriver
● Cutting pliers
● Wire stripper
Optional hardware depending on the type of connection
● Bus connection cable: 2 wires, 24 AWG, minimum section: 0.22 mm² + braid
● Ethernet cables
● Ethernet switch
● Echelon U60 FT DIN USB Gateway (for LON FT10)
● High-gain GSM antenna
● High-gain LoRa antenna
● GSM or LoRa antenna cable
● Double-sided high performance adhesive tape
● Technical documentation of equipment
● Technical documentation of IoT sensors
● Schematic of the communication network(s) of the BMS
Hub configuration software
Each customer receives an email titled "Your Hub Is Coming" outlining the instructions for
installing the Desktop Application and configuring the Hub.
Step 1 - Download the Java SDK
Step 2 - Install the Desktop application
Step 3 - Run the Desktop Application
Read the Hub Desktop Application guide for more information.