INSTALLATION
These guidelines should be followed to install the Hydrochlor®:
a. Ensure that the chlorinator cell is the last piece of
equipment installed on the ltration system – this
is so the chlorine produced will not damage other
equipments such as heaters.
b. The cell may be installed above or below water
level. If it is below water level, please ensure that
an isolation valve is installed so the unit can be
serviced without losing water from the pool.
c. The cell may be mounted on different angles so
long as a gas trap is provided.
GAS TRAP: The cell must be positioned in such a
way as to provide a gas trap. The bottom of the
cell must be above the top surface of the pipe
from the previous piece of equipment, as per the
below diagram.
Installing the Power Pack
Choose a location for the Hydrochlor® Power Pack close enough to the Cell/Housing and ltration
pump so that both may be connected/disconnected easily. The Hydrochlor® Power Pack should
not be mounted in areas where chemicals are stored (e.g. acid and chlorine). Also ensure that the
Hydrochlor® Power Pack can be connected to the mains power outlet of the pool area.
Note that this outlet must meet the current applicable local standards at the time of installation.
Installing/Connecting the Hydrochlor® Self Cleaning Cell
The Cell/Housing assembly should be plumbed into the pool return line after all other accessories
(and prior to any heating take-offs). Note any water ow direction on the Cell/Housing. The Cell will
need to be removed from the Housing periodically for cleaning – do not place it where its removal
can be difcult/obstructed.
The Cell Cable is connected to the Cell Connector under the Hydrochlor® Power Pack cover.
Ensure that the 3 connections (2 for Cell Power and 1 for Gas Sensing) are
not loose. A loose connection is likely to cause arcing which may damage
the entire system.
NOTE: Connect all plumbing to the Hydrochlor taking care that all joints are
glued or tightened securely to prevent leaking.
Allow 24 hours for glue (solvent) to set before starting the Hydrochlor.
GAS TRAP
40/50mm glued
connections
Sell Clean Requires
Minimum Maintenance