Turner OCTO Manual de usuario

Turner OCTO® Assembly Guide
T: +44 (0) 141 309 5555 F: +44 (0) 141 309 5436 www.turner-octo.com Section 1 Page 1 TA3/01/50/01_Iss1Rev3
Rev.No.Jan17/Rev3
Assembly Guide
©Turner Access Ltd
65 Craigton Road, Glasgow, G51 3EQ, Scotland
SECTION 1.

Turner OCTO® Assembly Guide
©Turner Access Ltd 65 Craigton Road, Glasgow, G51 3EQ, Scotland Section 1 Page 2 TA3/01/50/01_Iss1Rev3
Rev.No.Jan17/Rev3
CONTENTS
1.1 Introduction............................................................................................................4
1.2 Pre-use Inspection & Selection............................................................................5
1.3 Components...........................................................................................................6
1.3.1 Basic Components....................................................................................6
1.3.2 Component Fixing Hints............................................................................7
1.3.3 Access Methods........................................................................................9
1.4 SafetyInformation................................................................................................11
1.4.1 General Safety Notes...............................................................................11
1.4.2 GuardAid®................................................................................................12
(i) User Instructions.................................................................................12
(ii) Wall Scaffold Assembly Procedure using GuardAid®.........................15
1.4.3 FallArrest.................................................................................................23
1.5 Assembly Procedures for Turner OCTO®System Scaffolds...........................24
1.5.1 Tied Wall Scaffold....................................................................................25
(i) Fully Boarded......................................................................................25
(ii) Top Lift...............................................................................................29
(iii) Corner Returns..................................................................................30
1.5.2 Independent Towers................................................................................34
(i) Fully Boarded......................................................................................34
(ii) Top Lift...............................................................................................35
(iii) Mobile................................................................................................36
(iv) Inspection & Maintenance Guidance Notes for Mobile Structures....37
1.5.3 Birdcages.................................................................................................39
(i) Linked Birdcage...................................................................................40
1.5.4 Freestanding Structures..........................................................................42
SECTION 1. Contents

Turner OCTO® Assembly Guide
T: +44 (0) 141 309 5555 F: +44 (0) 141 309 5436 www.turner-octo.com Section 1 Page 3 TA3/01/50/01_Iss1Rev3
Rev.No.Jan17/Rev3
SECTION 1. Contents
1.5.5 Cantilever Brackets.................................................................................45
(i) Inside Boards.......................................................................................45
(ii) Cantilever Bracket with End Plate......................................................47
(iii) Cantilever Bracket with Cup..............................................................47
1.5.6 Circular Structures...................................................................................49
1.5.7 SuspendedScaffolds...............................................................................51
1.5.8 Pre Scaffold Handover Inspection...........................................................53
1.5.9 Maintenance............................................................................................53
1.5.10 Dismantling Procedure............................................................................54
1.6 Anchoring.............................................................................................................55
1.6.1 Tie Patterns for unclad scaffolds.............................................................55
1.6.2 Tie Loads.................................................................................................56
1.7 Maximum Heights................................................................................................57
1.7.1 Assembly Criteria - Unclad Tied Wall Scaffold Examples.......................58
1.7.2 Maximum Heights Unclad Tied Scaffolds (Foot Tied with Horizontal)....59
1.7.3 Maximum Heights Unclad Tied Scaffolds (Foot Tied with Guardrail)......60
1.7.4 Maximum Heights Unclad Tied Scaffolds (Non Foot Tied)......................61
1.8 Transport and Storage.........................................................................................62
1.9 References............................................................................................................63

Turner OCTO® Assembly Guide
©Turner Access Ltd 65 Craigton Road, Glasgow, G51 3EQ, Scotland Section 1 Page 4 TA3/01/50/01_Iss1Rev3
Rev.No.Jan17/Rev3
SECTION 1.1 Introduction
1.1 INTRODUCTION
This Assembly Guide contains the necessary information required to correctly assemble
Turner OCTO®System Scaffolds in accordance with appropriate methods of safe assembly.
The provision and utilisation of collective protection equipment and methodology is
recommended where practicable for installers of Turner OCTO®System Scaffolding.
Installers / Dismantlers of Turner OCTO®System Scaffolding must also be competent,
relative to the type of scaffold to be erected, dismantled or altered.
This Assembly Guide provides instruction for foot tied, non-foot tied, and pedestrian
categories (as listed within the Assembly Guide) built from the ground or other suitable
foundation.
Types of Turner OCTO® System standard conguration included within this Assembly Guide
are detailed on the Contents Page and limited to the maximum heights as indicated in
Section 1.7 Maximum Heights (page 57).
This Assembly Guide should be used in conjunction with a suitable Risk Assessment and
Method Statement (by user) relative to the project to be undertaken. It must be noted that
all employers have a responsibility to ensure that work methods (practices) and adequate
facilities / resources (including work equipment) are provided to eliminate or minimise risks,
in accordance with current legislation.
A complete separate safe system of work (Method Statement) is required for all other types
of scaffold.
Sufcient training, combined with necessary experience, must also be considered and be
appropriate to achieve competency to build or dismantle a particular scaffold type in question.
Please ensure you read and fully understand the manual, and follow the content during
scaffold erection and ensure that the scaffold is complete prior to use and / or handover.
This Manual must be made available to the user / installer of the Turner OCTO®Scaffold
System at all times.
Only competent and qualied personnel should undertake assembly, dismantling and
alteration (and organisation, planning and supervision) of basic Turner OCTO®standard
congurations, and consideration should be given to providing additional (minimum) training
beforehand, if required.

Turner OCTO® Assembly Guide
T: +44 (0) 141 309 5555 F: +44 (0) 141 309 5436 www.turner-octo.com Section 1 Page 5 TA3/01/50/01_Iss1Rev3
Rev.No.Jan17/Rev3
SECTION 1.2 Pre-use Inspection & Selection
1.2 PRE-USE INSPECTION & SELECTION
To ensure that a scaffold is assembled in a manner that prevents its component parts from
being accidentally displaced at any time, it is important that the following checks are carried
out:
• Ensure that all necessary components and safety equipment are available and
operational.
• Each component should be visually inspected prior to use and should be free from
defects.
• Steel components should be straight with no sign of corrosion, cracks or splits that
would impair strength or safety.
• Deck locks should be in good working order; hooks should be free of cracks and
corrosion, and bolts should be tight and locking nuts tted.
• Stiles or Ply inserts should not be punctured or worn to a degree that would impair
strength or safety.
Damaged or incorrect components must not be used.
Pre-use inspection should ONLY be carried out by a competent person.

Turner OCTO® Assembly Guide
©Turner Access Ltd 65 Craigton Road, Glasgow, G51 3EQ, Scotland Section 1 Page 6 TA3/01/50/01_Iss1Rev3
Rev.No.Jan17/Rev3
SECTION 1.3 Components
1.3 COMPONENTS
Turner OCTO®System components for basic use are described in this section for assembly,
dismantling and alteration of Turner OCTO® System standard congurations. For detailed
component information, refer to the Turner OCTO® Component Identication Guide.
1.3.1 Basic Components
No. Component Details
1. Adjustable Base Jack Enables adjustment up to 500mm
2. Standard Sizes: 4m; 3m; 2m; 1m; 0.5m
3. Bracing Guardrail Sizes: 3.5m; 2.5m; 1.75m; 1.25m; 1m; 0.7m
4. Horizontal Sizes: 3.5m; 2.5m; 1.75m; 1.25m; 1m; 0.7m
5. Deck Sizes: 3.5m; 2.5m; 1.75m; 1.25m; 1m; 0.7m
6. Ladder Access Deck Sizes: 3.5m; 2.5m
7. Alloy Stair Stair access between working platform levels
8. Cantilever Bracket Sizes :1.25m; 1m; 0.7m; 0.45m; 0.30m; 0.1m
1
2
3
4 5
6
8
7
Note The sizes shown are basic sizes, other sizes available. Please ask for details.

Turner OCTO® Assembly Guide
T: +44 (0) 141 309 5555 F: +44 (0) 141 309 5436 www.turner-octo.com Section 1 Page 7 TA3/01/50/01_Iss1Rev3
Rev.No.Jan17/Rev3
1.3.2 Component Fixing Hints
Horizontals
SECTION 1.3 Components
5. Lift Wedge and point
bottom of Wedge towards the
Standard.
....until the top of the Wedge
is level with the top of the
Horizontal.
Note If the Horizontal and Standard
are not level and plumb, the Wedge
may be difcult to drive.
1. Turn the Horizontal upside
down at an angle of approx.
45° and shake.
2. The Wedge and Saddle will
then automatically fall back
into the preset position.
4. Slide the Saddle over to the
Standard.
7. To de-mount Horizontal,
drive Wedge vertically upwards
to loosen.
8. Lift the Wedge clear, slide
Saddle backwards and lift
Horizontal from cup.
Wedge
Saddle
3. Position the Locking Head by
turning the Horizontal approx.
45° and rotate into the cup.
Wedge
6. Drive Wedge down at an
angle of 45º initially towards
the Standard....

Turner OCTO® Assembly Guide
©Turner Access Ltd 65 Craigton Road, Glasgow, G51 3EQ, Scotland Section 1 Page 8 TA3/01/50/01_Iss1Rev3
Rev.No.Jan17/Rev3
SECTION 1.3 Components
4. Drive vertically until level
with the top of the Guardrail.
6. Lift the Wedge clear, rest on
ledge and lift Guardrail from cup.
1. Preset Guardrail by lifting
Wedge and resting it on ledge
within the Guardrail.
Note Saddle will hang loosely leaving
space to t hook into cup.
2. Locate top and bottom
hooks of Guardrail in cups
(0.5m apart). Hint Tap lower hook
with hammer to ensure that it is
properly located in cup.
3. Lift Wedge clear of ledge
within the Guardrail to the
Vertical position and allow to
drop and loosely engage.
Guardrails
Decks
2. Ensuring that Deck ts
correctly in bay to be decked
out and there is no movement
in the Deck, lock in position.
1. Push Deck from below and
through bay, then slide back
along bay until the hooks are in
line with the Horizontal. Place
Deck onto Horizontal.
3. The OCTO®Deck has the
added benet of being locked
permanently by fully engaging
the OCTO®Lock using the
appropriate OCTO®tool.
5. To de-mount Guardrail, drive
Wedge vertically upwards to
loosen.
Wedge
Ledge
Saddle
Cup
Unlocked
OCTO® Lock
Locked

Turner OCTO® Assembly Guide
T: +44 (0) 141 309 5555 F: +44 (0) 141 309 5436 www.turner-octo.com Section 1 Page 9 TA3/01/50/01_Iss1Rev3
Rev.No.Jan17/Rev3
1.3.3 Access Methods
Stairway Access
Prior to the commencement of any scaffolding operations, please refer to Sections 1.4.1
General Safety Notes and 1.5 Assembly Procedures.
• 0.7m External Stairway Access (2.5m bay)
SECTION 1.3 Components
1. Assemble 0.7m wide bay to external face
of facade scaffold. Fit Guardrail Post and
1.75m Bracing Guardrail to allow walk off
from Stair unit when tted.
2. Continue to assemble next lift and t
Stair unit to 2nd lift.
3. Fit Guardrail Post and 1.75m Bracing
Guardrail to allow next lift Stair unit to be
placed.
4. Complete.

Turner OCTO® Assembly Guide
©Turner Access Ltd 65 Craigton Road, Glasgow, G51 3EQ, Scotland Section 1 Page 10 TA3/01/50/01_Iss1Rev3
Rev.No.Jan17/Rev3
SECTION 1.3 Components
• 0.7m External Stairway Access
(3.5m bay)
Ladder Access
• 1.25m External Stairway Access
(2.5m bay)
• Internal Ladder Access with Hatches • External Ladder Access with Hatches
Tabla de contenidos