1. FEATURES
•ProDevice ASM120 degausser
•Power cable
•RJ45 UTP patch cable Cat. 5 (ASM120 Professional)
•Pendrive with manual instructions and software (ASM120 Professional)
2. PACKAGING REMOVAL
The degausser is delivered to the buyer in a dedicated box or a case. The device’s weight
requires at least two people to remove it from the box and subsequent transport to the place
of installation. Carefully remove all packaging materials and verify that the contents are
complete as listed in the product features above. Having removed the packaging materials,
immediately inspect the degausser for any evidence of damage in transport. If the device or
any of its dedicated accessories are damaged, report this to the shipment forwarder and the
manufacturer.
Remove VCI emiter form the drawer.
After removing all packing materials, place the degausser on a hard surface in a designated,
sheltered installation site.
All devices and construction elements should be located at a distance of at least 1 meter
away from the degausser.
Before initial use of the degausser, wait at least 3 hours for the device to equalize the
temperature with the surroundings.
Instruction manual ProDevice ASM120
4
www.pro-device.com