
D
a
5
B2.Install wall plate onto wood stud
b
Ф4mm
70mm+
NOT SUPPLIED
Step 1.
1.Use wall plate as guide ,mark 3 screws location on
wall.
Step2.
1.Use hand drill with 4mm drill bit (Not supplied), drill
hole on marked locations with 70mm+ depth.
Step3
1.Take wood screws and washers from pouch D, put one
each washer on wood screw, insert each through 3
wall plate screw holes and into drilled hole. Use socket
wrench (Not supplied) to tighten top screw first.
Check leveler and tighten the other respectively.
Ensure 3 screw are well tightened.
2.Cover up 3 screws by screw caps and you are done.
Leveler
Step 1.
1.Use wall plate as guide ,mark 3 screws location on
wall.
Step2.
1.Use hand drill with 10mm drill bit (Not supplied), drill
hole on marked locations with 70mm+ depth.
2.Take anchors from screw pouch E, insert anchor
into each hole and hammer it until flush with
wall surface.
Step3
1.Take wood screws and washers from pouch D, put one
each washer on wood screw, insert each through 3
wall plate screw holes and into anchor. Use socket
wrench (Not supplied) to tighten top screw first.Check
leveler and tighten the other respectively. Ensure 3
screw are well tightened.
2.Cover up 3 screws by screw caps and you are done.
Ф10mm
70mm+
a
E
b
D
ab
Leveler
NOT SUPPLIED
B1.Install wall plate onto
masonry or solid concrete
27-2AMC
By Hand
Adjustment
Tightening Direction
loosening Direction
Hex Wrench
Phillips Screwdriver
Pencil
Optional
Warning
Reminder
Ratchet Wrench
Hand Drill
Star Wrench
用手
调整
拧紧方向
拧 方向松
六角扳手
螺丝起子
铅笔
可选
警告
提示
套筒扳手
手电钻
安全扳手
Remove
移开
定点恒力加大
定点恒力减小
+
-
:Torque increased
:Torque reduced
+
-
:Torque increased
:Torque reduced
拧紧方向
拧 方向松
Tightening Direction
loosening Direction
NOTE
定点恒力加大
定点恒力减小
Max Load:13.2-26.4lbs(6-12kg)
4001080502 A1
180°
± °12
0~ 0~7.5"( 191mm)
0~2.4"(0~60mm)
+10°/-12°
0~ 0~18.9"( 480mm)
39.8"(1011mm)max
180°
26.4"(670mm)max
360°
456
9
8
7
Ф16× 1.5mmФ8.2×10-70
3mm 5mm
4mm
C
D E F
M4×15mm
A
4x
B
M5×12mm
B
4x
3x3x each 1x 1x 1x
4x
Ф7×70mm
Ф10× 1.0mmФ4.5×
2x
123
2x
Part List
Fits Most Displays Size:22"~27"
Max Load 13.2~26.4:Ibs (6~12kg)
VESA:75×75,100×100mm
Workstation Wall Mounted
Instruction Manual
Severe personal injury and property damage can result from improper installation or assembly.
Read the following warning carefully before beginning.
● Products must be installed by professional or installer.
● If you do not understand the instructions or have any concerns or questions, please
contact a qualified local installer.
● Do not install or assemble if the product or hardware is damaged or missing, if you
require replacement parts, please contact you local distributor for assistance.
● This product fits most 22"-27" LCD / monitor; maximum weight of LCD / monitor:
12kg / 26.4lbs.
● Installer-friendly and straight forward.
● For safe installation, the desk you are mounting to must support minimum 3 times the
weight of the total load (the mount, the monitor and all accessories weight).
● Do not use this product for other than the original designed.
● This product contain moving parts, please use with caution.
● When installing monitor, please do not damage electrical wiring or power source.
● Installation and routing of monitor cables on the monitor bracket must comply with
electro-technical regulations.
● Importantly, mains- and data-cables must be secured against twisting and squeezing or
shearing.
● The manufacturer will bear no responsibility to the desk of mounting, or incidental
or consequential damages arising thereof.
● The manufacturer disclaims any liability for the modifications, improper installation, or
installation over the specified weight range. The manufacturer will not be liable for any
damages arising out of the use of , or inability to use, the product.
● This product is designed for indoor used only, use of this product outdoor could lead to
product failer and severe personal injury.
▲ This product contains a high pressure gas spring, fire and percussion are prohibited. Also
it is strictly prohibited to dismantle without professionals. Please return to the manufacturer
or hand over to professional agencies if the product is abandoned. In order to ensure
the performance of gas spring, full direction adjustment of the product arm is recommended
several times per month.
A、Full adjustment after installation
Symbols