MWf 1500S+ Manual de usuario

WMF 1500S+
Service manual
KSS Technical Support
Revision: 11/2020
Rev. 05

Preface 2
Preface
This Service Manual contains the most important information that is relevant to typical service and maintenance activities.
If significant changes are made, then this document, along with the referenced attachments and related documents, will be updated and provided to registered
users for download in the service center.
Attachments
WMF 1500S+ Setting instructions milk and foam
WMF 1500S+ Software description part 1
WMF 1500S+ Software description part 2
WMF 1500S+ Initial commissioning workflow
WMF 1500S+ Event and error list
WMF 1500S+ Further detailed information
WMF 1500S+ Maintenance guideline
Applicable documents
Customer documents
Planning information
User Manual
Technician documents
Piping schematics
Electrical schematics
Wiring schematics
Spare parts lists
Technical circulars
These documents are subject to change. Please try to keep these documents up-to-date.
Further detailed information are distributed in paper form as part of the face-to-face training sessions; however, they are not available for download
unrestricted.

Change history 3
Change history
Rev. 01 from 06/2018
1st edition for series launch
Rev. 02 from 07/2018
Addition to the Technician's Intro
Rev. 03 from 04/2019
Addition to the Maintenance concept, special tools
Rev. 04 from 10/2019
Addition to the Maintenance concept Dynamic Milk
Rev 05 from 11.2020
Added: "Link Video Maintenance instruction”

Table of Contents 4
Table of Contents
Preface.............................................................................................................................................................................................................................................................. 2
Change history................................................................................................................................................................................................................................................. 3
Table of Contents............................................................................................................................................................................................................................................ 4
1Installation and commissioning........................................................................................................................................................................................................ 6
1.1 Customers on-site connection requirements....................................................................................................................................................................................................................6
1.2 Hardware connection and preparatory work....................................................................................................................................................................................................................6
1.2.1 General tasks ..............................................................................................................................................................................................................................................................................6
1.2.2 Recommended water filter.....................................................................................................................................................................................................................................................7
1.3 Initial commissioning...............................................................................................................................................................................................................................................................8
1.3.1 Goal of the Technician's Intro...............................................................................................................................................................................................................................................8
1.3.2 Workflow, Technician's Intro .................................................................................................................................................................................................................................................8
2Service................................................................................................................................................................................................................................................ 12
2.1 Pressure reducer setting....................................................................................................................................................................................................................................................... 12
2.2 Grinders.....................................................................................................................................................................................................................................................................................13
2.2.1 Grinder—basic mechanical setting, grinding degree ................................................................................................................................................................................................... 14
2.2.2 Using the electric grinding degree setting for the grinder ....................................................................................................................................................................................... 14
2.2.3 Dynamic Coffee Assist advance settings......................................................................................................................................................................................................................... 15
2.3 Brewing unit with removable brew aperture ................................................................................................................................................................................................................16
2.4 Power supply ...........................................................................................................................................................................................................................................................................17
2.5 Power stage ............................................................................................................................................................................................................................................................................. 18
2.6 Front panel............................................................................................................................................................................................................................................................................... 19

Table of Contents 5
2.6.1 Replacing the front panel.................................................................................................................................................................................................................................................... 21
2.7 Power Class ..............................................................................................................................................................................................................................................................................22
3Maintenance ..................................................................................................................................................................................................................................... 23
3.1 Maintenance concept –Overview of maintenance activities...................................................................................................................................................................................23
3.2 Service / Maintenance 2 - every 2 years......................................................................................................................................................................................................................... 24
3.3 Descaling...................................................................................................................................................................................................................................................................................25
Antifreeze protection/transport preparation............................................................................................................................................................................................ 26
Special tools and aids................................................................................................................................................................................................................................... 27

Installation and commissioning 6
1Installation and commissioning
1.1 Customers on-site connection requirements
Necessary preparatory work for electricity, water and drainage connections at the customer‘s premises are to be arranged by the machine owner/operator.
The work must be carried out by authorised installation technicians in compliance with general, country-specific and local regulations.
The WMF Service engineers may only connect the coffee machine to existing prepared connection points.
WMF Service is neither authorised nor responsible for carrying out any work on-site prior to connection.
For details, see the planning information on the website www.wmf-coffeemachines.com.
Notes
-Electrically conductive counter surfaces must be earthed
-Unplug the mains plug before disconnecting the mains voltage across the cold appliance plug
1.2 Hardware connection and preparatory work
1.2.1 General tasks
Place the coffee machine horizontally on the counter (width and depth); adjust feet where adjustable
Connect the water infeed
Water filter needed? If “Yes” – connect (for details, see the following chapter)
Connect the drain –use angle 33 2165 8000 from horizontal to vertical!

Installation and commissioning 7
Example, Dynamic Milk: all drains must be sloped.
Attach the drain tube and rinse hose to the connection angle using cable ties
Caution
To prevent back-contamination, the hoses MUST NOT make contact with the wastewater.
Two position arrows are inscribed on the elbow connector for reference.
Connect to the power supply
Switch on the coffee machine
1.2.2 Recommended water filter
When the carbonate hardness is above 5 °dKH, a WMF water filter should be installed.
For the WMF 1500S+, –bestmax M –is recommended in the standard in the retail price list.
After measuring the carbonate hardness with a test kit - which is within the sell-by date - cut to size according to the capacity table
(see the User Manual which comes with the filter).

Installation and commissioning 8
1.3 Initial commissioning
1.3.1 Goal of the Technician's Intro
A guided implementation of mandatory basic settings.
As simple a start-up of the coffee machine as possible with a high-quality beverage quality.
The aim is not to cover all setting options.
If for example the settings stored as defaults are changed in the "Operating options" menu or if the position of beverage buttons is changed, cup volumes are to
be changed, this must take place after the intro has concluded.
1.3.2 Workflow, Technician's Intro
Set and adjust the time zone as necessary.
Set automatic summer/winter time.

Installation and commissioning 9
Set and where necessary change the language.
Adjust time and date where necessary.
The prompt appears asking whether to carry out start-up or not.
When Yes: Next step
When No: Machine is filled then heat and is then ready for use

Installation and commissioning 10
Enter the technician PIN.
(Since some access to service menus is provided as part of the technician intro; it is used to ensure that only
technicians use the start-up intro.)
A pure information text page follows.
In this way, the setting steps to be performed are explained in detail.
Tabla de contenidos
Otros manuales de Cafetera de MWf



















