KWE DDR OT/BACIP Guía rápida

Communication
DDR Part Number:
704501
DDR OT/BACIP Gateway
Communication Gateway
for OpenTherm to BACnet IP
Document Applicable to:
DIN Rail Mount 704501
Applicable Controls:
DDR Boiler Controls for MCA Pro /
C230 ECO-A and Gas 310 ECO Series
Technical, Installation and Configuration Information
IMPORTANT
Read and save these instructions for
future reference
Cautionary Statement
The information presented in this document is
only to be used by those familiar with its
application and use.
DDRA 015 001 v1.1 04/2010

DDR OT/BACIP Gateway DDRA 015 v1.1 04/2010
2
About these instructions
Trademark Information
BACnet® is a registered
trademark of the American
Society of Heating,
Refrigerating and Air-
Conditioning Engineers, Inc.,
1791 Tullie Circle NE, Atlanta,
GA 30329.
For more information please
visit:
www.bacnet.org
www.ashrea.org
OpenTherm® is a trademark of
the OpenTherm Association.
For more information, please
visit:
www.opentherm.eu
Caution danger
Risk of injury and damage to equipment.
Attention must be paid to the warnings on
safety of persons and equipment.
Reference
Refer to another manual or other pages in
this instruction manual.
Specific information
Information must be kept in mind to maintain
comfort.
Warning
Before you operate this boiler, read this manual carefully and take extra precautions to all safety
and warning symbols or important items. The operating manual is part of the documentation along
with the boiler. The installer is required to explain your heating system and boiler operating instruc-
tions.
Notice
Please read this manual and retain for future reference. Improper installation, adjustment, altera-
tion, service or maintenance can cause injury, loss of life or property damage. Refer to this manual
for assistance or additional information or consult a qualified installer, service agency or the gas
supplier.

DDR OT/BACIP Gateway
DDRA 015 v1.1 04/2010
3
Important Regulatory and Installation Requirements
Codes
The installation of this unit must
be in accordance with local
codes.
All electrical wiring is to be done
in accordance with the latest
edition of CSA C22,1 Part 1 and/
or local codes. In the U.S. use
the National Electrical Code
ANSI/NFPA 70.
The installing contractor must
comply with the Standard of
Controls and Safety Devices for
Automatically fired Boilers, ANSI/
ASME CSD-1 where required by
the authority having jurisdiction.
Working on the equipment
The installation, adjustment,
service and maintenance of this
unit must be done by a licensed
professional heating contractor
or persons who are qualified and
experienced in the installation,
service, and maintenance of
similar products. There are no
user serviceable parts on this
control.
Power supply
Install power supply in
accordance with the regulation of
the authorities having jurisdiction
or in absence of such
requirements, in accordance with
National Codes.
Please carefully read this manual
prior to attempting installation.
Any warranty is null and void if
these instructions are not
followed.
The completeness and
functionality of field supplied
electrical controls and
components must be verified by
those installing the device
Purpose of Device and Operation
The DDR OT/BACIP Gateway
provides a communication
translation between OT enabled
boilers and BACnet enabled BMS
systems.
The DDR OT/BACIP Gateway may
be either part of a control panel
or stand-alone control device.
Warning
More than one live circuit. See
wiring diagram in this manual.
Turn off power supply to control
and damper/blower before
servicing. Contact with live
electrical components can result
in serious injury or death.

DDR OT/BACIP Gateway DDRA 015 v1.1 04/2010
4
DDR OT/BACIP Gateway505
This page is intentionally left blank

DDR OT/BACIP Gateway
DDRA 015 v1.1 04/2010
Control Installation Section 2
Control Information
Section 2.0
Information Page
What’s In The Box 6
Gateway Assembly Overview 7
Gateway Connection Overview 8
C230 ECO-A Gateway Installation Steps 9
Gas 310 ECO Gateway Installation Steps 11
Gas 310 ECO OT Module Installation Steps 12

DDR OT/BACIP Gateway DDRA 015 v1.1 04/2010
6
Control Installation Section 2
What’s in the box
Unboxing the Control
In the box, you will find the following:
Qty. Description
1 Communication Gateway (on DIN rail)
1 Gateway power supply (on DIN rail)
2 End stops (on DIN rail)
1 OT Interconnection cable
1 Gas C230 wiring harness
1 Gas C310 wiring harness
2 M5x8 Machine screws (DIN Rail)
2 M5 Lock nut (DIN Rail)
2 Power supply interconnection wires
1 DIN Rail (Gateway and Power supply
mounted)
1 Installation manual

DDR OT/BACIP Gateway
DDRA 015 v1.1 04/2010
7
Installation
1
2
3 4
5
Information
1. DIN rail for mounting of gateway and power
supply.
2. Gateway power supply.
3. Communication Gateway.
4. DIN rail locks
5. Power supply connection jumpers
Warning
When extending wire there is the possibility of exposure to
electromagnetic interference. Avoid running wires beside or
near high voltage 120/240 VAC conductors. If proximity to
high voltage conductors cannot be avoided, use stranded,
twisted pair of shield design wire. Ensure that only one end
of the shielding is grounded.

DDR OT/BACIP DDRA 015 v1.1 04/2010
8
DDR OT/BACIP Gateway Overview—24VAC DIN Rail Unit
1
3
Installation (Applicable to Field Retrofit Only)
1. Mounting of the DDR OT/BACIP Gateway
is done by utilizing the supplied DIN rail.
The DIN rail is mounted inside of the
boiler control specific to the application.
Information
1
2
1. BACnet IP RJ45 connection
2. OT connection terminals A and B
3. Power Connections to power supply
Connection Overview
!
"
!
#
"
!
Warning
When extending wire there is the possibility of exposure to
electromagnetic interference. Avoid running wires beside or
near high voltage 120/240 VAC conductors. If proximity to
high voltage conductors cannot be avoided, use stranded,
twisted pair of shield design wire. Ensure that only one end
of the shielding is grounded.

DDR OT/BACIP Gateway
DDRA 015 v1.1 04/2010
9
Installation Overview C230 ECO-A
1
1
2
2
3
Information
With the cover removed from the boiler control
and the power turned off, follow the proceeding
steps.
1. On the rear wall of the boiler control, locate
lower nylon stand-offs. Remove these two
stand-offs by either pressing out towards the
back of the control or cut with side-cutters.
2. With the two stand-offs removed, enlarge the
holes with 3/16” drill bit to allow for the M5
screws which fasten the DIN rail to the control
housing. WATCH FOR METAL SHAVINGS.
3. With the holes enlarged, insert the M5 screws
through the DIN rail out towards the back of
the control and tighten with supplied M5 lock
nut.
Note:
Remove gateway and power supply from DIN
rail. Release the fastening tabs to allow DIN rail
to be separated from housings. The end sections
do not need to be removed from DIN rail.
Caution
Ensure that boiler control power is turned off
before performing any work inside of control.

DDR OT/BACIP Gateway DDRA 015 v1.1 04/2010
10
Installation Overview C230 ECO-A
1
1
2
3
Information
With the DIN rail mounted on the rear wall of the
boiler control, follow the proceeding steps.
1. Mount the gateway and power supply onto the
mounted DIN rail by positioning the bottom DIN
rail hooks at the bottom of the DIN rail. Tilt
both units upwards and ensure upper clip hold
devices to DIN rail.
2. Locate the harness with the 230 label. Insert
black wire into the L terminal of the power
supply. Insert the blue wire into the N terminal
of the power supply. Tighten both terminals of
the power supply.
3. Locate the K1 plug harness from within the
control. Plug in the harness installed in the
previous step to the K1 plug.
4. Wire the OT communications harness into the
green OT plug. Plug can be removed by
unplugging from control. Insert wires and
tighten terminal screws. Not polarity sensitive.
Once all of the connections have been verified, the
power switch of the control can now be turned on
to perform the communication testing of the
gateway. With the BMS plug-in connection to the
gateway complete, it should be possible to start
reading information from the boiler control.
4
3
4
Este manual sirve para los siguientes modelos
1
Otros manuales de Puerta de KWE
Manuales populares de Puerta de otras marcas

LST
LST M500RFE-AS Manual de usuario

Kinnex
Kinnex Media Gateway Manual de usuario

2N Telekomunikace
2N Telekomunikace 2N StarGate Manual de usuario

Mitsubishi Heavy Industries
Mitsubishi Heavy Industries Superlink SC-WBGW256 Manual de usuario

ZyXEL Communications
ZyXEL Communications ZYWALL2 ET 2WE Manual de usuario

Telsey
Telsey CPVA 500 - SIP Manual de usuario












