Safety
Please read and keep in a safe place
Please read through these instructions
carefully before installing or operating. Following the
installation, pass the instructions on to the opera-
tor. This unit must be installed and commissioned
in accordance with the regulations and standards
in force. These instructions can also be found at
www.docuthek.com.
Explanation of symbols
• , , , ... = Action
▷= Instruction
Liability
We will not be held liable for damage resulting from
non-observance of the instructions and non-com-
pliant use.
Safety instructions
Information that is relevant for safety is indicated in
the instructions as follows:
DANGER
Indicates potentially fatal situations.
WARNING
Indicates possible danger to life and limb.
CAUTION
Indicates possible material damage.
All interventions may only be carried out by qualified
gas technicians. Electrical interventions may only be
carried out by qualified electricians.
Conversion, spare parts
All technical changes are prohibited. Only use OEM
spare parts.
Changes to edition 04.7
The following chapters have been changed:
– Technical data
– Certification
Contents
Operating instructions
D
GB
F
NL
I
E
GB-1
449500
Translation from the German
Tightness control TC 40
Tightness control TC 40.................
Contents ..............................
Safety.................................
Checking the usage .....................
Type code .............................2
Part designations ........................2
Type label..............................2
Installation ............................
Wiring ................................
Setting the test instant ..................
Setting the test periodtP................
Values for valve and pipe volume ............3
Commissioning.........................4
Power failure ...........................4
Assistance in the event of malfunction .....4
Maintenance ...........................5
Technical data .........................5
Designed lifetime ........................5
Logistics ..............................6
Certification ...........................6
Contact ...............................6
Safety
Contents

GB-2
D
GB
F
NL
I
E
Checking the usage
TC410 for tightness test before every controlled start-
up or after every controlled shut-down in systems
with 2safety valves. Tightness control TC410 can
be used for individual valves, quick opening or slow
opening with start gas rate. The valves are controlled
directly for testing by the TC410. A pressure switch
for gas must be mounted on the interspace between
the valves to be monitored for the tightness test.
This function is only guaranteed when used within the
specified limits– see page5 (Technical data). Any
other use is considered as non-compliant.
Type code
Code Description
TC Tightness control
4In control cabinet
Testing before or after burner run
0External pressure switch required
TT-product
-
-0
Test period: 10 to 60 s
Test period: 100 to 600 s
K
N
T
Mains voltage: 24 V DC
110/120 V AC, 50/60 Hz
220/240 V AC, 50/60 Hz
Part designations
OK
TEST
1
2
1
2
Upper housing section
Lower housing section
Type label
▷Test period and gas type, mains voltage, power
consumption, ambient temperature, enclosure,
switching current and maximum inlet pressure–
see type label.
D-49018 Osnabrück, Germany
TEST
OK 1 2
CE 0085AP0020
TC 410
Imax 5A
IP40
Installation
CAUTION
Please observe the following to ensure that the TC
is not damaged during installation:
– Avoid condensation.
– Gas type and inlet pressure pu: dependent on
external pressure switch.
▷Any installation position.
▷
The device must not be in contact with masonry.
Minimum clearance 20mm (0.78").
▷
In the case of very large test volumes VP, an
installed relief line should be of nominal size40
to allow for the discharge of the test volume VP.
Disconnect the system from the electrical power
supply.
Shut off the gas supply.
OK
TEST
1
2
1
2
70 (2.76")
21 (0.83")
37,5 (1.48")
ø 5 (ø 0.2")
43 5
66
▷
Snap the lower section onto a 35mm U-shaped
mounting rail or screw on the lower section with
two screws Ø5mm.
OK
TEST
1
2
1
2
70 (2.76")
21 (0.83")
37,5 (1.48"
)
ø 5 (ø 0.2")
43 5
66
7 Mount the pressure switch on the interspace
of the valves to be monitored– see operating
instructions for pressure switch.
pupd
pz
▷On VG 15 – 40/32, the test point is connected
to the valve inlet.
V1 V2
pupz
8 Set the pressure switch to half the inlet pres-
surepu/2.

GB-3
D
GB
F
NL
I
E
▷The switching differential of the pressure switch
may not exceed ±10% of the set value.
Example:
inlet pressure pu= 100mbar,
set switching pressure pu/2 = 50mbar,
max. switching differential 50mbarx 10%=
5mbar.
The switch-on and switch-off pressure must be
between 45mbar and 55mbar.
Wiring
CAUTION
Electric shocks can be fatal!
– Before working on possible live components,
ensure the unit is disconnected from the power
supply.
Please observe the following to ensure that the TC
is not damaged during installation:
– Incorrect wiring may result in unsafe states and
the destruction of the tightness control, the au-
tomatic burner control unit or the valves.
– Do not reverse L1(+) and N(–).
Disconnect the system from the electrical power
supply.
Shut off the gas supply.
Open the housing cover of the TC.
▷Electrical connection: 2.5mm2terminals.
▷
The data on the type label must comply with the
mains voltage.
4 Prepare knock-out holes at the appropriate cable
glands.
▷Use the NO contacts 3COM and 2NO on the
pressure switch (pe/2=pu/2).
5 Electrically wire TC410.
12345678910 11 12 13
max. 1 A,
264 V
L1(+)V1
L1(+)V2
OK
ϑV2
V1
L1(+)
N(-)
ϑmax
pe/2
N
Setting the test instant
▷
The test instant (MODE) can be set inside the
housing using a jumper.
▷Mode 1: test before burner start-up with incom-
ing ϑsignal (factory setting).
▷
Mode 2: test after burner run with outgoing ϑsig-
nal and also after switching on the mains voltage.
▷Without jumper = test before burner start-up.
Disconnect the unit from the electrical power
supply.
Unscrew the housing cover.
Set the test instant with a jumper, MODE 1 or2.
V2
V1
L1(+)
N(-)
ϑmax
N
12 12
"TEST:"
TEST"
:"
Setting the test periodtP
▷
The test period t
P
is set at the works to 10s
(100s) on TC410-1 (TC410-10) and can be
changed with a jumper in increments of 10s
(100s) to a max. of 60s (600s).
▷Without jumper = 60s (600s).
▷
The longer the test periodtP, the smaller the leak-
age rate at which a safety shut-down is triggered.
▷If no leakage rate is specified, we recommend
the max. test period is set.
▷
If a leakage rate is specified, find the test pe
-
riodtPfrom the following:
Qmax. = max. flow rate [m3/h]
QL= Qmax. [m3/h] x 0.1% = leakage rate [l/h]
pu= inlet pressure [mbar]
VP= test volume [l], see page3 (Values for
valve and pipe volume)
▷
The tightness control TC requires a minimum
start rate in order to carry out tightness tests
on slow opening valves:
up to 5l (1.3gal) test volume VP= 5% of maxi-
mum flow rateQmax.,
up to 12l (3.12gal) test volume VP= 10% of
maximum flow rateQmax..
Determine test period tP.
tP[s] = 4x
(
pu[mbar] x VP[l]
+ 1 s
)
QL[l/h]
Values for valve and pipe volume
LVP= VV+ L xV
R
V
P
V1
V2
Valves
Valve
volume
VV[l]
Nominal
size
DN
Pipe
volume
VR[l/m]
VG 10 0.01 10 0.1
VG 15 0.07 15 0.2
VG 20 0.12 20 0.3
VG 25 0.2 25 0.5
VG 40/VK 40 0.7 40 1.3
VG 50/VK 50 1.2 50 2
VG 65/VK 65 265 3.3
VG 80/VK 80 480 5
VG 100/VK 100 8.3 100 7.9

GB-4
D
GB
F
NL
I
E
Valves
Valve
volume
VV[l]
Nominal
size
DN
Pipe
volume
VR[l/m]
VK 125 13.6 125 12.3
VK 150 20 150 17.7
VK 200 42 200 31.4
VK 250 66 250 49
VAS 1 0.08
VAS 2 0.32
VAS 3 0.68
VAS 6 1.37
VAS 7 2.04
VAS 8 3.34
VAS 9 5.41
VCS 1 0.05
VCS 2 0.18
VCS 3 0.39
VCS 6 1.11
VCS 7 1.40
VCS 8 2.82
VCS 9 4.34
Calculation example:
Qmax. = 100 m3/h
pu= 100 mbar
VP= VV+ L x VR= 7 l
QL= 100 m3/h x 0.1% = 100 l/h
4 x
(
100 x 7
+ 1 s
)
= 32 s
100
Set the next highest value (in this example 40s)
with the jumper.
Disconnect the unit from the electrical power
supply.
Unscrew the housing cover.
4 Connect the jumper to the pin for the required
test periodtPbetween 10 and 60 s (100 and
600 s).
V2
V1
L1(+)
N(-)
ϑmax
N
12 12
"TEST:"
TEST"
:"
5 Position the housing cover and screw tight.
6 Mark the set test periodt
P
on the type label with
a waterproof pen.
TC
CE-0085AP0020
tp(s) 10 20 30 40 50 60
D-49018 Osnabrück, Germany
Commissioning
▷Indicators and operating controls:
TEST
OK
12
TEST
= TEST phase (yellow)
OK
= operating signal (green)
1
= fault valve 1 (red)
2
= fault valve 2 (red)
= reset button
Main switch on.
Apply mains voltage to terminal1.
▷
If one or both fault lamps (red) are lit, wait ap-
prox. 5s then press the reset button. The fault
signal goes out.
Start the tightness test.
▷Mode , test before burner start-up.
4 Voltage at terminal3.
Or
▷Mode , test after burner run.
5 Mains voltage at terminal1 and renewed test
after switching off the voltage to terminal3.
The test begins:
▷LED
TEST
is lit.
After test, if the valves are tight:
▷LED
OK
is lit.
MODE 1: voltage at terminal 4.
Or
MODE 2: voltage at terminal 4 does not arrive
until voltage is applied to terminal3.
After test, if the valves are leaking: voltage at termi-
nals 8 and9.
▷LED
1
is lit.
Or
▷LED
2
is lit.
Power failure
▷If the power fails briefly during the test or during
operation, the tightness test will restart auto-
matically.
▷
After a power failure during a fault, both red fault
lamps will be lit.
Assistance in the event of
malfunction
CAUTION
Electric shocks can be fatal!
–
Before working on possible live components, en-
sure the unit is disconnected from the power supply.
– Fault-clearance must only be undertaken by
authorized trained personnel.
– (Remote) resets may only be conducted by
authorized personnel.
▷Faults may be cleared only using the measures
described below.

GB-5
D
GB
F
NL
I
E
▷
Press the reset button, see page 4 (Com-
missioning).
▷
If the tightness control will not start even though
all faults have been remedied, remove the unit
and send it to the manufacturer for inspection.
? Fault
! Cause
• Remedy
? No LED is lit although mains voltage and
ϑsignal are applied?
! Fuse defective.
• Replace 5A slow-acting fine-wire fuse– after
replacing the fuse, start the tightness test several
times and check the program sequence and the
outputs of the tightness control.
• If it does not operate correctly, return the unit to
the manufacturer.
! Mode : test before burner start-up is set; L1
and N are reversed on terminals 1 and2.
• Connect L1 to terminal 1 and N to terminal 2.
! For 24 V DC: polarity of mains voltage on termi-
nals 1 and2 reversed.
• Connect + to terminal1 and– to terminal2.
! Mains voltage too low.
• Compare to details on the type label. Tolerance:
-15/+10% for 110/120VAC and 220/240VAC,
±20% for 24VDC.
? TC repeatedly signals a fault?
! A valve is leaking.
• Replace the valve.
! Pressure switch incorrectly set.
• Set the pressure switch to half the inlet pressure.
! Wiring to the valves reversed.
• Start the program and observe the interspace
pressurepz. The pressure must change during
the TEST phase. Check the wiring.
! Inlet pressure pu< 10 mbar.
• Provide the min. inlet pressure of 10mbar.
! Interspace pressure pzcannot be reduced.
• The volume downstream of the valve on the
burner side must be 5times higher than the
volume between the valves and atmospheric
pressure must prevail.
! The test period tPis too long.
• Adjust tP, see page 3 (Setting the test pe-
riodtP).
? The downstream automatic burner control
unit does not start?
! On the tightness control, L1(+) and N(–) on
terminals 1 and2 are reversed.
• Connect L1(+) to terminal1 and N(–) to termi-
nal2.
? TEST phase running (yellow LED indicator is
lit) although no ϑsignal has been applied?
! Mode 2 set.
• Set jumper to Mode 1, see page3 (Setting
the test instant).
Maintenance
Tightness controls TC require little servicing. We rec-
ommend a function check once a year.
Technical data
Mains voltage:
110/120 V AC, -15/+10%, 50/60 Hz,
220/240 V AC, -15/+10%, 50/60 Hz,
24 V DC, ±20%.
Power consumption:
10 VA for 110/120 V AC and 220/240 V AC,
1.2 W for 24 V DC.
Ambient temperature: -15 to +60°C (5 to 140°F),
no condensation permitted.
Storage temperature: -15 to +40°C (5 to 104°F).
Screw terminals 2.5 mm2.
Fusing: fine-wire fuse 5 A, slow-acting, H pursuant
to IEC127, also protects the valve outputs and
external operating signal.
Switching current for valves/enable output:
max.5A.
External operating signal: with mains voltage,
max.5A resistive load (ULlisted: 5A for 120V),
max.2A at cosϕ=0.35 (pilot duty).
Fault output: dry contact (not internally fused),
max. 1 A for 220/240 V, max. 2 A for 120 V.
Reset: using a button on the device.
Remote reset: by applying mains voltage
(terminal5).
Housing made of impact-resistant plastic.
Gas type and inlet pressure: dependent on exter-
nal pressure switch.
Test period tP: TC 410-1: 10 to 60 s, adjustable.
Set at the factory to 10s.
TC 410-10: 100 to 600 s, adjustable. Set at the
factory to 100s.
Enclosure: IP40.
5 knock-out holes for M16 plastic cable glands.
Weight: approx. 400 g (0.88 lbs).
Designed lifetime
Max. service life under operating conditions: 10 years
after date of production or 250,000 operating cycles
pursuant to EN 1643.

GB-6
D
GB
F
NL
I
E
Contact
If you have any technical questions, please contact
your local branch office/agent. The addresses are
available on the Internet or from ElsterGmbH.
We reserve the right to make technical modifications
in the interests of progress.
Elster GmbH
Strotheweg 1, D-49504 Lotte (Büren)
Tel. +49 541 1214-0
Fax +49 541 1214-370
[email protected], www.kromschroeder.com
Logistics
Transport
Protect the unit from external forces (blows, shocks,
vibration). On receipt of the product, check that the
delivery is complete, see page 2 (Part designa-
tions). Report any transport damage immediately.
Storage
Store the product in a dry and clean place.
Storage temperature: see page5 (Technical data).
Storage time: 6months in the original packaging
before using for the first time. If stored for longer than
this, the overall service life will be reduced by the
corresponding amount of extra storage time.
Packaging
The packaging material is to be disposed of in ac-
cordance with local regulations.
Disposal
Components are to be disposed of separately in
accordance with local regulations.
Certification
Declaration of conformity
We, the manufacturer, hereby declare that the prod-
ucts TC comply with the requirements set out in
section 5.2.2.3.4 of EN 746-2. They achieve a safety
level equivalent to EN1643:2000.
Elster GmbH
Scan of the Declaration of conformity (D, GB) – see
www.docuthek.com
FM approved
Factory Mutual Research Class: 7400 and 7411
Safety overpressure slam shut valves. Designed for
applications pursuant to NFPA 85 and NFPA 86.
UL listed for 0 V
Underwriters Laboratories – UL 353 Limit control
Canadian Standards Association: CSA – C22.2 No. 24
Approval for Australia
AGA
Australian Gas Association, Approval No.: 4581
Eurasian Customs Union
The products TC meet the technical specifications
of the Eurasian Customs Union.
Directive on the restriction of the use of
hazardous substances (RoHS) in China
Scan of the Disclosure Table China RoHS2 – see
certificates at www.docuthek.com
Contact
Tabla de contenidos
Otros manuales de Controladores de Krom Schroder

Krom Schroder
Krom Schroder IC 50 Manual de usuario

Krom Schroder
Krom Schroder E8.5064 V1 Manual de usuario

Krom Schroder
Krom Schroder IC 40 Manual de usuario

Krom Schroder
Krom Schroder IC 20 Manual de usuario

Krom Schroder
Krom Schroder IC 20 Manual de usuario

Krom Schroder
Krom Schroder IC 50 Series Manual de usuario

Krom Schroder
Krom Schroder VGBF 15R Manual de usuario

Krom Schroder
Krom Schroder Lago Basic 0201 R V1 Manual de usuario

Krom Schroder
Krom Schroder VAD Manual de usuario

Krom Schroder
Krom Schroder IC 40 Manual de usuario