See fig's 1,5 & 6
1) Start by removing the servi e hat h. Remove the 4 fixing s rews, 2 at the top and 2 in the orners. There is a
Din Rail revealed on e the servi e hat h has been removed.
2) Use the able grommets to bring the ables into and out of the ontroller base .
3) Conne t the Mains IN as follows, Neutral blue wire to terminal #1 – Neutral IN, Live Brown wire to
terminal #2 – L1 IN, Live Black wire to terminal #3 – L2 IN, Live Grey wire to terminal #4 – L3 IN
see fig 5.
4) There are two methods on how to onne t the Infrared Heaters to the ontroller.
a) Conne t the heater or heaters Live to O/P1 terminal #5 switche L1, the O/P has a maximum load apa ity
of 6kW or 32amps. O/P1 an also be referred to as Zone 1. Conne t the heater Neutrals to Neutral Out
terminals #8 – 13. The heater Earth is onne ted to the Earth terminal #14. The remaining heaters should be
distributed a ross the remaining two outputs O/P2 & O/P3.
Please ensure that the load is balan ed a ross the output terminals #5 – 7.
Do not excee the maximum loa capacity per output.
b) Conne t to an external distribution box. Conne t O/P1 to terminals marked 1, O/P2 to terminals marked 2
and O/P3 to terminals marked 3. Conne t the Neutral OUT to the blue terminals marked N. Conne t the Earth
to the green/yellow Earth terminals. Then onne t the heaters to the other side of the terminals to the
appropriate onne tions. Live onne tions to terminals 1,2&3. Neutral onne tions to blue terminals N and
Earth onne tions to the Earth terminals. See fig 6.
5) When all onne tions are omplete and onne ted orre tly, he k on e again that the wiring is orre t as per
3) & 4). Then repla e the servi e hat h over and tighten the fixing s rews.
6) Turn ON or re onne t the Main Power to the ontroller. The red neon lamp on the front panel will illuminate
to indi ate that the unit is LIVE.
7) There are auxiliary devi es su h as mains operated PIR motion dete tors & timer (lag) swit hes. These an be
onne ted to terminals #15 – 17. External push button swit hes whi h are voltage lean or free an be
onne ted to terminals #18 – 20. Go to pages 7,8 & 9 and see fig's 9 to 12.
8) Remote operation ensure the Power ontrol dial is in position R. Follow the instru tions in page 3 for
QHVCR remote Master Controller .
9) Manual operation move the position of the dial through positions M, 1, 2, 3 & 4.
M = 0%, 1 = 33%, 2 = 50%, 3 = 66%, 4 = 100% see fig 3.
Remove wire links white, yellow & red.
Fig 4
IMPORTANT
If wire links or external push button
switches are not fitte the unit will not
operate when S2 is in the ON position.
See fig 4 &
Fig 3
Page 2