[ Description of wiring ]
The Signal GND of panel meter should not be connected
with tank wall or the cover of the EB Transmitter, otherwise
the measurement will be incorrect.
(Diagram 1) Power supply
Panel meter Panel meter
Warning
CALIBRATION PROCEDURESSETTING FLOWCHART FOR EACH FUNCTION
Standard procedures:
1.SCH : Set the max display value corresponding to 20mA at SCH.
2.SCL : Set the min display value corresponding to 4mA at SCL.
3.HIPT : Input and save the corresponding value at HIPT, while the
medium is in high level.
4.LOPT: Input and save the corresponding value at LOPT, while the
medium in is in low level.
Completed Calibration
Example 1:
The lowest value sets at 0 and the output sets at 4mA.
The highest value sets at 100.0 and the output sets at 20mA
Calibration is done in empty and full tank.
Example 2:
The lowest value sets at 100.0 and the output sets at 4mA.
The highest value sets at 200.0 and the output sets at 20mA
It is calibrated at 10% of tank high and 90% of tank high. The 0%
of the total height of the tank is corresponded to 4mA, while the
100% of the total height of the tank is corresponded to 20mA.
Procedures of calibration for example 2
1. Input:
Dot=1, SCL=100.0,
SCH=200.0
(It can be adjusted anytime; Nothing is related with the status
of tank.)
2. To fill the medium till reaching to
the 10% height of the tank, go to
the LOPT setting and input the
value of 10.0 and then press
"ENT" "SAVE'' (Remark 2).
3. To fill the medium till reaching
to the 90% height of the tank,
go to HIPT setting and input
the value of 90.0 and then
press "ENT" "SAVE''
(Remark 3).
3. When the tank is full, go to
HIPT setting and input 100.0,
then press "ENT" "SAVE"
(remark 1).
Procedures of calibration for example 1
1.Input:
Dot=1, SCL=0.0
SCH=100.0,
(It can be adjusted anytime; Nothing is related with the status
of tank.)
2. When the tank is empty, go to
the LOPT setting and input 0.0,
then press "ENT" "SAVE"
(remark 1).
Lowest point
Highest
point
10%
90%
Remark 1: Under the setting for Hipt & Lopt, press "ENT" to show
(screen flashing)
Press "ENT" button to save the value and then press "UP" button
to escape the setting.
Remark 2: When Hipt or Lopt setting is over range, the LCD show
"Err", Please reset the value.
Compact Capacitance Level Transmitter is to press the three
( )
buttons UP, SHIFT, ENTER on display panel. Firstly, selecting
the setting menu then input value by using three buttons
showing below:
Selection
Escape button
Enter button
Swap button
Setting
Increment button
Position shift button
Confirmation button
Up button
SHIFT button
ENTER button
●Swap Button is for swapping
to different menus, such as
from main menu to main
menu or from sub menu to
sub menu.
Enter Button
●Confirmation button. After revising
the SCH value, press enter button
to save the revised value.
Flashing alternately
:Revise Parameters
:Save Parameters
1 342
1234
SHIFT Button
●Shift Button is for entering a
sub menu from main menu
or doing a position shifting
after entering sub menu.
●Position Shift Button. After entering
revision mode, press this button to
shift into revisable position.
Flashing alternately
(Digit flashing means
the value is revisable.)
1234
12 43
Flashing alternately
1234
1230
●Increment button. After entering
revise mode, press this button to
increase the revisable value.
For example, changing SCH
value from "1230" to "1234" is to
press this button fourth.
UP Button
●Up button is enable to escape
from revision mode or to
escape from sub menu to
main menu.
Display value
Setting
value
Setting
value
Setting
value
Setting
value
Setting
value
WIRING AND CAUTION
1. Please install a concentric circles
2. The rod or wire probe should be parallel to the tank wall. To
prevent material from sticking between the probe and tank
wall , the probe shouldn't be too close to the tank wall.
3. If the container is irregular-shaped, such as a cylindrical ,
and the medium is liquid with low viscosity, the rod should
be placed inside a concentric circles metal with
vent hole at the top.(Fig. 1)
4. Coating Probe type is necessary for conductive media (eg.
Water...) , as the bare electrode can't operation normally in
conductive media.
5. During the installation, the process connection should be
grounded. An installation without proper grounding will not
guarantee normal operation of the device later on.
6. For non-conductive medium of powder or granules in big
tank , the wire probe should be fixed to the bottom of tank
7. When all electrical connections inside of Admittance Level
Transmitter housing are finished, the housing cover and the
conduit opening should be sealed and tightened to prevent
moisture from soaking in.
8. If an agitator is in place (see fig. 3), a pipe shield outside the
probe is recommended.
metal pipe shield with vent
hole at the top outside the probe (Fig. 1)
pipe shield
INSTALLATION
(Fig. 1)
(Fig. 2)(Fig. 3)
100%100%
0%0%
Empty TankEmpty Tank Full TankFull Tank
4mA
20mA
1.Read installation notice before calibration.
2.It is recommended to have the media touched probe
bottom when users calibrate lowest value for empty tank.
3.Doring calibration, pribe should be put into the tank.
Don't calibrate the product outside the tank.
4.Please keep at least 50% distance between HIPT and LOPT
to ensure accuracy. It is recommended to calibrate with
empty and highest level in the tank.
2
2
2
2
2 Connect isolation cable with GND of power.
2 Connect tank with heater or cover of electric device to decrease
EMI.
After installation of the Compact Capacitance LevelTransmitter on
the top of tank, please make sure the cover of the transmitter is
contacted with tank perfectly. Please avoid the grounding of panel
meter to touch the tank wall.
While the panel meter is not supplied with a power supply, please
prepare a 24V power supply for use. The wiring for panel meter is
showing in diagram 1.
The max cable length is depends on the max resistance.
Maximum resistance is not to exceed (Vs-15)H50W to
ensure the accuracy of measurement.
Make sure to separate the signal cable with other big power
cables (such as pump, conveyer and solenoid valve)while wiring.
Before turning on power, make sure all wirings are correct.
Material Dielectric
Constant.
DIELECTRIC CONSTANTS CHART
Air 1
Rice
Cement
Grain
Corn
Heavy Oil
Diesel
Edible Oil
3~8
4~6
2.5~4.5
2.3~2.6
2.6~3.0
2.1
2~4
Water
Sulfuric Acid
Ethanol
Acetone
Carbide
Powder
Ammonia
Butanol
81
84
16~31
20~30
5.8~7.0
21
11
Gasoline 1.9
Material Dielectric
Constant.
Rod probe
Cable probe
Rod probe
Agitator
Vent hole
Isolate
supporter
Ceramic
isolator
wire probe
Tube
Tel 886-2-22696789
: Fax: 886-2-22686682
No.16, Tzuchiang St., Tucheng Industrial Park, New Taipei City 23678, Taiwan.
FineTek Co. , Ltd.