Felder Hammer Manual de usuario

Machine Setup Guide
InstallVersion1.09

1. Foreword
This Machine Setup Guide is intended as an additional reference to the Operating
Manual that is provided with the machine, not as a substitute. Under no circumstance
should you use the machine without reading the Operation Manual first.
The correct operating procedures are described within the Operation Manual and
these must be rigidly adhered to, along with the guidelines described for safety. In
addition to this there is a significant amount of important information to be found in
the Operation Manual that is not covered by this Machine Setup Guide including
specific information for your particular machine. This Setup Guide is functional for a
variety of Hammer machines.
Safety First
Before every use of the machine, perform the safety checks that are detailed in the
Operation Manual for your particular machine. It is also important to understand that
even with all of the appropriate safety devices correctly installed, there are still risks
remaining. Any potential operators of the machine should be fully aware of these
risks and must also have read the Operation Manual before using the machine.
Never perform any adjustments to the machine with the tool running. Always switch
off the machine before making adjustments. Never work when you are tired and
always apply common sense to your working techniques in addition to those
techniques outlined in the Operation Manual.
©2005 HAMMER - Errors and modifications of technical data reserved at any time,
always use the safety devices provided with the machine.

2.Contents
Front Page
1. Start - Foreword
2. Contents
3. Introduction
4. An Overview of the Process
5. Delivery
a. How the Machine Will be Delivered
6. What You Will Need
a. Powering Up
b. For Basic Machine Checks
7. Removal From the Pallet
a. Pallet Fixings
b. Creating a Ramp
c. The Pallet jack
d. Pallet jack Dimensions
8. Positioning Your Machine
9.Extraction
10.Cleaning the Machine
a. Cleaner for Plastics / Tooling
b. Metall Glanz / Guideways and Spindle Fluid
c. Super Gleit
11.Assembly
a. Extension Tables
b. Rip Fence Guide Bar
c. Sliding Table
home

Contents (2)
13.Machine Alignments
a. Saws
b. Shapers
c. Joiners
d. Planers
e. Mortisers (for combination machines)
f. All
14.Machine Adjustments / Further Info.
12.Basic Machine Checks to Make
a. How to Make 5 Sided Cut
a. SS01 Freecut from the Sliding Table
b. SS02 Centre Locked Position
c. SS03 Sliding Table End Positions
d. SS05 Crosscut Fence on Outrigger, Position A
e. SS07 Crosscut Fence Scales
f. SS08 Angled Cut From Outrigger
g. SR04+SR05 Free Cut
h. SR07 Alignment of the Saw Blade at 90
i. SR08 Alignment of the Saw Blade at 45
j. SR09 Calibration of the Rip Fence Scale
k. SH02 Shaper Spindle at 90
l. SH03 Shaper Spindle at 45
m. JR06 Joiner Test Cuts
n. JR07 Snipe Check
o. PL01 Planer Test
p. PL02 Test for Snipe

Congratulations on your purchase and welcome to the world of HAMMER
woodworking machinery!
Through the co-operation of professional carpenters and specialists in research and
development, we have managed to create a unique range of woodworking machines
for the discerning craftsman.
The HAMMER series combines all the important characteristics of woodworking
machines in a number of forms: 4-in-1 combinations, 2-in-1 combinations or single
machines.In addition to this, an extensive range of accessories and tools leaves
nothing to be desired.
You can be sure that with your new HAMMER woodworking machine you can
achieve precise, outstanding results every time.
Please take the time to study this CD-ROM prior to the delivery of your machine, so
that once it arrives, no time will be wasted in getting you up and running with your
new HAMMER woodworking machine.
Enjoy your new machine,
From everyone at HAMMER!
This CD-ROM is aimed at helping you to achieve the highest standards possible in
woodworking, by furthering your understanding of the machinery that you will use to
do so.
Everything involved in the setup of your machine from delivery through assembly and
calibration, all of the equipment and materials you will need, to when you are ready to
produce the very first precision workpiece is covered in this CD-ROM.
You will also find this an invaluable asset in keeping your machine in top condition for
many years to come as it provides reference information that can be accessed at any
time.
3.Introduction
Where appropriate, there are direct links to relevant adjustments and alignment info.
and you can also return to the contents page by clicking the home icon in the top
right hand corner.

The Machine is manufactured, assembled and rigourously quality controlled at the
factory in Austria.
The machine is fully calibrated and test cuts are made before it is packed for
shipping.
The machine is then shipped out to you.
The machine is delivered
You unpack the machine from the container(s) and study the Operation Manual
You then remove the machine from the pallet
Only after reading the Operation Manual, clean all components of preserving oils
Assemble the machine, position it and connect it to the extraction system
Perform some basic checks to ensure accuracy and for peace of mind
Start enjoying your new Hammer!
Overview
4.Process

Before We Ship Anything…
Your machine has been manufactured, assembled and rigorously quality controlled at
our factory in Austria. The machine was fully assembled and fully calibrated,
including making test cuts. Once the quality controlling was completed (Homologation
to GS and CE - a guarantee for high quality and safe machines!), it was packed for
shipping, including treatment with preserving oils to protect the surfaces from
corrosion and to help ensure that the machine will arrive in perfect condition
Delivery
The machine will be delivered in a protective cardboard enclosure. Check for any
signs of obvious damage to this enclosure, or for signs of tampering. Machines with
sliding tables of length in excess of 78"(2 meters) will have the sliding table shipped
in a separate container.
An agreement between the FELDER Group and the shipping companies in the U.S.
means that you, as a receiver, are allowed to inspect the shipment(s) for any kind of
damage for 30 minutes upon arrival. This agreement also stipulates that any claims
filed after this time will not be honored by the shipper.
In the unlikely instance that you believe there is or may be a damaged machine,
article or component, please contact FELDER without delay so that this may be
further clarified and if necessary, further action taken.
5.Delivery

What You Will Need to Get Going
Cutting knife
Torx head bits
Power drill
Wrenches
13mm, 17mm Sockets and ratchet drive
Screwdrivers, Flat and Crossheaded
Electrical provision*
Board, 2ft x 4ft x ½”
Board, 2” x 4” x 2ft
Pallet jack
An assistant (for sliding table assembly and to help bring the machine down
from it’s pallet)
*Powering Up
All new Hammer machines arrive with approximately 0,5 meters of cord and no
plug, due to the number of variations in plugs/sockets across the market.
These machines will therefore require a plug suitable for the electrical system
you already have installed.
Will Need
6.What You
Standard Breaker size is 30A. Please consult your electrican for details on
arranging this
Tabla de contenidos
Manuales populares de Cortador de otras marcas

Milwaukee
Milwaukee HEAVY DUTY M12 FCOT Manual de usuario

Makita
Makita DCS552 Manual de usuario

SignWarehouse.com
SignWarehouse.com Bobcat BA-60 Manual de usuario

Makita
Makita 4112HS Manual de usuario

GEISMAR STUMEC
GEISMAR STUMEC MTZ 350S Manual de usuario

Hitachi
Hitachi CM 4SB2 Guía de solución de problemas