
บริษัท เอดีดี เฟอร์เนส จํากัด
ADD FURNACE CO.,LTD.
44 ซอยบรมราชชนนี 70 ถนนบรมราชชนนี แขวงศาลาธรรมสพน์ เขตทวีวัฒนา กรุงเทพฯ 10170
โทร: 02-888-3472 โทร: ออกแบบ:08-08-170-170 แฟกซ์: 02-888-3258
Installation
(Do not open the cover of control panel-You can receive electric shock)
1. Please pull the lower bolt. Then insert shutoff device into valve
2. Please correspond the location of the spindle of valve handle with that
of shutoff device exactly.
3. Tighten up the two bolts for shutoff device not to move. And check
fixing again
4. Please match the wires of the control panel with terminals of the shutoff
Device in color (RED: + / BLACK: -) (If you connect the wires reversely,
the shutoff device operates reversely as well)
6. INSTALLATION
1. When the control panel raises visual and audible alarms, and signal light
and CLOSE light gets lit → Check the closure of valve for yourself
2. When signal light on the control panel gets lit, confirm whether gas is
being leaked actually or not IF gas is not being emitted actually, after
resetting the gas detector, reset the control panel. And then open the
valve to use it by pressing the Open & Close button
(Refer to gas company to confirm the leakage exactly)
3. When alarm of the detector is not reset so the control panel does not
operate though gas has not been leaked → Contact us
4. If there are trouble at the circuit of the control panel or visual and
audible alarm is raised → Check the leakage thoroughly and refer to us
or shop where you purchased or installation company
5. The control panel should be at the place where it is able to be watched
and (Area to avoid:
① A humid, filthy or dustyplace
② Near drafts caused by heating, ventilating, fans and doors
③ Near vapor, steam, exhaust gas, dust, strong wind and other
gases 4 . Areas of high heat and humidity )