Energomera CE208 Manual de usuario

СЕ208
САНТ.411152.068-05.1 РЭ
Operation Manual
Manufacturer:
Electrotechnical Factories Energomera JSC
415 Lenina Str., Stavropol, Russia 355029
Tel.: (8652) 35-75-27, Fax: 56-66-90,
Hot line (free): 8-800-200-75-27
e-mail: concern@energomera.ru
www.energomera.ru
Warranty service:
217 Gagarina street, Nevinnomyssk,
Stavropol region, 357106
Electric energy meter
Single-phase multifunctional
Case type S7
OKP 42 2863 6
Harmonized System Codes (TN VED) 9028301 100

2

2 3
CONTENTS
1 SAFETY REQUIREMENTS ....................................................................................................................................5
2.1 Purpose ............................................................................................................................................................... 6
2.2 Designation of meter modifications .................................................................................................................... 8
2.3 The meter is certified.......................................................................................................................................... 12
2.4 Normal operating conditions: .............................................................................................................................12
2.5 Operating usage conditions ...............................................................................................................................12
2.6 Ambient conditions ...........................................................................................................................................13
2.7 Technical specifications ..................................................................................................................................... 13
2.8 Meter design ..................................................................................................................................................... 18
3 PREPARING THE METER FOR OPERATION........................................................................................................ 19
3.1 Unpacking .........................................................................................................................................................19
3.2 Preparing for operation ......................................................................................................................................19
3.3 Installation procedure ........................................................................................................................................20
3.4 Wiring diagrams ................................................................................................................................................21
3.5 Lithium cell replacement .................................................................................................................................... 26
3.6 Meter configuration ........................................................................................................................................... 27
4 READING THE METER ..................................................................................................................................... 27
4.1 Displaying information on the LCD ....................................................................................................................27
4.2 Viewing total accumulated values (on an accrual basis) ......................................................................................29
5 METER VERIFICATION ..................................................................................................................................... 35
6 MAINTENANCE AND SEALING........................................................................................................................ 36

4
7 ROUTINE MAINTENANCE ...............................................................................................................................36
8 STORAGE AND TRANSPORTATION CONDITIONS ............................................................................................. 37
9 CONTAINERS AND PACKING ...........................................................................................................................38
10 LABELING .....................................................................................................................................................39
ANNEX A ...........................................................................................................................................................40
ANNEX B ........................................................................................................................................................... 41
ANNEX C ...........................................................................................................................................................42

4 5
This САНТ.411152.068-05.1 РЭ Operation Manual contains brief information about CE208 S7 multifunctional
single-phase electric energy meter (hereinafter referred to as the «Meter»). Complete information on the above
meter is contained in САНТ.411152.068-05.1 РП User Manual, which can be found at the manufacturer’s website:
www.energomena.ru/ru/products/meters/ce208-all.
When learning about the meter and operating it, you must be additionally guided by
САНТ.411152.068-03.1 ФО Data Sheet (supplied with the meter) and САНТ.411152.068-05.1 РП User Manual.
Only persons who have received special training for working with voltages up to 1000 V and who have studied
the Operation Manual are allowed to work with the meter.
1 SAFETY REQUIREMENTS
1.1 By operational safety, the meter meets the safety requirements of GOST 22261-94 and IEC 61010-1:2001.
1.2 Protection against electric shock is ensured through the use of double or reinforced insulation according
to IEC 61010-1:2001.
1.3 The insulation between all current and voltage circuits connected together and with the «ground» can
withstand a voltage of 4 kV AC at 50 Hz for 1 minute. During the test, the leads of the electrical test output device,
the interface circuits are connected to the «ground» (the «ground» is a conductive foil film enclosing the meter and
attached to a flat conductive surface on which the meter base is mounted).
1.4 The insulation between all current and voltage circuits connected together and with the «ground» can
withstand pulse voltage of 6 kV. During the test, the leads of the electrical test output device must be connected to
the «ground».
1.5 Insulation resistance between the casing and electrical circuits, at least:
20 MΩ — under conditions of clause 2.5;
7 MΩ – at an ambient air temperature (40±2) °С, relative air humidity of 93%.
1.6 The meter must be installed and operated in accordance with the applicable rules for technical operation of
electrical installations.
1.7 Do not put foreign objects on the meter, avoid bumps.

6
2 METER DESCRIPTION
2.1 Purpose
The meter is single-phase, multifunctional, direct connection, and is designed to measure active and reactive
electric energy in single-phase AC circuits.
The meter has the following functions:
• multi-tariff electricity metering (with three tariff levels - event-based, external and time-based tariffing);
• maintenance of the retrospective (recording the current values of energy storage devices: at the end of the
billing period (month), at the end of the day, at the end of the year and upon occurrence of a specific event);
• maintaining a load profile, with the ability to customize the type of the parameters stored and the averaging
time;
• measuring network parameters: voltage frequency, current in the phase and neutral wires, voltage, angle
between current and voltage, active power factor, active, reactive and apparent power;
• measuring Unified Power Quality Index (UPQI) in accordance with class «S» of the measurement process
specifications in IEC 61000-4-30:2008: stable voltage deviation, network frequency deviation, duration and depth
of voltage dips, duration and maximum value of overvoltage, interruptions in power supply;
• power quality analysis for compliance with quality standards in accordance with EN50160:2010;
• indicating the instance of violating an individual power quality indicator on the LCD (disabled by default);
• recording the violation of an individual power quality indicator (event logs available for reading on the interface);
• monitoring active power consumption;
• monitoring «instantaneous power» consumption;
• monitoring active energy consumption (control of energy limits, prepaid mode, low consumption control);
• monitoring supply network voltage;
• monitoring current;
• monitoring network frequency;
• monitoring the oncoming power flow (in the phase and neutral wires);

6 7
• telemetric output with the ability to use it as a «relay»;
• alarm using the interface (the ability to act as an initiator of communication with the level of DCU or HES during:
terminal cover opening; exposure to a magnetic field; reparameterization; maximum power excess; deviation
from the normalized value of voltage level, etc., in accordance with the full list, for details, see the user manual
САНТ.411152.068-05.1 РП);
• time accounting;
• self-diagnostics;
• information protection;
• protection against unauthorized opening (electronic seals);
• magnetic field sensor;
• event logs with recording of: terminal cover opening; case opening; dates of last re-programming; exposure
to a magnetic field causing unacceptable deviations of the metrological characteristics of the metering device;
facts of communication with the metering device that led to data changes; voltage deviations from the device’s
nominal values in the measuring circuits; results of self-diagnostics; changes in the current values of time and date
during time synchronization (at least 3,500 records using the DMLS protocol), etc., for details, see the user manual
САНТ.411152.068-05.1 РП;
• mechanism for flexible adjustment of the reaction to events occurring in the meter;
• DLMS/COSEM exchange protocol support;
• display of information on the LCD accompanied by OBIS codes;
• management of consumer load according to a predefined schedule.
The meter’s functions are described in detail in the full version of САНТ.411152.068-05.1 РП.
The meter can be used in Automatic Informational and Measuring Systems for Commercial Electric Power
Metering (AMI systems) to transfer the parameters measured or calculated to the control room for controlling,
accounting and distributing electric power.
The measurement results are obtained through processing and calculating current and voltage input signals
performed by the microprocessor circuit on the meter board. The measured data and other information are displayed

8
on a liquid crystal display (LCD) and can be transmitted via an optical port or one of the interfaces.
The meter has an electronic measuring mechanism performing active and reactive energy measurement in
kW•h and kVar•h, respectively, cumulatively and according to eight tariffs in one or two (for a bi-directional meter)
directions of electric energy metering.
The meter has two additional electronic measuring mechanisms performing active and reactive energy metering
in kW•h and kVar•h, respectively, in one or two (for a bi-directional meter) directions of electric energy metering by
specified events (tariff 9, tariff 10).
Changing time of the measuring mechanism indications complies with the requirements of IEC 62052-11:2003,
IEC 62053-21:2003 and IEC 62053-23:2003.
2.2 Designation of meter modifications
2.2.1 The structure of meter designation is shown in Figure 2.1.

8 9
СЕ 208 S7.Х4Х.Х.OХ.XXXX XXX
Designation of the integrated communication module
Additional functions:
See Table 2.3.
Integrated communication interfaces:
See Table 2.2.
Number of measuring elements:
1 – meter with one current sensor (in the phase circuit);
2 – meter with two current sensors (in the phase and neutral circuits);
Nominal or base (max.) current:
5 – 5(60) А;
6 – 5(100) А.
Nominal voltage (phase/line):
4 – 3x230/400 V.
Active/reactive energy accuracy class:
8 – 1/2 for active/reactive energy;
7 – 1/1 for active/reactive energy.
Body type and number:
S7 – for 3 screws mounting
Figure 2.1 – Designation structure

10
Table 2.1
Item No. Designation Interface
1 O Optical port
2 А RS485
3 P PLC interface
4 R1 Radio interface with a built-in antenna
5 R2 Radio interface with an external antenna socket
6 G GSM/GPRS modem
7 N Ethernet interface
Table 2.2
Item No. Designation Additional function
1 Q* Load control relay
2 Y* 2 directions of metering
3 U* Network parameters
4 V* Electronic seals
5 F* Magnetic field sensor
6L* LCD backlight
7 Z* Extended set of parameters
* — by default, included in all meter versions
Otros manuales para CE208
1
Tabla de contenidos
Otros manuales de Instrumento de medición de Energomera
Manuales populares de Instrumento de medición de otras marcas

Endress+Hauser
Endress+Hauser Proline Promag 50 Especificaciones técnicas

Siemens
Siemens SITRANS F Coriolis FCT030 Manual de lista de piezas

KLINGER
KLINGER CMF V Series Manual de usuario

EXFO
EXFO FTB-2 Manual de operación y mantenimiento

Keysight
Keysight M8290A Manual de usuario

ADTEK
ADTEK MW-5 Manual de usuario
















