
9
Warning: Wiring must be installed in compliance with local regulations.
Warning: This product should only be installed in a location where an all-pole mains switch
in accordance with Annex L of EN62368-1 is incorporated in the electrical installation of the
building. As the device is permanently connected to mains supply, the appropriate disconnect
device shall be provided as part of the building installation.
Warning: Please ensure you turn on the battery backup switch to its ON position as per figure 1
on page 7. (If you have not done so already during the GSM signal strength check). Failure to carry
out this step will result in no battery backup capability if power is lost to the Gateway.
Now you can energize the mains supply to the Gateway, the green LED will illuminate, at the same time the blue
LED will flash for 30-40 sec (see Panel / Icon Overview on page 5). This indicates that the Gateway is powering
up and connecting to the SmartLINK server. Please do not start the installation procedure until the Blue LED has
stopped flashing.
Gateway LED Indicator Table
Action Operation Green LED Blue LED Yellow LED
Energise mains supply Power up On Flashing (30-40 sec) On (2 sec)
Hold Test button (4 sec) Button Test / Signal Strength Test On Flashing Flashing
Hold House Code button until blue LED lights Enter House Code mode On Flashing Off
Hold House Code button until blue LED lights Exit House Code mode On On (1 sec) Off
Hold House Code button until blue LED flashes Factory reset On On (1 sec) Off