ECOfit & ECOfit Plus Rolls Technical Manual
www.ecorecommercial.com 4
HAZARDS
SILICA WARNING: Concrete, floor patching compounds, toppings, and leveling compounds can contain
free crystalline silica. Respirable crystalline silica (particles 1–10 micrometers) can be produced by
cutting, sawing, grinding, or drilling. Respirable silica is classified by OSHA as an IA carcinogen and is
known to cause silicosis and other respiratory diseases. Avoid actions that cause dust to become
airborne. Use local or general ventilation or protective equipment to reduce exposure below applicable
exposure limits.
ASBESTOS WARNING: Resilient flooring, backing, lining felt, paint or asphaltic “cutback” adhesives can
contain asbestos fibers. Avoid actions that cause dust to become airborne. Do not sand, dry sweep, dry
scrape, drill, saw, beadblast or mechanically chip or pulverize. Regulations may require that the material
be tested to determine asbestos content. Consult the documents titled Recommended Work Practices
for Removal of Existing Resilient Floor Coverings, available from the Resilient Floor Covering Institute.
LEAD WARNING: Certain paints can contain lead. Exposure to excessive amounts of lead dust presents a
health hazard. Refer to applicable federal, state, and local laws and the publication Lead Based Paint:
Guidelines for Hazard Identification and Abatement in Public and Indian Housing, available from the
United States Department of Housing and Urban Development.
G. Moisture must be measured using the RH Relative Humidity test method per ASTM F2170
standard. Moisture content should not exceed 85% RH. If the levels exceed the limitations, the
installation should not proceed until the situation has been corrected.
H. In the event that a moisture mitigation system is required, it must conform to the ASTM F3010
Standard Practice for Two-Component Resin Based Membrane Forming Moisture Mitigation
Systems for use Under Resilient Floor Coverings.
I. It is essential that pH tests be taken on all concrete floors. If the pH is greater than 9, it must be
neutralized prior to beginning the installation.
J. Adhesive bond tests should be conducted in several locations throughout the area. Glue down
3´ x 3´ test pieces of the flooring with the recommended adhesive and trowel. Allow to set for
72 hours before attempting to remove. A sufficient amount of force should be required to
remove the flooring and, when removed, there should be adhesive residue on the subfloor and
on the back of the test pieces.
IV. MATERIAL STORAGE AND HANDLING
A. Material should be delivered to the job site in its original unopened packaging with all labels
intact.
B. Roll material should always be stored lying down. Storing rubber on end will curl the edges,
resulting in permanent memory of the material. Do not store rolls higher than 4 rolls or for
more than 6 months. Material should only be stored on a clean, dry, smooth surface.
C. All edges with memory curl should be straight cut before installation. In some instances it may
be necessary to weigh down the seam until adhesive develops a firm set.
D. Inspect all material for visual defects prior to beginning the installation. No labor claim will be
honored on material installed with visual defects. Verify the material delivered is the correct
style, color, and amount. Any discrepancies must be reported immediately before beginning
installation.