
PDN LITE
OOBM
Field Manual
www.portablessupport.com 6
GENERAL USE
ON
OFF
Main Power Switch must be in
the “ON” position for the PDN
to function and charge.
When traveling by airplane, the switch must
be turned o, cutting power to the PDN.
Standby Button enables
and disables the gateway.
While in standby mode,
Battery Gauge will still indicate charge.
When charging, lights will continuously
scale from left to right.
Connects directly to
CBA850
as an alternative serial port
in certain configurations.
Main Power Switch
Battery Gauge &
Standby Button
USB Port
To charge unit, plug into AC
Charging Port via AC Power
Cord with Main Power
Switch “ON.” Battery Gauge
will scale to indicate charge. Unit can run
at the same time that it is being charged.
Charging
Auxiliary
If battery charge is
low and an AC power
source is unavailable, use the DC
Power Port to power the device. DC
Power Port is operable with any
9-18V DC external power source
that can be used with the
provided
SAE terminated
cables. Unit will run
but not charge when connected
via Auxiliary DC Power Port.
Data
Use Console
RJ45 Port
to connect
downstream networking equipment
for out of band management (OOBM)
and remote control/diagnostics.
Use the Bridged Pass-through RJ45
Port to provide head-end equipment
with an available cellular WAN for
backup/fail-over Internet. Bridged
Pass-through RJ45 Port can be
configured to be a bridged
pass-through connection or WAN/
LAN port.
Note: Your PDN comes preconfigured and
assembled. The unit is ready to use out
of the box. Please contact DHWS if you
require additional details regarding internal
components.
DC POWER PORT
(12V DC)
WAN (IN)
LAN (OUT)
RJ45 PORTS:
AC POWER PORT
(110-120V AC 50-60Hz)