Quick installation guide for RPI H3 inverters
General Safety Instructions
1
DANGER
Risk of death by electrocution
Potentially fatal voltage is applied to the solar
inverter during operation. This potentially fatal
voltage is still present for 15 seconds after all
power sources have been disconnected.
ŹNever open the solar inverter.
ŹAlways disconnect the solar inverter from
power before installation, open the DC
disconnection switch and make sure neither
can be accidentally reconnected.
ŹWait at least 60 seconds until the capacitors
have discharged.
DANGER
Risk of death or serious injury from elec-
trocution
Potentially fatal voltage may be applied to the
DC connections of the solar inverter. When light
is falling on solar modules, they immediately start
producing energy. They do so, even when the
sun is not shining.
ŹNever disconnect the solar modules when the
solar inverter is powered.
ŹFirst switch off the grid connection so that
the solar inverter cannot feed energy into the
grid.
ŹTurn the DC disconnection switch to position
OFF.
ŹMake sure the DC connections cannot be
accidentally touched.
ƔRead this quick installation guide before you start installing
the inverter.
ƔThe solar inverter can be safely and normally operated if
installed and used in accordance with this manual (see
IEC 62109-5.3.3). Delta Energy Systems is not responsible
for damage incurred by failure to observe the installation and
commissioning instructions in this manual. For this reason,
be sure to observe and follow all instructions!
ƔInstallation and commissioning may only be performed by
TXDOL¿HGHOHFWULFLDQVXVLQJWKHLQVWDOODWLRQDQGFRPPLVVLRQ-
ing instructions found in this manual.
ƔThe solar inverter must be disconnected from power and the
solar modules before any work on it can be performed.
ƔThe solar inverter has a high leakage current value. The
ground wire must be connected before commissioning.
ƔDo not remove any warning signs that the manufacturer has
installed on the solar inverter.
ƔImproper handling of the solar inverter may result in physical
injury and damage to property. For this reason, observe and
follow all general safety instructions and warnings.
ƔThe solar inverter contains no components that must be
maintained or repaired by the operator or installer. All repairs
must be performed by Delta Energy Systems. Opening the
cover will void the warranty.
ƔDo not disconnect any cables when the solar inverter is pow-
ered due to risk of a fault arc.
ƔTo prevent lightning strikes, follow the relevant regulations
applicable in your country.
ƔThe surface of the solar inverter can become very hot dur-
ing operation. Use safety gloves when working on the solar
inverter.
ƔOnly devices in compliance with SELV (EN 69050) may be
connected to the RS485 interfaces.
Ɣ $OOFRQQHFWLRQVPXVWEHVXI¿FLHQWO\LQVXODWHGLQRUGHUWRFRP-
ply with the IP65 protection rating. Unused connections must
be closed by placing cover caps on the solar inverter.
RPI_H3_QIG_V1.0_EU_EN_2015-05-11.indd 3 15.05.15 11:31