ASSEMBLY
The frame is supplied semi-assembled to allow a quick assembly of your MINING-RIG.
To complete it, simply mount the handle and support base.
Use the washers provided to mount the support base to ensure maximum rigidity.
The technical drawing of the frame is inserted in the box.
The chassis is also designed to allow the installation of GPUs with centrifugal ventilation (which blow air
only from the front and GPUs with 3 fans.
The GPUs of the various manufacturers often have different cooling air flows, so once the GPUs are
installed, before adding the optional front fans, check that they are compatible with the GPU air flow (in
some cases it is best to mount the fans in suction, in others with direct air direction on the GPUs
In some cases, mounting a fan that pushes the air against the GPU flow may create hot air stagnation
points and worsen the cooling.
RISER CLAMP BRACKET
One of the most common problems with MINING-RIGs is to secure the Mini-Riser
connectors that lock into the PCI-EXPRESS connectors on the motherboard.
The RIG-V6 frame uses a bracket to be fixed with 2 screws that allows you to lock and
hold the 6 connectors in the correct position. It may be necessary in some cases to
bend the bracket slightly with a clamp to better secure the PCI-RISERs. He Riser is
compatible also with 13gpu motherboard (in example Asrock H110 mining and Micro-
Atx mainboard.
GPU PLASTIC RIVETS
The supplied removable plastic rivets are used to quickly fasten the GPUs to the
frame.
They also allow for quick disassembly in case of maintenance, bios flash, etc.
To remove the curved plastic rivets, simply press the rivet from behind (putting your fingers between the
rectangular slots of the front panel on the left in its central rung.
HARD DISK OR BOOT DISK
An SSD hard disk can be placed on top
of the power supply by attaching it to
the cables.
A USB 3.0 stick or the new M2 SSD hard
disk drives mounted directly on the
motherboard can also be used to avoid
extra cables.
3,5-inch hard disk drives are now not
recommended even if they can be
placed under the base of the RIG.