Contents
1. Intended use 5
2. Technical description 5
Control panel appearance 6
3. Technical data 7
Boiler drawings key 8
Technical data 8
Drawings of boilers 9
Extraction ventilator schematics – boiler types D20P, D30P, D40P and D50P 10
4. Supplied boiler accessories 11
Automatic ash removal from the boiler drum 11
5. Fuel 12
Basic wood burning data 12
Fuel heating capacity 13
6. Boiler bases 13
7. Environment type and boiler placement in a boiler room 13
8. Chimney 14
9. Flue-gas duct 14
10. Fire prevention during installation and use of heating appliances 15
11. Connecting boilers to the electric network 16
12. Electric wiring diagram for the boiler D15P without an extraction fan - model 2012 with a 6-pin connector 17
13.
Electric wiring diagram for the boilers D20P, D30P, D40P and D50P with an extraction fan - model 2012 with a
6-pin connector
17
14.
Electric wiring diagram for the boiler D15P without an extraction fan
with a 6-pin connector
and
module AD02 to control pump in boiler circuit from burner control unit AC07X (R) 18
15. Electric wiring diagram for the boilers D20P, D30P, D40P and D50P with an extraction fan, modele 2012 with 6-pin
connector and module AD02 - to control extraction fan of the boiler from burner control unit AC07X (R) 18
16. Wiring diagram connection of the boilers D20P, D30P, D40P and D50P with extraction fan, model 2012 with
6-pin connector and two modules AD02 - to control extraction fan of the boiler and pump in the boiler
circuit from burner control unit AC07X (R and R2) 19
17. Wiring diagram connection of the boilers D20P, D30P, D40P and D50Pwith extraction fan, model 2012 with
6-pin connector and module AD03 - to control extraction fan of the boiler and pump in the boiler circuit
from burner control unit AC07X (R and R2) 20
18. Obligatory ČSN EN standards related to boiler designing and installation 21
19. Choice and connection method of control and heating elements 21
20. Boiler corrosion protection 22
21. Prescribed boiler connection with an equalizing tank for burner control on the basis of TS and TV sensors 23
22. Prescribed boiler connection with an equalizing tank and with the ACD01 electronic control unit 23
23. Possible boiler connection with equalizing tank with DHW boiler and with solar system 24
24. Possible boiler connection with Laddomat 21/22 24
25. Laddomat 21/22 25
26. Thermoregulatory valve 25
27. Connection of overheat protecting cooling loop with a safety valve Honeywell TS 130 - 3/4 A or
WATTS STS20 26
28. Operating instructions 26
Preparing boilers for operation when burning pellets 26
Relation of waste gas temperatur to boiler (burner) output when burning pellets 28
29. Placing the shaped pieces into the combustion area 28
Connecting the burner A25 into boilers D15P and D20P 29
Connecting the burner A45 into boilers D30P, D40P and D50P 29
Boiler system with an external silo and conveyor of pellets 30
Boiler room with a large built-in pellet storage 31
Preparing boiler operation for emergency burning wood 32
Ignition and operation when burning alternative fuel - wood 32
Additional secondary air inlet placed under the doorframe 32
Mechanical output regulation – when burning alternative fuel (wood) 33
Draught regulator - HONEYWELL Braukmann FR124 – Assembly instructions 33
30. Fuel rell when burning alternative fuel (wood) 33
31. Boiler cleaning and ash removal 34
32. Heating system maintenance - including boilers 35
33. Use and inspections 35
34. Possible failures and troubleshooting 36
35. Spares 37
Door sealing cord replacement 38
Adjusting the door hinges and locks 38
36. Environmental protection 38
Disposal of the boiler after expiration of its service life 38
GUARANTEE CONDITIONS 39
BOILER INSTALLATION REPORT 40
ANNUAL INSPECTIONS RECORDS 41
RECORDS OF GUARANTEE PERIOD AND POST-GUARANTEE PERIOD REPAIRS