
08 I Solclear UV Sterilizer
INSTALLATION:
1. Install Solclear UV sterilizer in a readily accessible and well-lit location to facilitate
inspection and maintenance.
2. Inspect for hidden electrical wiring or plumbing prior to drilling holes.
3. Attach mounting clips to the wall.
4. Insert chamber through mounting clips.
5. Connect to plumbing.
6. Install quartz sleeve and lamp.
Note: Avoid touching the sides of the quartz sleeve and lamp, handle by the ends only.
Ultraviolet lamp and quartz sleeve are easily damaged. Pay attention when removing or
replacing lamp and quartz sleeve.
a. Remove the aluminium / PVC nut (2).
b. Slide carefully the quartz sleeve (6) from one end to another end of the
chamber.
c. Slide the O-ring (5) at the open end of quartz sleeve for Soclear 90 & 150.
For Solclear 300, please put O-ring (5) at the both end of quartz sleeve.
d. Tighten the aluminium / PVC nut (2) hand tight.
e. Slide the lamp (4) into the quartz sleeve.
f. Connect the lamp to the lamp socket.
g. Tighten the water proof strainer (1) into the aluminium / PVC nut (2).
7. Turn on the water and inspect for leakages. Rectify as necessary.
8. Plug the ballast into an electrical outlet. An electrical outlet protected by a Ground Fault
Interrupt (GFI) circuit is recommended.
9. Run water through the chamber for 5-10 minutes prior to use.