tradetested GS504-V1 Manual de usuario

18002020
1550740
1550
1750
www.tradetested.co.nz[email protected]0800 800 880GARDEN SHEDMANUAL GS504-V1Shed Size at Roof: 1550x1750x2020mmShed Size at Floor: 1550x1550x2000mmDoor Size: 1950x740mmInternal Shed Size at Floor: 1510x1510mm

1Trade Tested - GS504-V1 - 1.55x1.55 GARDEN SHEDBefore you begin● Check local building codes regarding shed locaonandanyotherlocalrequirements.● Check the packing list on page 4 to make sure you have all of the necessary parts.● Separate everything in the cartons by the part number while reviewing the parts list.● Be sure the day you select to build your shed is dry and calm.● Whenever possible, two or more people should work together to assemble the shed. Wesuggest that one person posionspartswhiletheotherhandlesthefastenersandtools.Before assembly, decide on a locaonforyourshed.Werecommendalevelareawithgooddrainage. Allow enough space around the building so there's plenty of room to screw thepanels and move the differentpartsintoposion.Remembertoleaveplentyofroomforthedoor to fully open.● An electric drill/driver● A Phillips screwdriver● Gardening or work gloves● Sealant or caulking gum (oponal)● Step ladder● Tape measureSafety FirstSafety precauonsareimportanttofollowthroughouttheconstruconofyourbuilding.● Take care when handling the various pieces of your building since some contain sharpedges. Please wear work gloves, eye proteconandlongsleeveswhenassemblingorperforming any maintenance.● Keep children and pets away from your worksite to avoid distraconsandanyaccidents.● Never concentrate all your weight on the roof of the structure. When using a stepladder make sure it’s fully open and on a level surface.● To avoid any damage, do not aempttoassemblethebuildingonawindyday.Thelarger panels can act as sails making construcondifficultandunsafe.You Will Need...Selecting & Preparing Your Site

2Trade Tested - GS504-V1 - 1.55x1.55 GARDEN SHEDFlooring & FoundationsA solid shed starts with a level floorandfoundaon.Thisisthesinglemostimportantfactorinmakingyour shed as waterghtandstableaspossible.Italsomakestheassemblyprocessassimpleaspossible.We recommend the following foundaonopons:Opon1‐WoodenFloorWe sell wooden floorkitsdesignedtomatchyourshed.AlternavelyyoucanbuildyourownusingH4treated bearers and mberfloorboards.Regardless of which flooringoponyouchoose:● Build on a compacted and levelled base layer.● Plastic sheeting placed under the wood or concrete will prevent moisture wicking through.● We recommend the foundation is the same size as the footprint of your shed to prevent water ingress.Opon2‐ConcreteSlabFor a more permanent soluon,orforlargesheds,werecommenda100mmthickconcretefoundaon,ideally with a 25mm rebate for walls and corner anchors.Assembly OverviewStep 1: Check all parts against the parts listStep 2: Assemble the rear wallStep 3: Assemble the side wallsStep 4: Assemble the front wallStep 5: Assemble the roofStep 6: Assemble the doorStep 7: ConstrucngthewallsStep 8: ConstrucngtheroofStep 9: Installing the doorStep 10: Fixing to the floorStep 11: Finishing touches

3 ASSEMBLYINSTRUCTIONS

4Trade Tested - GS504-V1 - 1.55x1.55 GARDEN SHEDGS504-V1If you’re missing anything, just head to www.tradetested.co.nz and get in touch.PARTS LISTPlease check your contents prior to starngassembly1Check all parts against the parts list12W200Front Wall410 x 200024W180RearWall410 x 180034P175Roof Panel410 x 175045121314151 L185180SideWall 162U155Roof Channel1550 172G175 Roof Channel17502 U155FrontWall Channel15501U200LeDoorFrame20001MR200Right Door Frame1Z0745DoorTop Frame7451U0745745Door BoomFrameITEMQTYPART #NAMESIZE (mm)67Corner Anchor8Hook Anchor4Tek Screws140Wood Anchor Screws10Rivet50Corner Cover4Spacer50Rivet Gun1Tek Screwdriver Bit12000Ø4.0mmDrill Bit1Screw Head Sheath30Phillips Head Screws20 18 19 20 21 22 23Z119 24 25E195 x 410E195 x 350U074U195D193H074DOOR PARTQTYPART # 26 27 28 291122112SIZE (mm)410 x 1950350 x 1950740195019307401190ITEM 33 34 35 36 37 38 39 40 41NAMEDoor PanelDoor PanelDoor ChannelDoor ChannelDoor Square tubeDoor BarDoor Brace12BoltHingeBoltHinge410 x 1850 - 1800 30 31 321 L190185SideWall410 x 1900 - 18501 L195190SideWall410 x 1950 - 19001 L200195SideWall410 x 2000 - 19504 U155 15502U155Rear Wall Channel1550SideWall Channel8910111 R180185SideWall410 x 1800 - 18501 R185190SideWall410 x 1850 - 19001 R190195SideWall410 x 1900 - 19501 R195200SideWall410 x 1950 - 2000

5Trade Tested - GS504-V1 - 1.55x1.55 GARDEN SHED2a#W180 x 4Rear Wall PanelsiAll panels should overlap by one corrugation.#U155 x 2Rear Wall ChannelsibProfile ShapeAssemble the rear wall○ It is helpful to read andunderstand the full instructionmanual before starting.○ For additional helpful ReferenceImages see page 17 of thismanual.○ Select number of panels for rearwall and find flat level ground forassembly.○ Lay the panels out as shown withthe large riboverlappingthe small.○ Slide on the rear wall channels untilthe holes in the top of the channelalign with the peaks of the panels.The holes should be up, on theoutside face of the shed.○ Check that the panels arepushed hard into the channeland are perpendicular.Large RibSmall Rib
#U155
#W180#W180#W180#W180OutsideInside#W180 x 4
OutsideInsideAll pre-drilled holes should line up with the peaks ofthe panel. If this varies, squeeze together or stretchout the panels to make sure they align.
#U155

6Trade Tested - GS504-V1 - 1.55x1.55 GARDEN SHEDcTek ScrewsiStart with the thin peaks where panel overlaps occur,then move on to the middle of each panel.If needed, use a small wooden block behind themiddle of the panel for support while screwing.Make sure the block is not directly underneath thescrew.○ The tek screws provided are selfdrilling, there is no need to create apilot hole.○ Screw through the channel holesand through the overlapped panels.Make sure the screws go through alllayers.○ Do not add screws to the firstand last holes. Indicated withan X in diagram. These needto be left undone.○ Once finished, lay thewall flat out of the way.
Block behind
2Assemble the rear walla#L190185 x 1Side Wall PanelAssemble the side walls#U155 x 4Side Wall Channels#L185180 x 1Side Wall Panel#R185190 x 1Side Wall Panel#R180185 x 1Side Wall PanelProfile Shape
#R190195
#U155
#R185190
#U155○ Lay the side wallpanels out in heightorder as shown withthe large riboverlapping thesmall.○ Slide on the side wallchannels until theholes in the top of thechannel align with thepeaks of the panels.○ Check that thepanels are pushedhard into the channeland areperpendicular toedge.3#L195190 x 1Side Wall Panel#R190195 x 1Side Wall Panel#R195200 x 1Side Wall Panel#L200195 x 1Side Wall Panel
#R180185#L195190
#U155
#L190185
#U155
#L185180
XXXX
#R195200#L200195

7Trade Tested - GS504-V1 - 1.55x1.55 GARDEN SHEDbTek Screws○ Slide on the #U200 left door frameU channel to the preferred side forthe door.○ This can also be done when theback and side walls are all up andconnected before placing the frontwall.○ Screw through the channel holesand the overlapped panels. Makesure the screws go through alllayers. It is easier to begin with thebottom channel.○ The top of the panel is angled, thecover of the channels allows forslight differences in panel length.○ Do not add screws to the first andlast holes. Indicated with an X indiagram. These need to be leftundone.○ Once finished, lay thewalls flat out of the way.aAssemble the front wall○ Lay the front wall panels out asshown with the large rib overlappingthe small.○ Place the front wall #MR200channel over the #W200 wall panel.Have the pre-drilled holes in the#MR200 on the panel side.#U200 x 1Left Door FrameProfile Shape#W200 x 2Front Wall Panels#MR200 x 1Right Door FrameProfile Shape
#W200#W200#MR200
i43
#MR200#W200
Optional:○ The single door on this shed can be located on theleft, as instructed, or on the right. Keep this in mindwhen placing the #U200.Start with the thin peaks where panel overlaps occur,then move on to the middle of each panel.If needed, use a small wooden block behind themiddle of the panel for support while screwing.Assemble the side walls
#U200
XXXX
#U200 Alternative
XXXX

8Trade Tested - GS504-V1 - 1.55x1.55 GARDEN SHEDbTek Screwsc#U0745 x 1Door Bottom FrameProfile Shape#U155 x 2Front Wall Channels#Z0745 x 1Door Top FrameProfile Shape
#U155#U155#U0745#Z0745TOPBOTTOM
i○ Slide on the front wall channels,through the slot in the #MR200, untilthe holes in the top of the channelalign with the peaks of the panels.Overhang one side to form doorframe.○ Check that the panelsare pushed hard intothe channel and areperpendicular.○ Slide the #U0745 door bottom frameU channel under the bottom #U155U channel.○ Slide the #Z0745 door top frame Zchannel under the top #U155 Uchannel.○ The positions of these piecesdepend on whether the door openson left or right.○ Screw through the channel holesand through the overlapped panels.Make sure the screws go through alllayers.○ Screw through the channel holesand through the top and bottomdoor frames.○ Do not add screws to thefirst and last holes or at the#MR200. Indicated with anX in diagram. These need tobe left undone.○ Once finished, lay the wallflat out of the way.
#MR200
4Optional:○ The single door on this shed can be located on theleft, as instructed, or on the right. Keep this in mindwhen placing the #U0745 and #Z0745.All pre-drilled holes should line up with the peaks ofthe panel. If this varies, squeeze together or stretchout the panels to make sure they align.Do not add screws to the #MR200, it will need tobe adjusted later on.#Z0745UNDER#U155#U0745UNDER#U155XXXXXXFLUSH ENDS

9Trade Tested - GS504-V1 - 1.55x1.55 GARDEN SHEDa#P175 x 4Roof PanelsbAssemble the roof
#P175 x 4
#U155#U155
#U155 x 2Roof ChannelsProfile ShapeTek Screws○ Lay the panels out as shown withthe large rib overlapping the small.○ Slide on the roof channels until theholes in the top of the channel alignwith the peaks of the panels.○ Check that the panels are pushedhard into the channel and areperpendicular.○ Screw through the channel holesand through the overlapped panels.Make sure the screws go through alllayers.○ Do not add screws to the first andlast holes. Indicated with an X indiagram. These need to be leftundone.○ Once finished, lay the roof flat out ofthe way.i5All pre-drilled holes should line up with the peaks ofthe panel. If this varies, squeeze together or stretchout the panels to make sure they align.XXXX
Otros manuales para GS504-V1
1
Tabla de contenidos
Otros manuales de Almacenamiento al aire libre de tradetested
Manuales populares de Almacenamiento al aire libre de otras marcas

Lifetime
Lifetime 6418 Manual de usuario

rollaway container
rollaway container ARPCA24 Manual de usuario

Duratuf
Duratuf Havelock Manual de usuario

X-METAL
X-METAL 4065 Manual de usuario

Outdoor Life Products
Outdoor Life Products FP2030 F Manual de usuario

Royalcraft
Royalcraft Faro 295L Storage Box Manual de usuario














