4 Installation
4.1 Ensure the mains supply is switched off and the circuit supply fuses are removed
or the circuit breaker turned off.
4.2 Remove the front cover from the unit, by undoing the 4 x retaining screws.
4.3 Mark the position of the mounting holes on the wall using the wall plate as a
template, and drill the holes ensuring not to infringe with any gas/water pipes or
electrical cables that may be hidden below the surface. Insert the wall plugs
into the holes.
4.4 Select a suitable cable entry point(s). Remove the required break-offs from the bottom
edge or knock-outs from the rear to accommodate the cables (a mixture of rear
and bottom entries can be used if appropriate).
4.5 Pass the 230V 50Hz mains supply and load cables thought the cable entry point(s)
and prepare for termination. Allow sufficient excess cable to wire up the unit,
but not too much to make it difficult to close the cover.
4.6 Fix the unit to the wall using the correct screws for the wall plugs installed
4.7 Terminate the cables into the terminal blocks ensuring correct polarity is observed,
and that all bare conductors are sleeved (see section xxx .Connection).
If earth continuity is required, please use the earth terminals on the right hand side.
4.8 Restore mains to the unit after checking all system wiring is complete
and replacing the front cover.
Mains
connection
points
Multiple
mounting
holes
16x wiring
terminals
Cover retainer
screw holes
4x Earth
terminals
Cable
knock outs
Cable clampsCable entry/exit
points
TRT049N Inside View