
© The Stone Bake Oven Company 2014. All rights reserved.
Calsil
100
200
Oven base
1502 min
1202
3D Impression
NOT TO SCALE
Oven front base
Oven rear base RH
Front section 1st
LH rear 2nd
RH rear 3rd
Stage 9
Place the front oven base segment
down onto the calcium silicate
insulation board, make sure the oven
base is completely centralised and
exactly 200mm from the front of the
brick base.
Once the front base segment is
set in postion, place the rear base
segments against the front segment,
connecting them, ensure that
once you have connected the rear
segment to the front, that is hasnt
been knocked out of postition.
Once all three segments are in place,
measure again making sure they are
fully centralised and 200mm from the
front of the brick base and 100mm
from the back of the brick base.
Please refer to the postion diagrams
on the opposite page. It is improtant
to follow this step accurately, ensuring
the following brick courses have room
to be laid.
If there is any indescrepancy to the
base pieces, you can use sand to
bed them in and create a level nish.