Permitted fuel for this boiler is dry firewood with caloric value of at least 15 MJ/kg.
The heating chamber of the boiler is factory tested at test pressure of 4 bar.
Pay strict attention that boiler valves are always open while boiler in use.
Don’t forget to do a mechanical reset of the circulation pump in your system at start of every
heating season.
Clean the boiler on a regular base.
While the boiler is heating up, damp patches and drips may occur in the chimney area and in the
hearth. If the pressure in the installation is constant, this phenomenon represents condensation and not a
leak from the boiler. The reason for the condensation is a large temperature difference between the flow
circuit and the return circuit, and occurs as a consequence of the following errors:
•
If the power of the installed boiler exceeds the size of the installations,
•
The mixing valve for the protection of the cold part of the boiler has not been installed.
•
The boiler door or the ash pan are not correctly positioned (there is more air than necessary).
If the boiler leak is reported to the repair team and it is condensation, the team's visit will be
invoiced.
An expert should be entrusted for the planning and construction of the heating system.
In the case of an incorrectly planned system or the the incorrect installation of the system,
which can again lead to an incorrect operation of the boiler, the complete liability for the material
damage and new costs arising are to be covered by the person who was entrusted with the mounting of
the central heating system, and not by the boiler manufacturer, sales representative or seller.
Initial operation of the boiler is only to be performed by an authorized person (service). Please
contact your local seller.