TAIFUN GT III Manual de usuario

Taifun® GT II /GT II Air–Bedienungsanleitung
deutsch
User Manual
english
GT III
®

english Taifun® GT III –User Manual
2
IMPORTANT
Please read these instructions carefully, before using your
Taifun®GT III rebuildable tank atomizer.
Thank you for purchasing a Taifun® GT III. With this product you
have purchased a high quality rebuildable tank atomizer, which
has been designed exclusively for use with e-liquid. Before use it
is necessary to install a coil of resistance wire (e.g. NiCr wire)
and a suitable wick (e.g. cotton) according to the instructions of
this manual.
Furthermore, it is required to fill the atomizer with e-liquid after
coil setup. If you are having trouble making a suitable coil, or if
you have no previous experience with rebuildable atomizers,
please contact your supplier or www.smokerstore.de.
After the attachment of a new coil, the resistance should be
measured. To do this, use a multimeter or a suitable battery
device with resistance measurement. If a short circuit is
detected, the atomizer must never be put into operation. Short
circuits can cause damage to the battery device and/or
batteries. In this case, please correct the coil or make a new
coil.

Taifun® GT III –User Manual english
3
IMPORTANT
Please use only liquids which explicitly
are intended for use in e-cigarettes.
The Taifun® GT III is made of high quality materials and has
been thoroughly cleaned prior to delivery. Cleaning before use
is not necessary. Any visible residues are clean water and
glycerine used for pretreatment of o-rings.
If you want to clean the atomizer after longer use, a short rinse
of all parts under warm water is sufficient.
Please thoroughly dry all parts before assembling the atomizer
again. We also recommend that prior to assembly you moisten
the o-rings with a little liquid or glycerine. This increases the
durability of the o-rings and simplifies the assembly.
If an o-ring or an insulator is damaged, please replace it. The
necessary spare parts are partially included in delivery and can
be reordered via your supplier or www.smokerstore.de.

english Taifun® GT III –User Manual
4
Scope of delivery Taifun® GT III
1 x Rebuildable atomizer Taifun® GT III
1 x Info card for authenticity verification
1 x Drip Tip Taifun® GT III
1 x Sealing rings (spare parts)
1 x Giftbox
Specifications
Diameter: 23 mm
Length (without Drip Tip): 52,5 mm
Weight: approx. 82 g
Capacity: approx. 5 ml
Material: Stainless steel (1.4301),
Borosilicate glass,
PTFE (Polytetrafluorethylen)
PA (Polyamid)

Taifun® GT III –User Manual english
5
Attaching a coil
On the base there are 2 screws, which are used to fix the
wire (plus and minus pole).
The screws are slightly offset so that the wire can be easily
attached.
It is advisable to place the wire ends clockwise around the
screws and fix the coil by tightening the screws.
The coil should be located centrally above the air outlet and
should not touch the surrounding metal parts (risk of short
circuit).
The cotton is passed through the coil and into the side
pockets.
The side pockets should be completely covered with cotton
from the inside, but the cotton should not be plugged in.
Via the side openings (depending on the setting of the
Liquid Control) the liquid can get from the tank to the coil.
(see Coil Example, page 18)

english Taifun® GT III –User Manual
6
Liquid Control
The Liquid Control is adjusted by the Drip Tip. The Drip Tip
can be adjusted by 360 °.
The Liquid Control can be easily checked through the glass of
the tank.
Example: Liquid Control maximally opened.
(This picture without tank is only for illustration purposes)
Example: Liquid Control half opened.
(This picture without tank is only for illustration purposes)
Example: Liquid Control closed (for filling).
(This picture without tank is only for illustration purposes)

Taifun® GT III –User Manual english
7
Airflow Control
The adjustment of the airflow is supplied via the AFC ring
located on the underside of the base and has two differently
sized slots. There are eleven air holes under the AFC ring in
total.
While on the one side the holes 1,3,5,7 and 9 are located, the
holes 2,4,6,8,10 and 11 are placed on the opposite side.
Through the slots in the AFC ring you can now alternately
open or close another hole on each side.
You have the option either to adjust the air passage
between one and ten open air holes.
One of the holes is smaller and designed for a very reduced
airflow.

english Taifun® GT III –User Manual
8
Recucing the air channel
Optional available is a conical shaped PEEK tube
(3.35 x 3.55 x 6 mm) with an inside diameter of 2mm.
With this tube a very strong airflow can be achieved,
independent of air flow regulation. It also provides a direct
and stronger airflow direct to the coil, resulting in flavor
intensification.
It is recommended to use tweezers for insertion.
Important: When inserting the tube, make sure that the
narrow end is pushed into the opening first.
The tube should be pushed as completely as possible into
the deck. It should not come into contact with the coil later.

Taifun® GT III –User Manual english
9
Filling the tank
To fill the Taifun® GT III, first close the liquid control. Turn
the drip tip until the liquid control openings are completely
closed.
The liquid flow is now interrupted and you can unscrew the
top cap to fill the tank.
Important: The drip tip should be pulled up a little bit
before loosening the top cap, as otherwise the liquid
control could be adjusted further when loosening the top
cap.
After unscrewing the top cap, the liquid can be filled into
the tank via the side openings.
Important: After filling, the tank should be immediately
closed again with the top cap. The tank should only be
opened as short as necessary.

english Taifun® GT III –User Manual
10
Filling the tank (optional)
Since the supplied drip tip has two "teeth", which are
necessary for adjusting the liquid control, the liquid control
can not be adjusted with other drip tips and thus can not
be closed for filling.
In order to close the liquid control nevertheless for the
duration of the filling process, you have to unscrew the tank
a little. The liquid channels are displaced inside and are also
closed.
Nevertheless, the tank remains tight, as it is still sealed by
the built-in O-ring.
You can now unscrew the top cap as usual.
The tank is filled from above.
Important: After filling, the tank should be immediately
closed again with the top cap. The tank should only be
opened as short as necessary.
Tabla de contenidos
Otros manuales de Cigarrillo electrónico de TAIFUN
Manuales populares de Cigarrillo electrónico de otras marcas

STEAMAX
STEAMAX TFV8 X-BABY Manual de usuario

iQOS
iQOS 3 MULTI Manual de usuario

Vaporesso
Vaporesso LUXE XR MAX Manual de usuario

ZAZO
ZAZO PRO Mini 2 Manual de usuario

Aquafog
Aquafog Turbo XE Manual

Electronic Cigarettes Australia Pty Ltd
Electronic Cigarettes Australia Pty Ltd AUSSIE BLUE ENDURANCE Manual de usuario













