8 Installation and Operating Instructions (Original Instructions)
Light Wastewater Pump Type ABS MF 154 - 804.
Submersible Grinder Pump Type ABS Piranha 08 and 09
6 Maintenance
cBefore commencing any maintenance work the pump should be completely disconnected from the
mainsbyaqualiedpersonandcareshouldbetakenthatitcannotbeinadvertentlyswitchedback
on.
mWhen carrying out any repair or maintenance work, the safety regulations covering work in enclosed
areas of sewage installations, as well as good general technical pratices, should be followed.
cTo avoid danger if the power cable is damaged, it must be replaced by the manufacturer or its service
agentorasimilarlyqualiedperson.
Servicingmustonlybecarriedoutbyqualiedpersonnel.
NOTE Themaintenancehintsgivenherearenotdesignedfor“do-it-yourself”repairsas
specialtechnicalknowledgeisrequired.
NOTE AmaintenancecontractwithourServiceDepartmentwillguaranteeyouthebest
technicalserviceunderallcircumstances.
6.1 General maintenance hints
Sulzersubmersiblepumpsarereliablequalityproductseachbeingsubjectedtocarefulnalinspection.
Lubricated-for-life ball bearings together with monitoring devices ensure optimum pump reliability provided that
the pump has been connected and operated in accordance with the operating instructions.
Should, nevertheless, a malfunction occur, do not improvise but ask your Sulzer Customer Service department
for assistance.
This applies particularly if the pump is continually switched off by the current overload in the control panel or by
the alarm.
Regular inspection and care is recommended to ensure a long service life.
NOTE TheSulzerserviceorganisationwouldbepleasedtoadviseyouonanyapplications
youmayhaveandtoassistyouinsolvingyourpumpingproblems.
NOTE TheSulzerwarrantyconditionsareonlyvalidprovidedthatanyrepairworkhasbeen
carriedoutinSulzerapprovedworkshopandwhereoriginalSulzersparepartshave
been used.
6.2 Piranha shredding system
The shredding system of the Piranha is a wearing part and as such may need to be replaced. A reduction in
cutting performance can reduce output. We recommend that the shredding system be inspected regularly. This
is particularly so if sewage containing sand is being pumped. Regular inspection and care is recommended to
ensure a long service life.
ATTENTION Beforestartingthepumpensurethattheshreddingrotorcanrotatefreely.
6.3 Maintenance of lifting stations in accordance with EN 12056.
It is recommended that the lifting station be inspected monthly and its function checked.
InaccordancewithENregulationstheliftingstationshouldbemaintainedbyaqualiedpersonatthefollowing
intervals:
• in commercial premises every three months.
• in apartment blocks every six months.
• in a single family home once a year.
Inadditionwerecommendthatamaintenancecontractbetakenoutwithaqualiedcompany.