
PAGE 6 STUV 6 FREESTANDING | SPECIFICATIONS & MANUFACTURER INSTALLATION GUIDE
^
MINIMUM CLEARANCE – INTERNAL
3.1 Clearance from masonary wall
50mm minimum clearance is required from fully
masonary structure.
50
50
Masonary wall
Masonary wall
Glass (frameless or aluminium frame)
Glass (frameless or aluminium frame)
100mm
100mm
Combustible
Combustible
Combustible
Combustible
250mm
100
100
3.2 Clearance from glass
100mm minimum clearance is required from normal
non-combustible glass.
3.3 Clearance from combustible surfaces
(eg timber joist & concrete)
Clearances may be reduced with the application of
heat shielding to walls in accordance to the
Australian Building Code.
For information on heat shielding please contact our
IMPORTANT:
Frames must also be considered. Timber window
frames must be treated as combustible surfaces
(see 2.3). Aluminium frames can be treated as
non-combustible surfaces (see 2.2).
3. PRE-INSTALLATION
50
50
125mm
Masonary wall
Masonary wall
Glass (frameless or aluminium frame)
Glass (frameless or aluminium frame)
100mm
100mm
Combustible
Combustible
Combustible
Combustible
250mm
100
100
125mm
Masonary wall
Masonary wall
Glass (frameless or aluminium frame)
Glass (frameless or aluminium frame)
100mm
100mm
Combustible
Combustible
250mm
50
50
125mm
Masonary wall
Masonary wall
Glass (frameless or aluminium frame)
Glass (frameless or aluminium frame)
100mm
100mm
Combustible
Combustible
Combustible
Combustible
100
100
Configuration 1 – Parallel installation
Configuration 2 – Corner installation