
- 6 –
Cont ...
1 IMPORTANT FACTS: READ BEFORE COMMENCING PUMP INSTALLATION
A Water storage capacity.
1.11 The SPU Midi has a usable water volume of approximately 8 litres; the length
of time the SPU takes to pressurise a system will be dependent on:-
The pressure differential between the cold fill and set pressures and also the
refill rate of the tank
1.12 Ensure the pumps are primed as described in the priming section before
starting, to avoid causing damage to the pump shaft seal. See Section
6.26 Hydraulic commissioning.
B Water temperature
This unit is designed to pump cold water only which should not exceed the
following values:
1.13 The maximum allowable water temperature is 23 oC (see Technical Section).
1.14 The minimum allowable water temperature is 4 oC.
C Pipework – General
1.15 Do not drill holes or put fastenings into the SPU Midi tank, this will cause
leakage.
1.16 Secure pipework: Ensure pipework to and from pump is independently
supported & clipped to prevent forces being transferred to inlet and outlet
branches of the unit. Do not secure pipework to the SPU Midi, this will cause
damage and possible leakage.
1.17 Flux: Solder joints must be completed and flux residues removed prior to SPU
Midi installation (flux damage will void any warranty).
1.18 Pipework design: Care should be taken in the design of pipework runs to
minimize the risk of air locks e.g. use drawn bends rather than 90obends.
1.19 DO NOT introduce solder flux to flexible hose, tank, pump or any
parts manufactured from plastic.
1.20 DO NOT allow contact with oil or cellulose based paints, paint
thinners or strippers, acid based descalents or aggressive cleaning
agents.
1.21 DO NOT bend the flexible hose beyond 90o. It must be installed as
detailed, DO NOT kink. See Installation Section 4.15.
D Plumbing installation regulations
1.22 The plumbing installation must comply with the current water and building
regulations.
1.23 The plumbing installation must be installed by a qualified person.