Stone RP652 Guía

SERVICE/PARTS MANUAL
MODELS: RP652
REVERSIBLE PLATE
A 100% employee-owned American manufacturer
REVISION: B 6/01 P/N 56402


FOREWORD ................................................................................................................................... 4
LIMITED WARRANTY ................................................................................................................. 5
TECHNICAL DATA ....................................................................................................................... 7 - 10
Specifications .............................................................................................................................. 8 - 9
Noise and Vibration Data ............................................................................................................ 10
HEALTH & SAFETY ..................................................................................................................... 11 - 16
MAINTENANCE............................................................................................................................. 17 - 24
Maintenance and Repairs ............................................................................................................ 18
Testing ......................................................................................................................................... 18
General Notes.............................................................................................................................. 18 - 19
Maintenance Wor (Honda Engine) ........................................................................................... 19
Filling Up With Fuel ................................................................................................................... 19
Chec ing The Engine Oil Level.................................................................................................. 19
Cleaning The Air Filter Element .................................................................................................20
Cleaning The Machine ................................................................................................................ 20
Screw Connections...................................................................................................................... 20
Chec ing Rubber Buffer ............................................................................................................. 20
Chec ing The V-Belt ................................................................................................................... 20 - 21
Exciter: Oil Level/Oil Change .................................................................................................... 21
Filling and Bleeding The Circuit ................................................................................................ 21 - 22
Maintenance Schedule ................................................................................................................ 23
Lubrication Schedule .................................................................................................................. 24
Alternative Lube Oil Table ......................................................................................................... 24
EXPLODED VIEWS WITH PARTS ............................................................................................. 25 - 43
Hardware Key ............................................................................................................................. 27
Torque Charts and Information ................................................................................................... 28 - 29
Plate Assembly ............................................................................................................................ 30 - 31
Eccentric Assembly ..................................................................................................................... 32 - 33
Upper Dec Assembly ................................................................................................................ 34 - 35
Clutch Assembly ......................................................................................................................... 36 - 37
Handle Assembly ........................................................................................................................ 38 - 39
Control Assembly........................................................................................................................ 40 - 41
Decal Identification ..................................................................................................................... 42 - 43
CALIFORNIA PROPOSITION 65 WARNIN ........................................................................... 47
TABLE of CONTENTS RP652

- 4 -
These instructions include:
Safety regulations
Operating instructions
Maintenance instructions
These instructions have been prepared for
operation on the construction site and for the
maintenance engineer.
These instructions are intended to simplify operation
of the machine and to avoid malfunctions through
improper operation.
Observing the maintenance instructions will increase
the reliability and service life of the machine when
used on the construction site and reduce repair costs
and downtimes.
Always keep these instructions at the place of use
of the machine.
Only operate the machine as instructed and follow
these instructions.
Observe the safety regulations as well as the
guidelines of the civil engineering trade
association. Observe the safety rules for the
operation of road rollers and compactors and the
pertinent regulations for the prevention of
accidents.
Stone Construction Equipment Inc. is not liable for
the function of the machine when used in an improper
manner or for other than the intended purpose.
Operating errors improper maintenance and the use of
incorrect operating materials are not covered by the
warranty.
The above information does not extend the warranty
and liability conditions of business of Stone
Construction Equipment Inc.
Stone Construction Equipment Inc.
P.O. Box 150 Honeoye New York 14471
Phone: (800) 888-9926
Fax: (716) 229-2363
FOREWORD
Warranty Information
Please enter the following data. This will help
expedite any service or warranty wor .
1. Machine Type: _______________________
Machine S/N: ________________________
2. Engine Type: _________________________
Engine S/N: __________________________
3. VIN: _______________________________
4. Purchase Date: _______________________
5. Dealer/Distributor Information:
Name: ______________________________
Address: ____________________________
____________________________________
Phone #: ____________________________
Fax #: ______________________________
Location of above information:
1. Information on S/N tag.
2. Information on engine tag.
3. Information on S/N tag - if applicable.
4. Date you purchased machine.
5. Dealer machine was purchased from.

- 5 -
L i m i t e d W a r r a n t y
The Manufacturer warrants that products manufactured shall be free from defects in material and
workmanship that develop under normal use for a period of 90 days for concrete vibrators and electric
pumps, one year for Rhino®, Bulldog®, Wolfpac Rollers, trowels, Stompers®, saws, forward plates,
engine powered pumps, and 6 months for all other products from the date of shipment. The foregoing
shall be the exclusive remedy of the buyer and the exclusive liability of the Manufacturer. Our warranty
excludes normal replaceable wear items, i.e. gaskets, wear plates, seals, O-rings, V-belts, drive chains,
clutches, etc. Any equipment, part or product which is furnished by the Manufacturer but manufactured by
another, bears only thewarrantygivenbysuchothermanufacturer. (TheManufacturerextends the warranty
period to “Lifetime” for the drum bearings and seals for the mortar mixers, and agrees to furnish, free of
charge, the bearings and seals only upon receipt of the defective parts. The warranty is two years for
eccentric bearings on the forward plate compactors, mortar and plaster mixer drums, trowel gearboxes
andfiveyearsontheBulldogtrenchrollereccentricbearings.) A WarrantyEvaluation Formmustaccompany
all defective parts. Warranty is voided by product abuse, alterations, and use of equipment in applications
for which it was not intended, use of non-manufacturer parts, or failure to follow documented service
instructions. Theforegoing warranty is exclusiveof all other warrantieswhetherwritten or oral, expressed
or implied. No warranty of merchantability or fitness for a particular purpose shall apply. The agents,
dealerandemployeesofManufacturerarenot authorized to makemodificationtothiswarranty, or additional
warranties binding on Manufacturer. Therefore, additional statements, whether oral or written, do not
constitute warranty and should not be relied upon.
TheManufacturer’ssole responsibility for any breach of the foregoing provision of this contract, with respect
toany product or part notconforming to the Warrantyorthedescriptionhereincontained, is at its option(a)
to repair, replace or refund such product or parts upon the prepaid return thereof to location designated
specifically by the Manufacturer. Product returns not shipped prepaid or on an economical transportation
basis will be refused (b) as an alternative to the foregoing modes of settlement - the Manufacturer’s dealer
to repair defective units with reimbursement for expenses, except labor, and be reviewed with the
Manufacturer prior to repair. AWarranty Evaluation Form must accompany all warranty claims.
Except as set forth hereinabove and without limitation of the above, there are no warranties or other
affirmations which extends beyond the description of the products and the fact hereof, or as to operational
efficiency, product reliability or maintainability or compatibility with products furnished by others. In no
event whether as a result of breach of contract or warranty or alleged negligence, shall the Manufacturer
beliable for special orconsequentialdamages including but notlimited to: Loss ofprofits or revenues, loss
of use of the product or any associated product, cost of capital, cost of substitute products, facilities or
services or claims of customers.
Noclaimwill be allowed for productslostor damaged in transit. Such claimsshouldbe filed with the carrier
within fifteen days.
EffectiveApril 1, 1998.
4/98 P/N 51018
Stone Construction Equipment, Inc.
32 East Main Street, P. O. Box 150
Honeoye, NY 14471-0150
Phone: 1-800-888-9926 • 1-716-229-5141
Fax: 1-716-229-2363
Bred Tough. Technology Born To Work.
The Way It Ought To Be.


- 7 -
TECHNICAL DATA

- 8 -
TECHNICAL DATA
H
2
H
1
H
L2
L1
L
RP652

- 9 -
Stone RP652 – Specifications
Dimensions in in / mm
Length L
Length L1
Length L2
Height H
Height H1
Height H2
Width basic unit l
Width basic unit ll
Weights in lbs / kg
Basic unit l
Basic unit ll
Drive
Engine Type
Type of Construction
Performance HP / W
At Revolutions (min -1)
Cooling
Fuel Consumption (g/h / l/h)
Max. Gradient
Max. Gradeability
Drive
Control Fwd/Rvs
Operating Speed in ft/min / m/min
Basic unit l
Basic unit ll
Vibration
Centrifugal Force (lbs / N)
Vibration Frequency (vpm / Hz)
Amplitude (in / mm)
Maximum Performance in sq/ft/hr / m2/hr
Basic unit l
Basic Unit ll
Filling Quantities in gal / l
Fuel
Optional Extras
Vul ollan Plate
RP652
44.88 in / 1140 mm
27.56 in / 700 mm
12.99 in / 330 mm
29.13 in / 740 mm
40.16 in / 1020 mm
46.46 in / 1180 mm
19.69 in / 500 mm
27.56 in / 700 mm
407.9 lbs / 185 g
429.9 lbs / 195 g
Honda GX270
1 cyl. 4-stro e-gasoline
9.0 HP / 6.6 W
3600
Air
.55 g/h / 2.1 l/h
20º
35%
via centrifugal clutch
and v-belt
hydraulic
0 - 72 ft/min / 0 - 22 m/min
0 - 62 ft/min / 0 - 19 m/min
6519 lbs / 29 N
5700 vpm / 95 Hz
.047 in / 1.2 mm
7101 sq/ft/hr / 660 m2/hr
8606 sq/ft/hr / 800 m2/hr
1.58 gal / 6.0 l
X

- 10 -
TECHNICAL DATA
RP652
the sound pressure
level at the operator
place LPA
92,3 dB(A)
the sound power level
LWA
109,3 dB(A)
NOISE AND VIBRATION DATA
The following listed noise and vibration data according to the EC machine directive in the version (91/368/
EEC) was determined at the rated speed of the drive motor with vibration with the machine placed on a
resilient base.
Values can deviate in normal use depending on the conditions prevailing at the place of use.
NOISE DATA
The noise emission specified in appendix 1, subclause 1.7.4.f of the EC machine directive for
These noise levels were measured according to ISO 3744 for the sound power level (LWA ) and ISO 6081 for
the sound pressure level (LPA ) at the operator wor place.
Since the permissible noise rating level of 89 dB(A) can be exceeded with this machine, the
operator must wear suitable hearing protection.
VIBRATION DATA
Hand-arm vibration values according to appendix 1, subclause 3.6.3.a of the EC machine directive.
The weighted effective value of acceleration, determination according to ISO 8662, part 1, is about 10 m/s2.
Noise & Vibration Data / Torque Information
Tabla de contenidos
Otros manuales de Herramientas eléctricas de Stone



















