
For NATIONWIDE SERVICE CALL 1(800)225-9293 6
INSTALLATION AND SET-UP
After removing the 0100 Sledgehammer from its packaging, be sure that all paperwork and any loose items that
may have been shipped with the 0100 Sledgehammer have been removed from the packaging as well. Please
note that all packaging should be retained by the customer for (30) days from the time of receipt. In the
event that this unit needs to be returned for replacement or repair, this packaging will be required to do so.
Should the packaging have been discarded before the (30) day requested period, packaging costs will be
incurred by the customer.
1) Place the 0100 Sledgehammer on a strong and sturdy surface. Such as a work table or SEM’s Optional
Heavy Duty Stand.
Note: if your table is to light, the table may tip over while trying to operate the model 0100
Sledgehammer. Table may need to be anchored to floor or wall as well.
2) Bolt down the model 0100 sledgehammer to your work table down with the supplied hardware (2) 3/8-16 x
4” bolts, (4) 3/8 x 2” fender washers, and (2) 3/8-16 nylon-insert locknut.
Note: If you are using a work table you will need to drill holes in the work table to match the predrilled
holes in the unit. The optional heavy duty stand already has the mounting holes predrilled.
Also (1) bolt with (2) washers and (1) locknut in two places
Tools required: 9/16 Wrench and Socket Wrench with 9/16 Deep Socket
IMPORTANT: The model 0100 Sledgehammer must be bolted down on a work table or SEM’s Option Heavy
Duty Stand. DO NOT OPERATE THE 0100 SLEDGEHAMMER if unit is not bolted down!
3) Before handle gets inserted, place a hard drive under anvil. The handle insert hole should be at
approximately 45° as shown in picture below.