Rima RS26G Manual de usuario

RS PORTABLE SAWMILL
2019
RS26G/31G
WARNING:
Read carefully and understand all ASSEMBLY AND OPERATION INSTRUCTIONS before operating.
Failure to follow the safety rules and other basic safety precautions may result in serious personal injury.

Page 10 of 49
SAWMILL ASSEMBLY
1. UNPACKING
Unpack the contents of the crate except for the sawmill head and the two long boxes in the bottom
that contain the two sections of track. Unbolt the front of the crate and lay 6” (150mm) high support
blocks in front of the crate. Bend the front of the crate down. Carefully lay the sawmill head and the
cardboard down onto the 6” (150mm) support blocks. Slide the sawmill head out of the crate as
shown below.
The two long track boxes may now be removed from the crate and the crate be placed out of the way.

Page 11 of 49
2. TRACKS
Assemble the track system with the provided nuts & bolts. It is important to assemble and level the
track on a firm foundation before tightening all of the nuts and bolts. It is ideal to assemble the tracks
on a solid and level footing that is a minimum of 4” (100mm) off of the ground. This will allow for easy
cleanup of sawdust from under the tracks and height adjustment of the log supports.
The width of the track should be assembled so that it is 31.0” (800mm) -35.0”(900mm) wide when
measuring the width from the outside to outside of the “L” rails.

Page 12 of 49
90 degrees
The pictures below show the assembly of the log bunks to the “L” rails. Ensure that the two end
bunks are square (90 degrees) to the track ‘L’ rails.
Assemble carriage stops at the ends of the tracks (4 stops total) and tighten bolts as shown below.

Page 13 of 49
3. LOG DOG & SUPPORTS
Assemble log dog pieces using the pieces shown below.
Attach log dog assembly to track as shown below with the 2 M8x20mm bolts and nuts provided.
Note that there are various locations along the track where this assembly can be bolted. Depending
on how many track sections are being used, select a log clamp position that will secure the log firmly
against the log supports.

Page 14 of 49
Insert log supports into track cross supports and secure with “T” handles as shown in the picture
below. The “T” handle threads should be coated with grease. The sawmill includes two sets of log
supports –a short set and a long set. The longer set is ideal for larger logs and the shorter set is
ideal for small logs and square cants.

Page 15 of 49
Note:
a. After assembly, the center to center distance of the guide must be between 889-901mm.
b. Adjust the nut on the footing (10) so that the upper plane of the guide rail is on the same
horizontal plane and the front and rear errors are within 2mm.
c. The wood clamping device (3,4,5,6,7) is placed in two positions in the middle of the track.
d. After adjustment, lock the nuts to make the whole guide rail parts fixed.

Page 16 of 49
4. SAWMILL HEAD ASSEMBLY
a. Place the support plate (46) horizontally and insert the two columns (47) into the appropriate position of 46.
Fix the bolts and nuts (48-1), then fix them (48-2), and then insert the steel wheel (78) into the bolts (48-2) to remove
the nuts and tighten them..
b. Place the saw head flat and insert the (46,47) assembly.
Insert the (80-1,80-2) rear post into the (46) proper hole position and fix it with four (41) bolts
c. Take 2 pieces of (51) wheel frame and 2 pieces of (52) regulating wheel and 2 pieces of (53) regulating
wheel guard plate and insert them into 2 pieces of (54) screws for fixing,
and then install the other end in the same way
b. Install the installed wheel rack left and right in the holes of the column (47)
and (80-1*80-2) and fix them with (54) bolts and nuts
c. Take (40) rear guard plate and fix 3 pieces of (41-1) bolts on the rear guard plate respectively
d. Take (43) assembly, take (41-2) screw installed in (80-2) hole, and then take (41-3 screw fixed in (40) center hole
tighten
e. Then connect the wire rope (82-1) and (82-2) and adjust the saw blade level.
f. Install the water tank rack, take (50) and (81) bolts and fix them on (80-1). Put the water tank in (50) and connect it
with 30 with a water pipe
g. Handle connection. The (55.56.57) assembly is held in place (80-2) with two (58) clips and connected to the throttle
stay (83).
h. Ruler installation. Take the ruler (35) and fix it on the back guard of the saw wheel with (84).
i. Take the ruler base (36), fix it on (46) with two (84) bolts and adjust the clearance with the ruler before tightening it.
j. Check the screws on each part and tighten them one by one.

Page 17 of 49
With the saw head resting about 6” (150mm) above the ground. Slide the 2 front posts into the slots
as shown below.
Using 4 of the M12 x 70mm bolts, washers and lock nuts, attach the saw head carriage plate
assembly to the bottom of the posts. Be sure the carriage wheels are located to the inside. Fully
tighten these 4 bolts so the plates are firmly attached to the posts. The posts should be pushed all
the way up until the carriage plates contact the sawmill head.

Page 18 of 49
With the help of another person, stand the saw head to its upright position.
Attach the back handle between the plates using 2 of the M12 x 70mm bolts per side. Do not fully
tighten these bolts at this time.
Este manual sirve para los siguientes modelos
1
Tabla de contenidos

















