
Assembly
If you have any questions on installation please e-mail customer service at customerservice@rjaquatics.com
for help.
Safety Precautions:
1. Do not plug any tank accessories into
outlet until setup is completed.
2. Inspect the aquarium prior to
installation to make sure it is free of
damage.
Light Assembly:
1. Remove LED lights from bo and follow
instructions below for assembly.
et/Dry Filter Installation
1. Remove filter chamber cover and insert
bio balls evenly into both
chambers.
2. Replace filter chamber cover and place
filter sponge over top of chamber
cover.
3. Attach clear return tube to top of each
pump and insert pumps into return
chamber.
4. Attach other end of each clear return
tube to each return nozzle.
Filling & Startup
1. Make sure cabinet is on a flat
level surface prior to filling with
water. (do not fill with water if
you do not have a level surface)
2. Add any sand, other substrate
and decorations to bottom of
tank.
3. Once level, fill aquarium with
water until the center chamber
where pumps are located of the
wet/dry filter section is about 3
inches above the top of the
pumps.
4. Plug in pumps and carefully
watch the water level. The
center chamber containing the
pumps should always be at
least 2 to 3 inches above the
top of the pumps. If you see air
bubbles blowing into tank you
will need to add water to bring
the center chamber water level
up to normal. (average tank will
need more water about every 2
to 3 days)