Pro-tec Promix A40 Manual de usuario

PROTEC®Medizintechnik GmbH & Co. KG
Lichtenberger Strasse 35, D-71720 Oberstenfeld, Germany
Machine No.:
Type:
Installation Date:
Status: June 2004/3.0
Subject to change
English
Automatic Mixer
Operating Instructions

2PROMIX A40®
EU-Declaration of Conformity ®
EU-Declaration of Conformity
PROTEC®Medizintechnik declares, that the product
Description: PROMIX A40®
Machine type: Automatic Mixer
Model no. 1180-1-0000, 1180-2-0000
conforms to the following harmonized standards:
Safety: EN 61010-1 (VDE 0411 Part 1, 03/1994); DIN 1988 T4,12/1988
EMC: EN 50081 Part 1, 03/1993; EN 50082 Part 1, 03/1993
according to the regulations of:
• the Medical Device Directive 93/42/EEC “Class 1”,
• the Low Voltage Directive 73/23/EEC and the
• EMC Directive 89/336/EG
PROTEC®Medizintechnik GmbH & Co. KG, Lichtenberger Strasse 35, D-71720 Oberstenfeld, Germany
Place and date of issue:
Oberstenfeld, 12th January, 1999 Jochen Krupp (Technical Manager Analog Systems)

PROMIX A40®3
Table of Contents ®
English
Introduction .......................................................................................................... 3
Technical Specifications ..................................................................................... 4
Safety Instructions............................................................................................... 5
Installation ............................................................................................................ 6
Operation .............................................................................................................. 8
Bottle Opener ..................................................................................................... 11
Cleaning and Maintenance................................................................................ 12
Advice on Unit Errors ........................................................................................ 13
Service Manual as appendix, see page
Changing the Mixing Volume / Setting the Mixing Times .............................. 14
Trouble Shooting ............................................................................................... 14
Connection Diagram .......................................................................................... 15
Spare Parts ......................................................................................................... 16
Electric Diagrams............................................................................................... 18
Copyright
© 2004 by PROTEC®Medizintechnik. All rights reserved. Any reproduction that vi-
olates the limitations set forth by copyright law, needs to be authorised in writing by
PROTEC®Medizintechnik.
Information on Liability
This manual has been checked for correctness. The instructions and specifications
were correct at the time it was published. Future automatic mixers may have mod-
ifications without prior notice. PROTEC®Medizintechnik does not take responsibil-
ity for damage caused directly or indirectly by error, omission or non-conformity of
the manual.
Introduction
The PROMIX A40®is a fully automatic chemical mixing machine for preparing de-
veloper and fixer bath chemicals of either powder form or liquid concentrates. All
stages are guided and controlled by means of a microprocessor. Thanks to a large
reserve tank, up to three machines can be connected and continue to operate, with-
out having to interrupt the working process even during refilling.
Due to its patented design, the PROMIX A40®is easy to operate, reliable, fast and
virtually service free. The robust magnetic circulation pumps are resistant to crys-
talisation and pollution and ensure fast and throrough mixing of the chemicals.
The PROMIX A40®replaces the usual regenerator tanks in the darkroom.
These Operating Instructions contain important instructions for installation, opera-
tion and servicing of the machine. Please read the provided information carefully to
ensure reliable and satisfactory operation of your PROMIX A40®.

4PROMIX A40®
Technical Specifications ®
Technical Specifications
Tank volume: each 40 litre maximum
Mixing volume 20, 25, 30 or 40 litres can be
adjusted by setting of float switches.
Reserve tank: each 13 litres
Mixing times: variable, 2, 3, 5, 10, 15, 20, 25, 30 minutes
Pump capacity: 38 l/min
Water connection: Admissible water pressure: 2-10 bar (29-145 psi),
Admissible water temperature: 5-30 °C (41-86 °F)
Water intake: 9 litres per minute and tank
Noise level: Less than 55 dB(A)
Environmental condi-
tions:
1) Temperature 5-40 °C (41-104 °F), ventilated
room,
2) Relative humidity lower than 80 % up to 31 °C,
linearly decreasing to 50 % at 40 °C.
3) Height above sea level less than 2000 m
(6666 ft).
4) Indoor use
Pollution degree: 2
System protection: IP 20
Electrical connections: Electrical specifications are indicated on the model
nameplate.
Type 1180-1-0000: 220-240 V~, 1.1 A, 50 Hz.
Type 1180-2-0000: 220-240 V~, 1.1 A, 60 Hz.
Device acc. to IEC 1010 (EN 61010, VDE 0411)
overvoltage category II,
fuse protection: sb 2 A / 250 V
Power consumption: 0.3 kWh
Weight (unit): 28 kg (61.7 lb) empty,
108 kg (238.1 lb) filled
Dimensions (LxWxH): height = 93 cm (36.6 '')
width = 65 cm (25.6 '')
depth = 44 cm (17.3 '')
Floor space required: 0.29 m2(3.1 sqft)

PROMIX A40®5
Safety Instructions ®
English
Safety Instructions
To ensure safe operation of the mixer, installation and use should always con-
form to the instructions contained in this manual.
Prevention of water overflow damages: When the machine cannot be super-
vised, the water supply tap should be shut off.
The developer and fixer chemicals used in the processor should be handled
according to the manufacturers instructions. In general: Undiluted chemicals are
caustic. For this reason, avoid skin contact and wear suitable equipment for per-
sonal protection, such as safety glasses and gloves when handling chemicals. If
chemicals have come in your eyes, rinse the eyes immediately with cold, running
water for approximately 15 minutes and contact a medical doctor afterwards.
Inhalation of chemicals can be dangerous to your health and should be avoided.
For this reason, always ensure that the room in which the processor is installed is
adequately ventilated.
Environmental regulations regarding the storage and disposal of waste chemi-
cals should be obtained from the local water authorities and complied with.
Before opening the unit, switch off the unit and unplug it from the electrical
socket. Service and repairs must be performed by trained service technicians
only. Use only manufacturer´s replacement parts.

6PROMIX A40®
Installation ®
Installation
1. Requirements for Installation
a. Fresh water connection: Shut-off tap, thread with 3/4" outside diameter (wash-
ing machine connection), Water pressure 2 - 10 bar (29 - 145 psi).
b. Drainage connection: Plastic tube - inner diameter 50 mm (2”) or larger. Maxi-
mum drainage rate 18 l/min.
Regulations for wastewater treatment by local authorities must be observed.
c. Electrical connection: Fused socket with earth connection 220 - 240 V, 50 or
60 Hz, 2 A. It is recommended to install a control switch and fault current cir-
cuit breaker with 25 A / 30 mA rated fault current between power socket and
power cord.
2. Set-Up
a. Unpack the unit and transport it to the installation site.
b. Connect the water supply hose (gray) to the prepared 3/4" shut-off tap.
c. Connect the processor´s replenishment connections to the replenishment
hoses. Pay attention to the colours: red = developer (left tank), blue = fixer
(right tank).
d. Connect the overflow hoses to the prepared drain siphon. Do not bend or kink
the hoses. Fasten the hoses using the cable ties supplied. The local regula-
tions for drainage of wastewater must be observed.
e. After the mixer has been installed, a technician should check the function of
the water-stop switch. To do so, open the water tap and switch the mixer on.
As the water flows into the mixer, lift up the top float switch with your hands.
When you lift it to the upper position, the float switch must shut off the water
supply. Check this on both mixing tanks.
Electrical connections should be carried out according to reg-
ulations by an electrician.
Important!
To avoid damaging the connection fitting, fasten the replen-
ishment hoses at the underside of the mixer using the cable
ties supplied (see sketch).

PROMIX A40®7
Installation ®
English
PROmixA40
Controller section
Operation of the unit
Power switch
and fuse
Water connection
Hand-held hose
for manual pumping.
Important! Keep the
shut-off tap closed (see
page 9).
Emergency
overflow
Replenishment hoses
connect to
replenishment
connections at the
processor.
Cover flap
with funnel that can be taken out
Power connection
Developer
mixing tank Fixer
mixing tank
Developer
reserve tank Fixer
reserve tank
Please note that the buttons for operation, the hand-held hoses
and the covers of the mixing tanks are colour-coded.
RED = developer (left mixing tank)
BLUE = fixer (right mixing tank)

8PROMIX A40®
Operation ®
Operation
Preparing the Chemicals
When the mixing tank is empty, chemicals can be prepared.
1. Open the water supply tap and close the shut-off taps on the hand-held
hoses.
2. Switch the unit on at the power switch. The mixer now automatically fills with
water. A beeping sound occurs at an interval and the display Water supply (1)
flashes.
3. When the mixer has filled up to half full, the water supply stops for a moment.
(At the end of the mixing process, more water will be filled in, therefore leave
the tap open.)
4. The display Add chemicals (2) flashes and a continuous beep is heard. Open
the cover flap and fill the powder or liquid concentrate into the respective mix-
ing tank; observe the manufacturer´s instructions.
Water supply
Display flashing: open tap or leave it open.
Add chemicals
Display flashing: add chemicals to the respective mixing tank.
Mix
Button starts the mixing process after chemicals have been added.
Mixing completed / Stand-By
Display on: Mixing process is complete, close water tap.
Pump On/Off
Button for manual pumping of chemicals.
Important!
Do not switch the unit off during the mixing cycle. This could
result in partially mixed chemicals flowing into the reserve
tank. Prepare fresh chemicals only when the mixing tank is
empty. Prepare chemicals in the correct tank!
Display and buttons for the developer mixing
tank (red)
Display and buttons for the fixer mixing tank
(blue)
Developer: Fixer:
1
2
3
4
5

PROMIX A40®9
Operation ®
English
5. After filling in all the components of the chemicals, press the Mix button (3) to
start the mixing process. The Mix display is on during mixing.
6. After the initial mixing phase, more water is added until the final level is
reached (20, 25, 30 or 40 l). The second mixing cycle completes the mixing
process. The Mixing completed display (4) indicates that mixing is complete
and the unit has changed to stand-by mode. Close the water supply tap now.
The ready mixed chemicals now flow into the reserve tank. This can be seen
by the dropping liquid level in the mixing tank.
Stand-By Mode
In stand-by mode the mixer monitors the filling level of the chemicals. When the
chemicals in the mixing tank have been depleted (reserve tank is still full), an inter-
val sound is heard and the Water supply display (1) flashes. Open the water supply
tap and start preparing the chemicals as described above.
Manual Pumping Off / Mixing
To fill the processor, e. g. when new chemicals have been prepared, the chemicals
can be pumped out of the mixer manually, using the hand-held hoses. To do so,
switch the pump on with the Pump On/Off button (5). To pump out chemicals, open
the shut-off tap on the hand-held hose. Upon completion, be sure to close the shut-
off tap on the hand-held hose and switch off the pump.
This function can also be used to start an additional mixing process manually, e. g.
when hardener or additives are added. Keep the shut-off tap on the hand-held hose
closed. Switch the pump on. The mixing process automatically stops after 15 min-
utes, but can be stopped at any time before by pressing the Pump On/Off button(5).
Important!
Keep the cover flaps of the mixer closed at all times to prevent
the chemicals from oxidizing or crystallizing. This will also
prevent unpleasant odours from the chemicals.
Important!
The shut-off tap on the hand-held hose must always be closed,
unless you are just pumping out chemicals. If the shut-off tap
is open during the mixing process, chemicals will escape!
Important!
Do not shift the PROMIX A40®when it is filled!
Handle all connections with care to prevent damage.
Attention!
The distance between the PROMIX A40®and an undeveloped
X-ray film must be sufficient, because the LED of the display
can otherwise cause exposure of the film.

10 PROMIX A40®
Operation ®
Setting the Mixing Time
The mixing time is set using the operating elements.
To change the mixing time, proceed as follows:
1. Switch the unit off.
2. Press one of the two buttons Mixing (developer or fixer) and while keeping it
pressed switch the unit on.
3. The respective LED´s light up to indicate the set mixing time.
4. By pressing the Mixing button repeatedly, change the mixing time. The adjust-
able mixing times are selected one after the other: 2, 3, 5, 10, 15, 20, 25 or 30
minutes. The number of LEDs that are on, correspond to the mixing time (see
sketch).
The set mixing time applies to the developer and fixer mixing processes.
Only change the mixing time when the OK display is on or the mixing tank is empty,
that is, by no means after fresh water for a new mixing process has already been
filled in. While settings are made, the solenoid valve and pump are shut off. There-
fore, do not change the mixing time while the mixer fills with water or during the mix-
ing process, as this could dilute the chemicals in the reserve tank.
2 min.
3 min.
5 min.
10 min.
15 min.
20 min.
25 min.
30 min.
Tabla de contenidos