
2-9 Reserve Power Supply Connections 2-29
2-10 Expansion Battery Unit Connections 2-30
2-11 P10 Cable Terminations and Designations 2-35
2-12 Cabinet Top Assembly 2-38
2-13 Cooling Unit Location and Connections 2-39
2-14 QBL15 Battery Distribution Box 2-45
2-15 Reserve Power Connections Outside Cabinet 2-46
2-16 Battery Sensing and Monitoring Connections 2-47
2-17 Local-To-Remote Cross-Connections 2-48
Charts
2-1 QCA144 RPE Cabinet Installation 2-4
2-2 QSD66 or QSD69 Expansion Shelf Installation 2-17
2-3 QBL24 Battery Unit Installation (Main Unit) 2-23
2-4 Expansion QBL24 Battery Unit Installation 2-26
2-5 QUA6 Power Fail Transfer Unit (PFTU) Installation 2-31
2-6 Alarm and Transfer Wiring (P10) Installation 2-32
2-7 QPC705 Power Converter Installation 2-36
2-8 QUD24 Fan Unit Installation 2-37
2-9 QCAD321 Junction Box Assembly Installation 2-40
2-10 QBL15 Battery Distribution Box Installation 2-44
Tables
2-A Peripheral Equipment Cable Terminating Sequence 2-15
2-B PFJ1 Emergency Transfer Cable Cross-connections 2-34
2-C Cable C Designations (Receive) Local and Remote 2-49
2-D Cable D Designations (Transmit) Local and Remote 2-50
Reason For Reissue: This Practice is reissued to include
additional information about cross-connections, to remove
references to rectifiers other than the QRF12 -48 V rectifier supplied
with the system and to make other minor changes. Changes are
indicated by a vertical bar in the margin next to the affected item.
iv Contents
Appendix 1 to 553-2601-200