
FLOW
OPEN
12” FLOW12”
FLOW
CONNECT
CONNECT
MACHINE
F
I
G H
Installation Guide
1.
1. TURN ON the water supply and KEEP OPEN the sample port valve
the sample port as water will be exiting.
2. CLOSE the sample port valve after purging the air out.
3. DISINFECT the lines downstream of the DSU-D (or SSU-D) as per
standard clinic procedures before putting the dialysis machine to use.
1. CONNECT quick connector to a new tubing line.
2. CONNECT a sample port approximately 12” away from the quick
connector.
3. CONNECT a check valve approximately 12” from the sample port.
4. CONNECT the other end of the check valve to the new tubing line
made in a previous step that’s feeding into the dialysis machine.
5.
1. CONNECT the water line from wall box or RO outlet with the quick
2. CONNECT the quick connector on the new tubing made in the
www.nephros.com | 2Nephros, Inc.
50-3015 r.541 Grand Avenue, River Edge, NJ 07661, USA • 201-343-5202