NC ENGINEERING SW1.5 Instrucciones de montaje

1
SW1.5 Site Dumper
SW1.5 Site DumperSW1.5 Site Dumper
SW1.5 Site Dumper
OPERATORS
OPERATORS OPERATORS
OPERATORS
INSTRUCTION
INSTRUCTION INSTRUCTION
INSTRUCTION
MANUAL
MANUALMANUAL
MANUAL
NC ENGINEERING (HAMILTONSBAWN) LTD
2 Killyrudden Road, Hamiltonsbawn, Co Armagh, BT61 9S
Tel: 028 38871970 ax: 028 38870362
email: [email protected]om www.nc-engineering.com
REVISION
ORGINAL INSTRUCTIONS

2

3
Dear Customer
Even if you have operated this type of equipment before, it is
very important that your new equipment operations and
instructions are explained to you by a Dealer Representative
following delivery of your equipment.
This will explain the operating controls and enable you to
gain maximum productivity from your new dumper.

4

5
Pre Handover Check List
Return form to
NC ENGINEERING (HAMILTONSBAWN) LTD
2 Killyrudden Road
Hamiltonsbawn
Co Armagh BT61 9S
Delivery on this machine has been completed, including the following items.
Tick check box when each item is completed.
1. Operator Handbook delivered with equipment and operator controls and
warning labels explained to user
2. Maintenance Handbook, service intervals, fluid level checks and adjustments
explained to user.
3. Parts book and information explained (Parts book can be purchased through
dealer)
4. All items on delivery checklist have been completed
Operators signature: …………………………………………
Signature on behalf of Dealer: ……………………………...
DISTRIBUTOR/DEALER:………………
E UIPMENT MODEL: …………………
E UIPMENT SERIAL No:………………
HOURMETER READING: ………………
DELIVERY DATE: ……………………….
TODAYS DATE: ………………………….
Customer Name (Please Print): ………………………………………………………………
Address: ………………………………………………………………………………………
…………………………………………………………………………………………………
Postcode: …………………… Country:…………………………. Tel: ……………………...
Delivery Checklist
(Continued on reverse side)
Complete this form with the user / customer and return it to NC
At Dealership
Make sure any necessary field service instructions have been completed
Make sure all necessary certificates and literature are available
All decals are fitted

6
At Delivery Point with Customer
Explain parts book
Explain all warning labels on equipment
Show location of all serial numbers on equipment
Lubrication & Maintenance
Explain maintenance requirements, fuel & lubricant specifications
Instruct how to use service schedules of maintenance handbook
Show all lubrication points on the equipment
Fluid Levels
Instruct how to measure all fluid levels and fill procedures
uel
Hydraulic Tank
Engine oil
Transmission / Power train
Coolant (inspect with engine stopped & cool)
Show Location of All Filters
Hydraulics system
Engine oil
uel system
Engine air
Water and Sedimentor Drains
uel water separator
uel tank drain bung
Hydraulic tank drain bung
Operation & Demonstration
Review operator handbook
Starting stopping operations
Direction change controls
Accelerator & braking controls
Warning devices (i.e. horn/ beacon)
Hydraulics controls
Legislation Awareness
Ensure the user is aware of the appropriate local, national, and international Health &
Safety Legislation for the equipment being operated
DEALER STAMP:

7
Contents
Page No.
Declaration of Conformity
9
Noise Level Declaration
10
Vibration Declaration
11
Post Delivery Checks
12
Machine Data
14
Skip & Loading Information 14
Steering 15
Transmission 15
Brakes 15
Engine 15
Vehicle Identification Plate - VIN 15
Safety Decals and Descriptions
16
Safety Information
18
ROPS 22
Seatbelt & Seat Adjustment 23
Battery Isolator 26
Warning Others 27
Skip Prop 28
Engine Canopy
29
Driving Controls
30
Starting Procedure 31
Moving forwards & Backwards 31
Acceleration 32
Slowing Down / Stopping 32
Steering the dumper 32
Skip Control 32
Dashboard Warning Lights
33

8
Contents
Page No.
Safe Operating Instructions
35
Visibility 36
Climbing / Descending Gradients 37
Crossing Gradients 38
ROPS 39
Transportation 40
Towing Procedure 41

9
Engineering
(Hamiltonsbawn)
Ltd.
Manufacturers of Agricultural and Industrial Equipment
2 Killyrudden Road, Hamiltonsbawn, Tel: 028
38871970
Richhill, o. Armagh.
Fax: 028 3887 0362
Northern Ireland. E.mail: info@nc engineering.com
8T619SF www.nc-engineering.com
EC – DECLARATION OF CONFORMITY
Machine description : Site Dumper
Make NC
Type SW1.5
Manufactured by NC Engineering (Hamiltonsbawn) Ltd
Address: 2 Killyrudden Road, Hamiltonsbawn Richhill,
Co. Armagh. BT61 9S
This machinery has been designed and manufactured in accordance with the following European
Standards: -
2006/42/CE: Machinery Directive
Measured Sound Power Level: 98 dB LWA
Guaranteed Sound Power Level: 99 dB LWA
Net Installed Power: 17.5kW
A technical construction file for this machine is retained at the above address.
Declaration
Signed: ______________________________________
Name: David Wilson CEng; MSc; MIAgrE
Being the responsible person appointed by the manufacturer (or nominated representative of the manufacturer established in
the EC) and employed by:
NC Engineering (Hamiltonsbawn) Ltd
This declaration of Conformity complies with Regulation 22 of The Supply of Machinery (Safety) Regulations 1992

10
Noise Level Declaration
The noise levels are measured according to ISO6395:1998
The noise level of this machine is
L
WA
99dB ( A )
L
PA
82dB ( A )
L
WA
:- A - Weighted sound power level.
L
PA
:- A - Weighted sound pressure level.
Tabla de contenidos
Manuales populares de Cortacésped de otras marcas

TALEN TOOLS
TALEN TOOLS AVR HGM30 Manual de usuario

DEWEZE
DEWEZE ATM-725 Manual de operación

Weed Eater
Weed Eater 180083 Manual de usuario

Husqvarna
Husqvarna Poulan Pro PP185A42 Manual de usuario

Better Outdoor Products
Better Outdoor Products Quick Series Manual de usuario

Cub Cadet
Cub Cadet 23HP Z-Force 60 Manual de funcionamiento











