Mueller CP2-10 Manual de usuario

Part No. 8826238
Effective May 15, 2009
Revised January 31, 2019
Compact Chiller
Models CP2-10 a d CP2-20
INS ALLA ION AND OPERA ION MANUAL


Sectio 1.0 – I troductio
1.1 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .1
1.2 Technical Support . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .1
1.3 Safety Statement . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .1
1.4 Intended Use of Equipment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .1
1.5 Misuse of Equipment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .1
Sectio 2.0 – Descriptio of the Equipme t
2.1 Equipment Components . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .2
Figure 1: Compact Chiller Cooling System . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .2
Figure 2: Compact Chiller Cooling System Dimensions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3
2.2 Refrigeration Components . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3
2.3 Evaporator . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3
2.4 Liquid Solution Flow Components . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4
2.5 Electrical Components . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4
2.6 Control Operation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4
Sectio 3.0 – I stallatio
3.1 Inspection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .5
3.2 Location . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .5
3.3 Chilled Solution Piping . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .5
3.5 Condensing Unit Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .6
Table 1: E-Star HiPerForm Refrigerant Charge (CP2-10 Only) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .6
3.6 Condensing Unit Expansion Valve Sizing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .6
Table of Co te ts
Compact Chiller
Models CP2-10 a d CP2-20
INS ALLA ION AND OPERA ION MANUAL
Mueller Compact Chiller Models CP2-10 and CP2-20 Effective May 15, 2009
Installation and Operation Manual, Part No. 8826238 Revised January 31, 2019

Table of Co te ts
Sectio 4.0 – Clea i g the System
4.1 First Time Start-Up . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .7
4.2 Leak Testing Procedure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .7
4.3 Cleaning Procedure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .7
4.4 Filling the Reservoir . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .7
4.5 Liquid Solution for Instant Cooling . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .8
Table 2: Typical Freezing Points of Aqueous Solution of Dowfrost™ . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .8
Sectio 5.0 – Evacuatio , Chargi g, a d Start-Up of System
5.1 System Evacuation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .9
5.2 System Charging (Also Refer to Condensing Unit Manual) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .9
5.3 System Start-Up . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .9
5.4 Temperature Control Calibration Accuracy . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .10
Mueller Compact Chiller Models CP2-10 and CP2-20 Effective May 15, 2009
Installation and Operation Manual, Part No. 8826238 Revised January 31, 2019

Mueller Compact Chiller Models CP2-10 and CP2-20 Effective May 15, 2009
Installation and Operation Manual, Part No. 8826238 Revised January 31, 2019
1.1 GENERAL
Mueller® compact chillers are designed to provide the efficient production of a chilled liquid cooling solution while
requiring minimal installation time and maintenance.
1.2 ECHNICAL SUPPOR
This manual provides the basic installation and operating information for a Mueller compact chiller. Please
contact your local Paul Mueller Company Sales and Service Representative if you require additional technical
assistance pertaining to installation or operating procedures.
IMPORTANT: The i formatio i this ma ual must be followed closely to preve t equipme t damage.
Manufacturer’s support is available by contacting the following:
Paul Mueller Compa y
Dairy Farm Equipment Service Department
1600 West Phelps Street
Springfield, Missouri 65802
Direct Telephone: 1-800-756-5991
Facsimile: 1-800-436-2466
Email: DFETechService@paulmueller.com
1.3 SAFE Y S A EMEN
Electrical and refrigeration installation and service must be performed by an authorized service technician who
has the proper training to install and service refrigeration and electrical equipment.
Local, state, and/or country electrical and refrigeration regulations must be followed during installation, service,
and/or operation of this equipment.
1.4 IN ENDED USE OF EQUIPMEN
The Mueller compact chiller is designed to be incorporated with a Mueller Accu-Therm® plate cooler and Mueller
E-Star® HiPerForm® condensing unit of sufficient size to complete a complex assembly for cooling milk.
1.5 MISUSE OF EQUIPMEN
IMPORTANT: A y misuse of the Mueller compact chiller may result i damage to the u it a d/or
perso el. Do ot allow objects to be placed o or arou d the chiller that block access.
Sectio 1.0 – I troductio

Mueller Compact Chiller Models CP2-10 and CP2-20 Effective May 15, 2009
Installation and Operation Manual, Part No. 8826238 Revised January 31, 2019
2.1 EQUIPMEN COMPONEN S
A. System Features
• One (1) 90-gallon insulated reservoir
• One (1) 3 hp circulator pump
• One flow switch
• Two (2) evaporator heat exchangers for two (2) 5 hp or two (2) 9 hp condensing units
• A control cabinet with temperature controls, circulator pump contactor, and ON/OFF switch
B. System Component Requirements
• One (1) Mueller CP2 compact chiller
• Two (2) 5 hp or 3.5 hp Mueller E-Star HiPerForm “OHSE” or “OESE” condensing units
– or –
• Two (2) 9 hp Mueller E-Star HiPerForm “OHSE” or “OESE” condensing units
• Refrigerant piping
• One (1) Mueller Accu-Therm plate cooler
FIGURE 1: COMPAC CHILLER COOLING SYS EM
1 - Mueller E-Star HiPerForm “OHSE” condensing units for chiller.
2 - Cold chiller water to the Mueller Accu-Therm plate cooler.
3 - Return water to the Mueller compact chiller.
4 - Warm milk to be cooled.
5 - Cooled milk to the Mueller milk cooler storage tank.
2
Sectio 2.0 – Descriptio of the Equipme t
1
Mueller® Compact Chiller Mueller Accu-Therm® Mueller Milk Cooler
5
2
3
4

Mueller Compact Chiller Models CP2-10 and CP2-20 Effective May 15, 2009
Installation and Operation Manual, Part No. 8826238 Revised January 31, 2019
FIGURE 2: COMPAC CHILLER COOLING SYS EM DIMENSIONS
2.2 REFRIGERA ION COMPONEN S
The Mueller CP2-10 compact chiller is designed to operate with two Mueller 3.5 or 5 hp E-Star HiPerForm “OHSE”
condensing units for maximum performance and efficiency or two 5 hp E-Star “OESE” thermal expansion valve
condensing units. The Mueller CP2-20 compact chiller is designed to operate with two Mueller 9 hp E-Star
HiPerForm “OHSE” condensing units for maximum performance and efficiency or two 9 HP E-Star “OESE”
thermal expansion valve condensing units. Refer to the respective E-Star HiPerForm “OHSE” or “OESE”
condensing unit manual for technical information.
2.3 EVAPORA OR
The Mueller compact chiller uses two totally enclosed, heavy-duty stainless steel evaporators that will provide
years of trouble-free operation when properly installed and controlled; however, like any low temperature chiller
evaporator, may be susceptible to non-warranted damage if the chilled liquid solution is allowed to freeze.
The Mueller compact chiller is not designed to operate at chilled solution temperatures below 34°F without
properly protecting the system with a 20% (18.5°F) to 25% (14°F) mixture of Dowfrost propylene glycol. If a
propylene glycol other than Dowfrost is used, the mix ratio must achieve a 15°F freeze point.
NOTE: Contact the Mueller Dairy Farm Equipment Service Department prior to making any temperature setpoint
ad ustments below 34°F.
IMPORTANT: The circulatio of a co trolled warm water or a completely drai ed evaporator is
ma datory duri g pump dow or refrigera t recovery to elimi ate evaporator damage due to freezi g.
3
54"
52"
31"

Mueller Compact Chiller Models CP2-10 and CP2-20 Effective May 15, 2009
Installation and Operation Manual, Part No. 8826238 Revised January 31, 2019
2.4 LIQUID SOLU ION FLOW COMPONEN S
A 3 hp centrifugal pump circulates the chilled solution from the reservoir, through the evaporator heat exchangers
and remote Accu-Therm plate cooler, and back to the reservoir.
The chilled-liquid circulation system incorporates a threaded suction screen located internally in the reservoir at
the suction connection. This will prevent particulate matter from entering the circulation pump, evaporator heat
exchanger, and Accu-Therm plate cooler. It should be removed and cleaned as necessary.
Isolation valves are provided in the liquid solution lines for servicing the pump.
The system has two liquid solution flow switches that utilize normally open (N.O.) contacts connected in series to
the chiller control. In the event of a pump failure, flow blockage, or loss of liquid solution, the paddle in one of the
flow switches will open and de-energize both condensing units. In the event that one of the flow switches breaks
the control circuit and de-energizes the condensing units, the units will re-energize when the switch is closed
again, indicating adequate fluid flow.
This condition indicates that there was a flow restriction and a service technician should be contacted to
troubleshoot and repair the cause prior to multiple restarts.
IMPORTANT: The above co ditio could be caused by improper temperature setti gs of the electro ic
temperature co trol. Multiple restarts prior to repair or adjustme t could cause a o -warra ted failure
of a evaporator due to expa sio from freezi g.
The 90-gallon insulated reservoir is constructed of polyethylene. The cover should remain on the reservoir at all
times to prevent particulate and contaminants from entering the liquid solution.
2.5 ELEC RICAL COMPONEN S
The Mueller compact chiller comes with a complete electrical control system. The electronic temperature control
is housed in a separate enclosure. The multi-stage chiller control must be mounted and wired to the flow switches
condensing units, temperature sensors, and pump.
The power supply must be connected to a 240 volt, 60 hertz, single-phase fused disconnect, fused at a maximum of
20 amps.
IMPORTANT: Do ot expose the electrical co trol e closure to ambie ts above 140°F or below 32°F.
All wiring must be performed in accordance with the National Electric Code (NEC) or regulatory agency for the
installation locality.
2.6 CON ROL OPERA ION
See the Mueller multi-stage chiller control manual (Part No. 8825582) for control operation.
4

Mueller Compact Chiller Models CP2-10 and CP2-20 Effective May 15, 2009
Installation and Operation Manual, Part No. 8826238 Revised January 31, 2019
3.1 INSPEC ION
Due to the possibility of equipment damage during shipment, it is recommended that you make a thorough
inspection of all equipment before it is unloaded from the freight carrier. Carefully inspect equipment for hidden
damage. It may be difficult to collect for damage if it is not found prior to unloading. If any damage is found, it is
very important to note the damage on the bill of lading and have the driver sign the bill of lading.
3.2 LOCA ION
When choosing a location for the Mueller compact chiller, consider these items:
•E viro me t: An indoor location will be necessary where the chiller is protected from freezing temperatures.
•Serviceability: The chiller should be located with the circulating pump and the electronic temperature
control accessible for service. Keep in mind the chiller will require field connections to the main electrical
supply and the liquid solution reservoir may require a drain for maintenance.
•Co de si g U its: The condensing units must be located where they are protected from the environment
and have adequate air flow for the condensers. Be especially cautious for conditions that would allow dust or
oil to enter the condenser.
•Efficie cy: Locate the chiller as close to the Mueller Accu-Therm plate cooler as possible. This will improve
efficiency by reducing heat gain and flow restrictions in the chilled liquid solution piping.
3.3 CHILLED SOLU ION PIPING
The piping between the Mueller compact chiller and the Mueller Accu-Therm plate cooler should be a minimum of
3" Schedule-40 or -80 PVC, stainless steel, or copper pipe. Make any reducer connections at the Accu-Therm and
install a union and shut-off valve in each line for service.
If PVC plastic pipe is used with solutions containing propylene glycol, the manufacturers’ of PVC or CPVC pipe
recommend that Schedule-80 purple primer and Schedule-80 gray adhesive be used. The following procedure
should be used to assemble PVC or CPVC:
1. Scour primer with a hard bristle brush. It should be alternately applied to the surface of the pipe once and to
the fitting socket twice.
2. Solvent cement should be applied with a stiff bristle brush while the primer is wet. It should be alternately
applied to the surface of the pipe twice and to the fitting socket once.
IMPORTANT: Galva ized pipe should ot be used for applicatio s with propyle e glycol, as propyle e
glycol ca strip the zi c coati g from galva ized pipe.
To provide efficient, chilled liquid solution flow to the Accu-Therm plate cooler, utilize long-radius fittings and 45-
degree elbows where possible. A non-absorbent pipe insulation should be installed on both pipes to reduce
sweating and heat gain of the chilled liquid solution piping.
5
Sectio 3.0 – I stallatio

Mueller Compact Chiller Models CP2-10 and CP2-20 Effective May 15, 2009
Installation and Operation Manual, Part No. 8826238 Revised January 31, 2019
3.5 CONDENSING UNI INS ALLA ION
Refer to the Mueller E-Star HiPerForm “OHSE” or “OESE” condensing unit manual for installation information.
The condensing units, pre-assembled line sets, and compact chiller refrigeration circuit will require a triple
evacuation to 500 microns prior to refrigerant charging. The system must hold below 1,000 microns in a standing
vacuum test, ensuring that it is leak free.
Mueller E-Star HiPerForm condensing units require a refrigerant charge correction for use with the Mueller
compact chiller. Table 1, “E-Star HiPerForm Refrigerant Charge,” should be followed. The table displays only a
startup refrigerant charge. Normal refrigeration unit startup procedures, located in the condensing unit manual,
should be followed when ad usting to final operating charge. Refer to the respective E-Star HiPerForm “OHSE” or
“OESE” condensing unit manual for technical information.
ABLE 1: E-S AR HIPERFORM REFRIGERAN CHARGE (CP2-10 ONLY)
IMPORTANT: The circulatio of co trolled warm water or a completely drai ed evaporator is ma datory
duri g pump dow or refrigera t recovery to elimi ate evaporator damage due to freezi g.
3.6 CONDENSING UNI EXPANSION VALVE SIZING
6
U it Size Part No. R-507
5 hp 9843711 Y573-SPE-4-PC
10 hp 8825850 EBSPE-7.5-PC
U it Size R-507 Refrigera t Charge
3.5 hp 12.0 lbs
10 hp 13.0 lbs
Otros manuales para CP2-10
1
Este manual sirve para los siguientes modelos
1
Tabla de contenidos
Otros manuales de Enfriador de Mueller























