Master FWT40 Manual de usuario

Henan Master Machinery Co., Ltd
Tel:(+86)17737606271 www.mastermachinerys.com
1
OPERATION MANUAL
FWT40 Edge Power Trowel l
P E R F O R M A N C E · E F F I C I E N T · R E L I A B L E
Master sincerely thanks you for selecting the Plate
Compactor Machine. For your Safety and proper operation,
before you start to operate or carry out any maintenance on
this equipment, YOU MUST READ and STUDY this manual
carefully. Be sure to always keep it ready for reference.
Produced By Henan Master Machinery Co.,Ltd
Dear Customer,
Thanks for choosing Master machine.
To ensure the safety and proper use of the machine,
please read the instruction book carefully before use.

Henan Master Machinery Co., Ltd
Tel:(+86)17737606271 www.mastermachinerys.com
2
Also, please fill this card and save it for warranty use.
Buyer Name
Purchase
Time
Tel
Contact
Person
Address
Product
Name
Power Trowel
MODEL
FWT24
Motor Model
Note
CONTENTS
Contents …………………………………………………………1
Quality assurance/machine break-in …………………………2
Edger Power Trowel warranty ………………….…………………2
Maintenance record …………………………………………3
Routine service intervals ………..………………………………6
Forward …………………………………………………………7
Safety precautions ………………………………………………7
Assembly instructions ……………………………………………8
Operation (Floating) ……………….………………………………9
Operation (Finishing) ………….………………………………9
Starting procedure …………….………………………………10
Stopping procedure ……………….……………………………10
Maintenance ……………………………………………………11
Belt tension ………………..…………………………………11

Henan Master Machinery Co., Ltd
Tel:(+86)17737606271 www.mastermachinerys.com
3
Transporting ………………..…………………………………11
Lubrication …………………..…………………………………11
Storage …………………..……………………………………12
Troubleshooting ………..……………………………………13
Specifications …………..……………………………………15
Diagram …………………..…………………………………18
QUALITY ASSURANCE/MACHINE BREAK IN
The Edger Power Trowel is the product of extensive engineering development
designed to give long life and unmatched performance. The Edger Power Trowels
are shipped fully assembled, and only require filling with fuel and a brief check of
lubricant levels in preparation for operation.
You can help ensure that your Power Trowel will perform at top levels by
observing a simple routing on first use. Consider that your new Power Trowel is
like a new car. Just as you would break in a new a car to the road or any new
machine to the job, you should start gradually and build up to full use. Learn what
your machine can do and how it will respond. Refer to the engine manufacturer's
manual for run-in times. Full throttle and control may be used after this time
period, as allowed by material. This will serve to further break in the machine on
your specific application, as well as provide you with additional practice using the
machine.
We thank you for the confidence you have placed in us by purchasing an Edger
Power Trowel and wish you many years of satisfied use.
EDGER POWER TROWEL WARRANTY
The Engineering agrees to furnish without charge, F.O.B. our plant, a replacement
for any part or portion thereof, comprising the main unit of the Edger Power
Trowel, consisting of the drive shaft assembly and the gear case assemblies, save
and except drive belts, and power units, and/or bearing or electrical controls which
prove upon our examination, to be defective in either material or workmanship

Henan Master Machinery Co., Ltd
Tel:(+86)17737606271 www.mastermachinerys.com
4
within a period of twelve (12) months from date of purchase, provided that notice
of such defective part or portion thereof is given to the Engineering within the
twelve month warranty period. No further or other guarantee or warranty
expressed or implied in connection with the sale of the Edger Power Trowel is
given and our sole liability consists in replacing defective parts or portions thereof.
We shall not be responsible for any special, indirect or consequential damages
arising in any manner whatsoever.
This guarantee is for the sole benefit of the original purchaser as end user. Our
responsibility under this guarantee ends in the case the original purchaser transfers
ownership of the Edger Power Trowel, makes any changes or adds any parts or
devices not of our manufacture to the Edger Power Trowel.
MAINTENANCE RECORD
PREVENTATIVE MAINTENANCE AND ROUTINE SERVICE PLAN
This Edger Power Trowel has been assembled with care and will provide years of
service. Preventative maintenance and routine service are essential to the long life
of your Power Trowel. Your dealer is interested in your new machine and has the
desire to help you get the most value from it. After reading through this manual
thoroughly, you will find that you can do some of the regular maintenance
yourself. However, when in need of parts or major service, be sure to see your
Morrison dealer. For your convenience we have provided this space to record
relevant data about your Edger Power Trowel. When in need of parts or service be
prepared to provide your Trowel serial number. Locate the serial number now and
record in the space below.
Date
Purchased:
Type of
Machine:
Dealer Name:
Model:

Henan Master Machinery Co., Ltd
Tel:(+86)17737606271 www.mastermachinerys.com
5
Dealer Phone:
Serial Number:
REPLACEMENT PARTS USED
MAINTENANCE LOG
PART
NO.
QUANTI
TY
COST
DATE
DATE
OPERATION
Routine Service
Intervals
Eac
h
use
After
1.5
months
or
50hrs
Each 3
months
or
100hrs
Each 6
months
or
200hrs
Each 9
months
or
300hrs
Each 12
months
or
400hrs
General Inspection:
Guards
Check
○
○
○
○
○
Warning
stickers
Check
○
○
○
○
○
Test run
Check
operation
○
○
○
○
○
Controls:
Dead-ma
n switch
operation
Check
○
○
○
○
○
○
Pitch
control
assembly
Check
○
○
○
○
○
○
Lubricate
○
○
○
○
○
Engine:
Engine
oil
Check
level
○
○
○
○
○
○

Henan Master Machinery Co., Ltd
Tel:(+86)17737606271 www.mastermachinerys.com
6
Change
○
○
○
Engine
oil filter
Replace
○
○
Oil
cooler
Clean
○
○
○
○
Cooling
Fins
Clean
○
○
○
○
○
Air
cleaner
Check-cle
an
○
○
○
○
○
○
Replace
○
Air
Intake
Line
Check
○
Replace
2 yrs
Fan Belt
Check
tightness
○
○
Replace
500 hrs
Valve
clearance
Check-adj
ust
○
○
Fuel
filter
Check &
Clean
○
○
○
○
Replace
○
○
Fuel
Tank
Clean
500hrs
Engine
wiring
Check
○
Drive Train:
Clutch/P
ulley
Check
○
○
○
○
○
○

Henan Master Machinery Co., Ltd
Tel:(+86)17737606271 www.mastermachinerys.com
7
operation
Spider
plate
assembly
Check
○
○
○
○
○
○
Lubricate
○
○
V-Belt
Check
○
○
○
○
○
○
Blades
Check
○
○
○
○
○
○
Gearbox:
Gearbox
oil
Check
level
○
Replace
○
○
Gearbox
breathers
Check
operation
○
○
○
○
Routine Service Intervals
Due to the nature and environment of use, Edger Power Trowels could
be exposed to severe operating conditions. Some general maintenance
guidelines will extend the useful life of your trowel.
The initial service for your trowel should be performed after 25 hours of
use, at which time
your mechanic (or authorized repair shop) should complete all of the
recommended checks in the schedule above. The chart on page 6 (six) is
handy for keeping a record of the maintenance performed and the parts used
for servicing your trowel.
Regular service according to the schedule above will prolong the life of the
Edger Power Trowel and prevent expensive repairs.
Keeping your Edger Power Trowel clean and free from debris is the single

Henan Master Machinery Co., Ltd
Tel:(+86)17737606271 www.mastermachinerys.com
8
most important regular maintenance operation, over and above the checks in
the service schedule above, that can be performed. After each use your Edger
Power Trowel should be cleaned to remove any dust and debris from the
undercarriage and surrounding components. Use of a power washer will
make clean up quick and easy, especially if a non-stick coating was applied
prior to use.
In the Service Schedule above, items that should be checked, replaced or
adjusted are indicated by "○" in the appropriate column. Not all Edger Power
Trowel models include the same features and options and as such not all
service operations may have to be performed. For ease of recording place a
checkmark (√) through the "○" when the item is complete. If an item is not
required or not complete place an "×" through the "○" in the box.
All Edger Power Trowel have governed engine speed of 3600 rpm. See
engine manufacturer's manual for exact specifications. Care should be used
when making any adjustments to the Edger Power Trowel not to and lower
travel speed. It will create excessive "out-of-synch" vibrations resulting in
poor compaction,
maneuverability, excessive wear to the machine, and discomfort to the
operator.
Failure to have your Edger Power Trowel regularly serviced and properly
maintained in accordance with the manufacturer's instructions will lead to
premature and void the warranty.
FORWORD
The Bartell Edger Power Trowel, also known as a Mini-trowel/Edger, has been
developed to float and finish the edges of concrete floors, up to perimeter walls,
around columns and small areas, eliminating tiring hand troweling and increasing
overall productivity and quality.

Henan Master Machinery Co., Ltd
Tel:(+86)17737606271 www.mastermachinerys.com
9
SAFETY PRECATIONS
1. Always keep unauthorized, inexperienced, untrained people away from this
machine.
2. Rotating and moving parts will cause injury if contacted. Make sure guards are
in place. Keep hands and feet away from moving parts.
a. Fuel the machine only when the engine is stopped, using all necessary safety
precautions.
b. The engine must always be stopped before attempting any repair or
adjustments. Ignition switch should be off.
c. To avoid slipping and loss of control when starting the trowel, the operator
should maintain good footing. It is recommended that the operator wear safety
shoes for added protection.
Be careful when working around pipes or ducts protruding from the floor or
slab edges. If the trowel blades hit such obstacles, damage to the machine or
possible operator injury may result.
When starting the machine, do not exceed 1/3 throttle position. A higher
setting may cause the Centrifugal clutch to engage and the handle to rotate.
1. Be careful not to come in contact with the muffler when the engine is hot,
serious burns may result!
Over time, the blades will form a sharp edge. Be careful when handling the
old blades.
DANGER:Never operate the machine in an explosive atmosphere, near
combustible materials or where ventilation does not clear exhaust fumes. Repair
fuel leaks immediately. Refer to your engine owner's manual for more safety
instructions.
ASSEMBLY INSTRUCTIONS
Your new Bartell Edger Power Trowel has been shipped to you fully assembled.

Henan Master Machinery Co., Ltd
Tel:(+86)17737606271 www.mastermachinerys.com
10
All you need to do is unfold the handle and fasten the knob. Remove any shipping
or packing materials. Be sure to remove and discard the band securing the
safety/stop switch to the left handle. This serves only to facilitate shipping and is
not intended to be a permanent feature. When removing the machine from the
carton, be careful to use the handles to left the unit from the carton. NEWER LIFT
THE MACHINE BY THE RING OR DISC. Filling the fuel tank and a brief check
of lubricant levels in preparation for operation is required.
IMPORTANT: Before running machine with belt installed, ensure that engine
idles properly and that the safety-switch shuts off the engine.
ATTENTION: For any information regarding engine adjustments, please refer to
the engine manual supplied.
OPERATION (Floating)
When the slab has set sufficiently firm that the operator's footprint leaves a very
slight depression on the surface of the slab, it is ready for the floating operation.
Guiding the machine on the slab is very simple; a slight upward lift of the handle
causes the machine to travel to the left. Holding the handle in the neutral position,
will slowly cause the machine to spin in one spot. Slight downward pressure on
the handle cause the machine to the travel to the right. Best results are obtained by
covering approximately 4" on each turn. In other words, let the machine move
right or left, backwards or forwards, approximately 4" with each revolution of the
trowels. To fill a hole or cut down hump, move the unit back and forth over the
problem area.
Under normal operating conditions the machine should cover as much as 1000 sq.
ft. in about 15 minutes. It is recommended that a slight tension on the trowel
control cable, (but not a definite tilt), during the floating operation will cause the
machine to operate much smoother. After the floated slab has set sufficiently, it is
ready for the finishing operation.
CAUTION: Do not let the machine stand in one spot on the soft cement. Lift
Otros manuales para FWT40
1
Este manual sirve para los siguientes modelos
1
Tabla de contenidos
Otros manuales de Paleta de Master


















