6/27
3. Make the connection using a three-pole cable (3 phase + earth) of proper section.
4. The electric cable must be connected downward to the terminal board inside the electric
panel and upward to a distribution board with: switch, bloc-tap, fuses.
5. Make the earth connection using the electric line and the special screw.
6. Check if the rotation of the drum, of the cable-drum and of the scraping-shovel is the one
shown by the signaling otherwise switch the wires in the electric panel.
MIXER WITH INTERNAL COMBUSTION MOTOR
Does not need any other contrivance.
10 START UP
After having connected and locked the plug, turn on the mixer with the green start push
button. The electronic panel consists of an a start push button and a mush-room-head push-
button. The plug is situated belong. The start button has the function of leaving the coil of
minimum tension. To reset the switch and restart the machine after an unexpected power cut,
press the switch. When there is a stop of the machine at first tour the Mush-room-head
pushbutton then push the start button again.
11 USE
•Only the operator can stay near the machine during the machine work
•Do not use the machine in resort where there is fire dangerous. can spark could cause
fires or explosions.
•Before leaving the machine tour the motor off.
•During machine transport make attention the motor is turned off.
•Verify that the voltage correspond of the one indicated on the plate.
•Check that if the electronic line has protection upstream
•Check that the drum rotation is anti-clockwise.(drum view).
•Connect the machine to the electric line. Turn on the machine.
•Absolutely avoid occasional or temporary connection not in conformity with the
regulations.
•Cheek to see if the tension is suitable for the machine.
•Lower the hopper pushing the lever in the direction shown by the plate after having
removed the safety-bolt.
•Load the material in the hopper. (if you must use scraping-shovel, make sure that the draw
steel cable does not exceed the front feet)
•Let flow the necessary water in the drum.
•Let the drum rotate in the “mix” direction.**
•Raise the hopper pushing the distributor level, stopping a few times to discharge the
material and add more water.
•Lower the hopper again and wait as long as requested from the mix, adding more water if
needed. To discharge the mix stop the rotation and after a few second rotate the drum in
the direction of “discharge”.**
•**For such operations push the button in the electronic box or the reversing gear level for
the concrete mixer with internal-combustion engine.