Sliding gate opener SLG5400XAC/SLG5550XAC//SLG5750XAC (SL07X0) user manual A5
7
Cable installation
Please bury the motor & power cable and controlling cable with PVC tube, and use two PVC tubes
to bury (motor & power cable) and (controlling cable) separately, so as to guarantee normal
operation of the gate opener and protect the cables from damages.
Concrete pedestal
Please cast a concrete pedestal with the size of 500mm x 300mm and depth of 250mm in advance,
so as to firmly install SLG5400X, SLG5550X, SLG5750X gate opener. Please verify whether the
distance between the gate and gate opener is suitable before casting the pedestal.
Embedded screws
Figure 4
4.3.2 Main engine installation
a) Dismantle the plastic housing on the main engine before installation and keep relevant fasteners
properly;
b) Please prepare the power line for connecting mounting plate and main engine (the number of
power supply cable core shall not be less than 3 PCS, the sectional area of cable core shall not be
lower than 1.5mm²and the length shall be determined by users according to the field situation) due
to different installation environments;
c) Please unlock the main engine before installation, the unlock method is: take out the key cover,
insert the key, and open the manual release bar till it rotates by 90°as shown in Figure 5. Then turn
the output gear and the gear can be rotated easily;