Gamry VistaShield Stir/Purge Manual de usuario

VistaShield
Stir/Purge
Operator’s Manual


i
If You Have Problems
Please visit our service and support page at www.gamry.com/service-support/. This page contains information
on installation, software updates, and training. It also contains links to the latest available documentation. If you
are unable to locate the information you need from our website, you can contact us via email using the link
provided on our website. Alternatively, you can contact us one of the following ways:
Internet www.gamry.com/service-support/
Telephone (215) 682-9330 9:00 AM–5:00 PM US Eastern Standard Time
(877) 367-4267 Toll Free US & Canada Only
We will be happy to provide a reasonable level of free support for registered users. Reasonable support includes
telephone assistance covering the normal installation and use of the VistaShield Faraday Cage with Stir/Purge
option.
A service contract that extends both the hardware warranty and software-update period is available at an
additional charge. Software updates do not include software enhancements offered to our customers at
additional cost.
Enhancements to the Stir/Purge and Gamry’s standard applications software that require significant engineering
time on our part may be performed on a contract basis. Contact us with your requirements.
Copyright 2012–2017 Gamry Instruments, Inc.
Revision 1.31
December 6, 2017
988-00018

ii
Limited Warranty
Gamry Instruments, Inc. warrants to the original user of this product that it shall be free of defects resulting from
faulty manufacture of the product or its components for a period of two years from the original shipment date
of your purchase.
Gamry Instruments, Inc. makes no warranties regarding either the satisfactory performance of the VistaShield
with Stir/Purge including the software provided with this product or the fitness of the product for any particular
purpose. The remedy for breach of this Limited Warranty shall be limited solely to repair or replacement, as
determined by Gamry Instruments, Inc., and shall not include other damages.
Gamry Instruments, Inc. reserves the right to make revisions to the system at any time without incurring any
obligation to install same on systems previously purchased. All system specifications are subject to change
without notice.
There are no warranties which extend beyond the description herein. This warranty is in lieu of, and
excludes any and all other warranties or representations, expressed, implied or statutory, including
merchantability and fitness, as well as any and all other obligations or liabilities of Gamry Instruments,
Inc; including but not limited to, special or consequential damages.
This Limited Warranty gives you specific legal rights and you may have others, which vary from state to state.
Some states do not allow for the exclusion of incidental or consequential damages.
No person, firm or corporation is authorized to assume for Gamry Instruments, Inc., any additional obligation or
liability not expressly provided herein except in writing duly executed by an officer of Gamry Instruments, Inc.

iii
Disclaimers
Gamry Instruments, Inc. cannot guarantee that the VistaShield’s Stir/Purge will work with all computer systems,
operating systems, and third-party software applications hardware/software.
The information in this manual has been carefully checked and is believed to be accurate as of the time of
printing. However, Gamry Instruments, Inc. assumes no responsibility for errors that might appear.
Copyrights
VistaShieldFaraday Cage with Stir/Purge Operator's Manual: copyright 2017, Gamry Instruments, Inc.,
all rights reserved.
Gamry Framework: copyright 1989–2017, Gamry Instruments, Inc., all rights reserved.
VistaShield, Stir/Purge, Reference 600, PC4, PCI4, Series G, and Gamryare trademarks of Gamry
Instruments, Inc.
No part of this document may be copied or reproduced in any form without the prior written consent of Gamry
Instruments, Inc.

iv

Copyrights -
Table of Contents
If You Have Problems i
Limited Warranty ii
Disclaimers iii
Copyrights iii
Chapter 1: Safety Considerations 1-1
Inspection 1-1
Product safety 1-1
AC mains connection to the power supply 1-1
Grounding in the VistaShield and Stir/Purge 1-2
Temperature and ventilation 1-2
Environmental limits 1-3
Use with dangerous materials 1-3
Cleaning 1-3
Leakage into the Stir/Purge 1-4
Service 1-4
RFI Warning 1-4
Electrical Transient Sensitivity 1-4
CE Compliance 1-5
RoHS Compliance 1-5
Chapter 2:Introduction 2-1
About this manual 2-1
Why purge? 2-1
About the VistaShield and Stir/Purge 2-1
Notational conventions 2-2
Chapter 3: Unpacking and Installation –Complete Unit 3-1
Unpacking 3-2
Initial visual inspection 3-2
Physical location 3-2
VistaShield Stir/Purge setup options 3-2
Software Installation 3-3
USB Port 3-3
Power cord and power connection 3-3
Power-up test 3-4
Gas Fitting Installation 3-5
Chapter 4: Adding a Stir/Purge to a VistaShield and Stand-Alone Operation 4-1
Unpacking 4-1
Mounting the Stir/Purge to the VistaShield 4-1
Installation of the Stir/Purge as a stand-alone system 4-2
Disassembly of the Stir/Purge from the VistaShield 4-3
Chapter 5: Panel Indicators and Controls 5-1
Front panel 5-1
The POWER Switch and LED 5-1
REMOTE LED 5-1
Stir Speed Knob 5-1
STIR Toggle and LED 5-2
GAS Toggle and LED 5-3
FLOW RATE Knob 5-3
Rear Panel 5-4
POWER IN jack 5-4

Copyrights -
USB port 5-4
CONTROL Digital I/O Connector 5-5
Gas connections 5-5
Chassis ground 5-6
Appendix A: Firmware Updates 6-1
Computer requirements 6-1
First-time device-installation in Windows®6-2
Appendix B: CE Certificate 6-3
Declaration of Conformity 6-3
Certificate of Conformance 6-4
Appendix C: Specifications 6-5
Appendix C: Specifications 6-5
Comprehensive Index 7-1

Chapter 1: Safety Considerations - Inspection
1 - 1
Chapter 1: Safety Considerations
Your VistaShield Stir/Purge has been supplied in a safe condition. This chapter of the Operator’s Manual
contains some information and warnings that you must follow to insure continued safe operation.
Inspection
When you receive your VistaShield Faraday Cage Stir/Purge, inspect it for evidence of shipping damage. If any
damage is noted, please notify Gamry Instruments Inc. and the shipping carrier immediately. Save the shipping
container for possible inspection by the carrier. The VistaShield itself has a conductive coating on the glass pane
in the door. If the glass is cracked, the conductivity could be broken, compromising the VistaShield’s ability to
function as a Faraday cage.
Product safety
The Stir/Purge option for the VistaShield Faraday Cage has been designed, tested and certified to meet the
requirements of IEC 1010, Safety requirements for electrical equipment for measurement, control, and
laboratory use. As defined in this standard, it is a Category III apparatus, designed for connection to low voltage
circuits.
The “AC Adapter” supplied with the Stir/Purge option is certified under EN 60950. The AC Adapter converts
the AC mains voltage to 12 V DC, which is used to power the Stir/Purge.
Always use the AC adapter supplied with your VistaShield Stir/Purge to supply DC power to the instrument.
AC mains connection to the power supply
The VistaShield Stir/Purge does not connect directly to an AC mains supply. Instead, the mains is connected to
the desktop AC-adapter, which outputs 12 V DC, which in turn powers the Stir/Purge.
The Stir-Purge’s AC Adapter is rated for operation from 100 to 240 volts AC,
47 to 63 Hz. It should therefore be useful throughout the world.
Warning! The door of the VistaShield contains a large pane of glass with a
conductive coating on the outside surface. Chips on the corners, while not affecting
performance, can have extremely sharp edges that represent a significant safety hazard.
Injuries from broken glass can be quite severe.
Caution: Use of a DC power source other than the AC-adapter model provided
with your Stir-Purge may void the performance and/or safety characteristics of the device.

Chapter 1: Safety Considerations - Grounding in the VistaShield and Stir/Purge
1 - 2
The VistaShield Stir/Purge is normally provided with an AC line cord suitable for your location. This AC line cord
connects the AC mains to the AC power adapter. If your VistaShield has been provided without an AC line
cord, or a cord that is not compatible with your local AC mains socket, obtain a line cord certified for use in
uncertain what AC line cord to use.
Grounding in the VistaShield and Stir/Purge
The circuitry and the metal case of the Stir/Purge are not connected to an earth ground. The Stir/Purge chassis is
normally in electronic contact with the VistaShield Faraday Cage above. Grounding is best accomplished by
connecting the ground lead of the potentiostat to the internal ground lug of the VistaShield Faraday Cage.
Proper grounding is required for the Faraday cage to function.
Most electrochemical cells are isolated from earth ground, in which cases isolation of the VistaShield from earth
is not required. Connection of the VistaShield to an earth ground (when allowed) may lower the noise seen in
an electrochemical test.
This connection of the VistaShield to an earth ground is not a “Protective Earth Ground” as defined in IEC
1010. The VistaShield Stir/Purge is safe in the absence of this connection, since it does not contain any
hazardous voltages.
The Stir/Purge can also be used without a VistaShield in a stand-alone configuration. Stand-alone operation is
also safe with regard to electrical shock hazards. In the unlikely event that you need to ground a stand-alone
Stir/Purge, you can connect a ground wire to one of the top cover mounting screws or to one of the metal nuts
holding a rear panel gas fitting in place.
Temperature and ventilation
Your VistaShield Stir/Purge was designed for indoor use at ambient temperatures between 0C and 45C. You
may need to ventilate or even cool the Stir/Purge with forced air if the temperature rises excessively.
Sources of earth ground include:
• Most metal water pipes,
• The chassis of most electronic apparatus (which are generally earth grounded), and
• The protective ground terminal of an AC mains power plug.
We recommend that you discuss grounding with an electrical or electronics professional
prior to making this earth ground connection.
Warning! Do not connect the VistaShield Faraday Cage’s ground binding post
to any voltage other than a potentiostat’s floating or earth ground. An improper connection
can create a safety hazard, which could result in personal injury or death.
Tabla de contenidos
Otros manuales de Equipo de laboratorio de Gamry
Manuales populares de Equipo de laboratorio de otras marcas

Agilent Technologies
Agilent Technologies 5800 ICP-OES Manual de usuario

Endress+Hauser
Endress+Hauser Cleanfit CPA875 Manual de usuario

NI
NI PXI-5422 Manual

Collomix
Collomix Aqix Manual de usuario

SPEX SamplePrep
SPEX SamplePrep 6875 Freezer/Mill Series Manual de usuario

Ocean Insight
Ocean Insight FLAME-NIR+ Manual de usuario














