
Manual P/N: 8.8520.00.0 Page: 1
Revision : A –October 15, 2001
1. INTRODUCTION
This document is intended to provide information to assist with the installation, use, maintenance and
replacement of the Fike FlamQuench IIM.
Fike Corporation has designed and manufactures the FlamQuench IIin two versions: an imperial size unit
specified according to NA standards, available in size 8”through 40”; and a metric version specified and built
for the CE market, available in size DN200 through DN1000.
2. GENERAL INFORMATION
2.1 DESCRIPTION
The Fike FlamQuench IIMis designed to allow for indoor explosion venting with flame arresting and
particulate retention. It consists of various layers of high temperature stainless steel that retain burned and
unburned dust and absorb heat produced during the explosion.
2.2 SERVICE QUALIFICATIONS
The information contained in this document is provided for reference purposes only. For further product
information or ordering replacement parts, please contact your local Fike Branch Office or Representative
(details of which can be found on the back page) or:
2.3 PERSONNEL SAFETY
WARNING: Mark a security distance of 8 feet (3 meters) around FlamQuench IIMStay out of this
area.
2.4 FlamQuench IISAFETY
WARNING: Any damage to the Filter may cause the FlamQuench IIMto malfunction, which may
result in a dust explosion in the surrounding area.
2.5 FlamQuench IIINSTALLATION PROCEDURE
WARNING: When installing do not damage filter. Any damage to filter may compromise the function
of the FlamQuench IIM.
Refer to Figure 1 (page 8) for assembly diagram.
Step 1: All system components shall be installed and the electrical and control systems thoroughly checked
by a qualified technician before proceeding with installation.
Step 2: Use provided lift ring(s) when installing FlamQuench IIM. The rings are located on the top and
bottom weldments. Do not attempt to lift FlamQuench IIMby any other method.
Step 3: Carefully clean gasket, explosion vent, and bolting pad surface (frame or flangering).
Step 4: Place gasket onto bolting pad
(AFM30/34 or similar is the recommended gasket material. Sealant
may be used, type may vary depending on process requirements)
. Be sure to line up holes.
Step 5: Place the explosion vent onto gasket with ID tag lettering facing up. Align holes.
Note: Explosion vent may be placed onto the FlamQuench IIMfirst. However you must wait until the
sealant has dried before continuing the installation. Follow the instructions on sealant for drying time.
WARNING: TAKE EXTREME CAUTION NOT TO DAMAGE EXPLOSION VENT WHEN INSTALLING
FlamQuench II. DAMAGE TO THE EXPLOSION VENT WILL CAUSE IT TO MALFUNCTION.