3
3.3.1 Additional Data Logging interfaces .................................................................33
4Installation procedure ....................................................................................................34
4.1 Position Control box and Hydroswitch / Connect. ................................................35
4.1.1 Antenna .............................................................................................................35
4.1.2 Battery ...............................................................................................................35
4.1.3 Hydroswitch ......................................................................................................35
4.2 Connection to the Flow meter ................................................................................36
4.3 Connect External Pressure transducers to Sentinel 2 ..........................................36
4.4 Check / modify Sentinel 2 channel settings...........................................................37
4.5 Re-zero Pressure transducers ................................................................................43
4.6 Prepare the pipework for the Sentinel 2................................................................45
4.7 Prepare the PRV for Sentinel water feed / pressure transducers........................46
4.8 Connect Sentinel side pipework .............................................................................47
4.9 Set Hydroswitch valve into Auto mode ..................................................................48
4.10 Connect transducers and control pipework on PRV side.....................................49
4.11 Preparing to fit the actuator ...................................................................................49
4.12 Fitting and adjusting the HWM mechanical actuator............................................51
4.13 Bleed air from the pipework and actuator ............................................................53
4.14 Test Pressure transducers ......................................................................................54
4.15 Testing the Actuator and PRV Pressure change response ...................................55
4.16 PRV Control method and Settings ..........................................................................56
4.16.1 Setup of pressure control using a Time profile..............................................56
4.16.2 Setup of a (pressure) Safety Override for Time Control................................58
4.16.3 Setup of pressure control using a Flow profile ..............................................58
4.16.4 Setup of pressure control using a combined Time and Flow profile ...........61
4.17 Setup for annual time adjustments .......................................................................61
4.18 Save Program / Activating Sentinel PRV control....................................................62
4.19 Setting Logger Startup / Measurement Sample Rates..........................................63
4.20 Setup of Data Delivery.............................................................................................63
4.20.1 Call-in times (schedule and protocol) .............................................................63
4.20.2 Destination........................................................................................................64
4.20.3 Setting Network access parameters ...............................................................65
4.21 Communications / Antenna location check...........................................................66
4.22 Verification of the configuration.............................................................................68
4.23 Protection from Frost ..............................................................................................68